Coppell Texas Directional Boring: Frio Soil, Denton Creek And Interstate 635

Quick Answer: The City of Coppell runs the public water system, while Dallas County electric reports include Oncor Electric Delivery Company; Belt Line Road conduit planning starts by confirming the line owner. We take directional boring, also called horizontal directional drilling (HDD), for Coppell routes under Belt Line Road, keeping pavement uncut. The Yukon main office is 200 road miles away, a factor on an Interstate 635 crossing. Frio silty clay can grip pipe, so reaming and pullback need close timing.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Coppell bores at a glance

  • Incorporated city in Dallas County and Denton County, Texas. Population 41,785 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 200 miles, about 4 hours of driving.
  • Ground: Frio soil is mapped on 15 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 7 percent of the area.
  • Highways inside the boundary: Interstate 635, Texas State Highway 121 and Texas State Highway 121 Business. State permit office: TxDOT Dallas District.
  • Railroad track inside the boundary: Fort Worth and Western Railroad, with 11 mapped street and rail crossings.
  • Named streams inside the boundary: Denton Creek, Grapevine Creek, Cottonwood Branch and Elm Fork Trinity River.
  • Public water: City of Coppell, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring in Coppell, Dallas County?

The City of Coppell owns the public water system, and electric service reports for Dallas County include Oncor Electric Delivery Company and other utilities. We confirm the line owner for the address before planning a conduit bore. The Census Bureau Vintage 2024 estimate puts Coppell at 41,785 people. We install water, sewer, gas, electric conduit and fiber lines along routes such as Belt Line Road, with potholing planned where they meet existing utilities.

Our main office is in Yukon, Oklahoma, and Coppell work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore reached roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa. That shows the range we can handle; a Coppell route beneath Macarthur Boulevard is scoped to its own length, ground and utility crossings. Our family business started in 1965, and we have done directional boring since 1982 for Coppell planning.

Directional drill rig and crew working on a street beside a brick commercial building
Our drill and crew set up on a street beside a brick commercial building. Photos on this page are from our jobs in Oklahoma and Texas.

What is Coppell Frio soil like to bore through?

The USDA soil survey maps Frio soil across 15 percent of Coppell, and Frio silty clay, 0 to 1 percent slopes, occasionally flooded, across 12 percent. At about 40 inches below the surface, clay is mapped across 57 percent of the area; the average clay content there is 44 percent. Surface texture is clay across 34 percent. We treat Coppell’s mapped soil patterns as planning context, not as test borings for a bore. The heavy clay mapped around Denton Creek can cling to the reamer and grip pipe, so the bore plan must account for fluid returns and staged reaming.

USDA soil survey, inside the Coppell city limitsWhat is mapped
Soil series mappedFrio 15 percent, Wilson 11 percent, Trinity 9 percent, Burleson 9 percent and Houston Black 9 percent
Texture at the surfaceclay 34 percent, fine sandy loam 23 percent and silty clay 18 percent
Texture about 40 inches downclay 57 percent, silty clay 14 percent and sandy clay loam 10 percent
Engineering class about 40 inches downfat clay (CH) 67 percent, lean clay (CL) 17 percent and clayey sand (SC) 7 percent
Average clay content about 40 inches down44 percent
Bedrock mapped within 60 inches7 percent of the area (0 percent hard rock, 7 percent weathered rock)
Seasonal water table within 60 inches15 percent of the area
Flood prone soils30 percent of the area
High corrosion risk for uncoated steel82 percent of the area

The soil survey maps bedrock within 60 inches in 7 percent of Coppell, described as weathered bedrock; hard bedrock is not mapped in that interval. The typical mapped depth is 50 inches, so site conditions still need checking. Seasonal water table is mapped within 60 inches across 15 percent, and flood prone soils across 30 percent, making pits and creek depth part of planning near Denton Creek. Across Coppell, high steel corrosion risk is mapped across 82 percent, a condition we factor into bore planning. The Eagle Ford Formation, of Turonian age, is the local geologic unit; its shale, siltstone and limestone descriptions warrant attention if drilling meets rock.

How do we bore Coppell clay without opening the street?

Frio silty clay and the wider clay pattern call for controlled fluid and a deliberate reaming sequence. Along Belt Line Road, we also plan the entry and exit pits so the pavement stays intact.

  1. Fluid and reaming: Coppell’s heavy clay can build up on the reamer, so we use staged passes and manage returns before pulling pipe through the open hole.
  2. Utility exposure: Near Macarthur Boulevard, we hydrovac each marked line on the bore path because surface paint gives position, not depth.
  3. Tracking: At Belt Line Road, a walkover locator follows the drill head; we record depth and pitch as the bore advances through the planned route.
  4. Wet ground: Where Denton Creek or flood prone soils affect a route, we plan for depth beneath the channel and keep entry pits manageable if water collects.
Walkover locator held over a flowing creek while tracking the drill head on a 385 foot rock bore in Guthrie, Oklahoma
Tracking the drill head with a walkover locator over a flowing creek on a 385 foot bore in Guthrie, Oklahoma.

Which roads, tracks or creeks shape bores in Coppell near Belt Line Road?

Interstate 635 has 5.8 mapped roadway miles inside Coppell, and Texas State Highway 121 has 7.1. Texas State Highway 190 is 0.2 miles outside the limits. On city streets, Belt Line Road runs 8.7 miles, Macarthur Boulevard 7.06 miles and Sandy Lake Road 6.99 miles. Those routes put pavement and existing utilities into the bore layout. For a crossing, we plan pits in dirt on each side rather than cutting the roadway, then locate and expose marked utilities along the path.

CrossingTypeMapped extentWho has a say
Interstate 635Interstate5.8 roadway miles insideState highway office
Texas State Highway 121State highway7.1 roadway miles insideState highway office
Texas State Highway 121 BusinessState highway1.1 roadway miles insideState highway office
Texas State Highway 190Highway nearby0.2 miles outsideState highway office
Texas State Highway 26Highway nearby0.3 miles outsideState highway office
Spur 97Highway nearby0.6 miles outsideState highway office
US 77Highway nearby0.8 miles outsideState highway office
Interstate 35Highway nearby0.8 miles outsideState highway office
Fort Worth and Western RailroadRailroad6.4 track miles insideThe railroad
Denton CreekStream5.92 channel miles insideChecked for Corps of Engineers jurisdiction
Grapevine CreekStream4.88 channel miles insideChecked for Corps of Engineers jurisdiction
Cottonwood BranchStream4.52 channel miles insideChecked for Corps of Engineers jurisdiction
Elm Fork Trinity RiverStream1.29 channel miles insideChecked for Corps of Engineers jurisdiction
Hutton Branch CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

The Fort Worth and Western Railroad has 6.4 track miles in Coppell, and public mapping records 11 street and rail crossings in the city. A bore beneath its track needs an agreement with the railroad that sets the crossing conditions. Denton Creek runs 5.92 channel miles inside the limits; Grapevine Creek and Cottonwood Branch are also mapped streams. Public mapping records 16 street crossings of named streams. A creek route needs depth planning, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction. Northlake is a nearby lake outside the city limits.

Who approves Coppell work near Interstate 635?

For work in the right of way of Interstate 635 or Texas State Highway 121, the utility that owns the line, not the drilling contractor, applies through TxDOT’s online RULIS system. We prepare the bore plan and profile for the utility owner’s application, then work under its permit. The TxDOT Dallas District reviews Coppell highway work. TxDOT rules call for at least 60 inches of cover for electric and communication lines crossing a highway, and 60 inches for water crossings; the district may set another depth in the permit. Railroad work under the Fort Worth and Western Railroad needs that owner’s agreement. Coppell city streets belong to the city.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns lines around the City of Coppell water system?

The City of Coppell public water system uses purchased surface water and reports 16,663 service connections serving 43,193 people. Dallas County electric service reports name Oncor Electric Delivery Company, Texas-New Mexico Power, City of Garland, Farmers Electric Cooperative, HILCO Electric Cooperative and Trinity Valley Electric Cooperative. The county list does not identify the provider at every address. Before a conduit bore near Belt Line Road, we confirm which utility owns the line in the proposed path.

Line ownerWhat it isSourceSize
City of CoppellPublic water systemSurface water bought from another system16,663 connections, 43,193 people served
Oncor Electric Delivery Company, Texas-New Mexico Power, City of Garland, Farmers Electric Cooperative, HILCO Electric Cooperative and Trinity Valley Electric CooperativeElectric utilities reporting service in Dallas County and Denton CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Coppell’s median housing year is 1993 in the American Community Survey 2019 to 2023 five year estimates, context we consider for underground planning. The estimates show 1 percent of housing units built before 1960, 75 percent from 1960 to 1999 and 24 percent in 2000 or later. Along Macarthur Boulevard, a job may involve an existing line being replaced or a service for newer construction; the route and plans determine the scope. Paint shows line position, not depth, so we hydrovac pothole marked utilities before drilling near them.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

Where does Coppell sit near Carrollton?

Coppell covers 14.42 square miles at an elevation of 513 feet. It lies mainly in Dallas County, with a small portion in Denton County, and includes ZIP codes 75019 and 75063. Carrollton is 5.6 miles east and is the nearest larger city; Grapevine is 5.3 miles west, and Lewisville is 6.1 miles north. Dallas, the Dallas County seat, is 17.5 miles southeast. The Yukon, Oklahoma main office is 200 road miles away, about a four hour drive, which is part of planning mobilization for a Coppell job.

Places near Coppell

What bore work fits Coppell’s Macarthur Boulevard routes?

  • Highway crossing: An Interstate 635 bore needs a planned route beneath the roadway, with the utility owner’s TxDOT permit covering the right of way work.
  • Water service: A service connection near the City of Coppell system can be routed beneath a street without cutting its pavement.
  • Fiber route: A fiber conduit along Freeport Parkway needs its path checked against marked utilities before the drill approaches them.
  • Creek crossing: A route beneath Denton Creek needs depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
  • Rail crossing: A bore under the Fort Worth and Western Railroad track needs the railroad owner’s agreement for crossing conditions.
  • Street conduit: Along Macarthur Boulevard, hydrovac potholes can expose marked utilities before a new electric conduit crosses the route.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Coppell bore near Fort Worth and Western Railroad?

For a Coppell quote, send the address or map pin, what is going in the ground, the pipe or conduit size and footage; a sketch or plans help us see how the route meets Belt Line Road or another crossing. Those details let us judge the path, access and utility exposure before scoping the work.

The ground is the first cost driver: Coppell’s clay can hold the hole and grip pipe, and rock or changing conditions can slow the bore. The number of marked utilities to expose also matters, especially on developed routes such as Belt Line Road. Pavement, pits, excavator time, backfill and crossings add work. A Denton Creek route needs its own crossing plan, while work beneath the Fort Worth and Western Railroad brings agreement conditions into the scope. For Coppell mobilization, we account for the 200 road miles from Yukon when planning schedules.

Questions people ask about boring in Coppell

Does Trinity take directional boring jobs in Coppell, Dallas County?

Yes. We take directional boring work in Coppell, with the Yukon office coordinating the job and our own crews or vetted partner contractor yards staffing the site. Dallas County electric reports include several providers, so we confirm the actual line owner for the address before planning a conduit route. Trinity stays involved through the bore log.

Is there rock in Coppell, and how much bedrock is mapped in the top five feet?

The USDA soil survey maps weathered bedrock within 60 inches in 7 percent of Coppell; hard bedrock is not mapped in that interval. That does not establish what a specific route will encounter. The Eagle Ford Formation is mapped here and includes shale, siltstone and limestone, so site conditions and drilling progress matter near a proposed bore.

Who approves a Coppell bore under Interstate 635?

For a bore in the Interstate 635 right of way, the utility that owns the line submits the utility permit application through TxDOT’s RULIS system. For a Coppell crossing, we account for review by the TxDOT Dallas District in our work planning. We prepare the bore plan and profile for the owner’s application and work under the permit issued to that utility owner.

What does a Coppell bore under the Fort Worth and Western Railroad require?

A bore beneath the Fort Worth and Western Railroad requires an agreement with the railroad that owns the track. For Coppell, we plan around the agreement reviewed by the TxDOT Dallas District, including casing, depth and flagging conditions. The railroad has 6.4 track miles in Coppell, so the crossing location and the owner’s requirements need to be part of the route plan.

Can a line be bored under Denton Creek in Coppell?

A bore under Denton Creek can be planned, with the route set to pass beneath the channel and the crossing checked for U.S. Army Corps of Engineers jurisdiction. Denton Creek runs 5.92 channel miles inside Coppell, and flood prone soils are mapped across 30 percent of the city, making depth and pit placement important.

Who owns Coppell’s public water system, and does it use purchased surface water that we account for in crossing plans?

The City of Coppell owns its public water system, and we plan around its purchased surface water for crossings. It reports 16,663 service connections and 43,193 people served. For a water service bore near Belt Line Road, we still need the route and plans to locate existing lines and determine where potholes are needed.

How much 811 notice does a Coppell bore near Belt Line Road need?

Paint near Belt Line Road shows a line’s position, not its depth. Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.

Does the distance from Carrollton change the cost of a Coppell bore from Yukon?

The Yukon main office is 200 road miles from Coppell, about a four hour drive. Carrollton is 5.6 miles east of Coppell, but the job’s mobilization is based on its actual route and scope. Length, ground, utility exposure and crossings such as Interstate 635 also shape the work.

What affects the cost of directional boring in Coppell near Interstate 635?

The route and ground set the scope, not a single standard rate. Coppell clay, bore length, pipe size and the number of utilities to expose all matter. Pavement and pits add work, while an Interstate 635 right of way crossing or a Denton Creek route brings added planning. Distance from the Yukon office also affects mobilization.

Where the Coppell facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Coppell

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Coppell, Texas

Type the address of your job in Coppell. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.