Anderson Texas Directional Boring: Frelsburg Clay, FM 149 and Dickson Creek
Quick Answer: Anderson Water System is privately owned, and Entergy Texas, Mid-South Electric Cooperative Association and San Bernard Electric Cooperative report service in Grimes County; confirm the line owner before a bore. Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), for routes under FM 149. Anderson is 399 road miles from our Yukon, Oklahoma main office, with Navasota 9.2 miles southwest. Frelsburg clay is common here, so sticky cuttings and pressure beneath pavement need attention.
Anderson bores at a glance
- County seat of Grimes County, Texas. Population 212 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 399 miles, about 7.9 hours of driving.
- Ground: Frelsburg soil is mapped on 35 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 13 percent of the area.
- Highways inside the boundary: FM 149, Texas State Highway 90, FM 2819, Loop 429 and FM 1774. State permit office: TxDOT Bryan District.
- Railroad track inside the boundary: none mapped.
- Public water: Anderson Water System, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring in Anderson, Grimes County?
We take directional boring work in Anderson, Grimes County, where the Census Bureau Vintage 2024 estimate puts the population at 212. A route along Johnson Avenue or Main Street may call for a water, sewer, gas, electric conduit or fiber bore, depending on the line owner and project. We confirm existing utilities before setting the path, so the new line can pass beneath streets without an open cut.
Our main office is in Yukon, Oklahoma, and Anderson work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore reached roughly 4,100 feet with 48 inch pipe beneath the Arkansas River in Tulsa. A bore along Johnson Avenue is a different scale of job. Our family business started in 1965, and we have done directional boring since 1982, with work sized to the route and ground in Anderson.

What ground should we expect in Anderson near Frelsburg soil?
The USDA soil survey maps Frelsburg soil across 35 percent of Anderson, with Latium at 20 percent and Chazos at 14 percent. At the surface, clay makes up 56 percent of mapped texture; at about 40 inches, clay is the leading texture at 60 percent. The average clay content at that depth is 45 percent, and 67 percent of the mapped area has heavy clay. Those mapped patterns are not test borings. On a Johnson Avenue route, the actual profile still needs checking before choosing the drilling fluid and reaming plan.
| USDA soil survey, inside the Anderson city limits | What is mapped |
|---|---|
| Soil series mapped | Frelsburg 35 percent, Latium 20 percent, Chazos 14 percent, Carbengle 13 percent and Brenham 7 percent |
| Texture at the surface | clay 56 percent, clay loam 20 percent and loamy fine sand 18 percent |
| Texture about 40 inches down | clay 60 percent, sandy clay loam 14 percent and bedrock 13 percent |
| Engineering class about 40 inches down | fat clay (CH) 56 percent, lean clay (CL) 19 percent and clayey sand (SC) 10 percent |
| Average clay content about 40 inches down | 45 percent |
| Bedrock mapped within 60 inches | 13 percent of the area (0 percent hard rock, 13 percent weathered rock) |
| Seasonal water table within 60 inches | 2 percent of the area |
| Flood prone soils | 1 percent of the area |
| High corrosion risk for uncoated steel | 67 percent of the area |
The USDA soil survey maps bedrock within 60 inches across 13 percent of Anderson, and that mapped bedrock is weathered rather than hard. Seasonal water tables occur within 60 inches across 2 percent, while flood prone soils cover 1 percent. High steel corrosion risk is mapped across 67 percent, so the line owner should consider casing and tracer wire materials; HDPE avoids that soil concern. The Miocene Fleming Formation is described as clay and sandstone. Clay can grip the pipe, while weathered sandstone may slow the bore.
How do we drill Anderson clay without losing control?
Frelsburg soil and the mapped clay in Anderson call for steady fluid control, staged reaming and a clear route. On FM 149 or a local street, the plan also has to protect the surface and marked utilities.
- Frelsburg clay can cling to the reamer, so we use thinner fluid with polymer and open the hole in stages before pulling pipe on the same day.
- With heavy clay mapped across 67 percent of Anderson at about 40 inches, we watch fluid returns closely to avoid lifting pavement near FM 149.
- Before drilling near a marked line along Johnson Avenue, we hydrovac pothole it; surface paint gives position, not depth.
- We track the drill head from the surface and log depth and pitch, including on routes where weathered bedrock is mapped within 60 inches.

Where might an Anderson bore pass under Dickson Creek?
FM 149, Texas State Highway 90, FM 2819, Loop 429 and FM 1774 run within Anderson. A state highway route needs a bore plan that accounts for its right of way and the pavement above it. Johnson Avenue is the longest named street at 1.18 miles in the city, followed by Buffington Avenue at 0.56 miles and Main Street at 0.55 miles. Hill Street adds another local route. A bore can pass beneath pavement rather than cut across it.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 149 | State highway | 0.9 roadway miles inside | State highway office |
| Texas State Highway 90 | State highway | 0.9 roadway miles inside | State highway office |
| FM 2819 | State highway | 0.4 roadway miles inside | State highway office |
| Loop 429 | State highway | 0.2 roadway miles inside | State highway office |
| FM 1774 | State highway | 0.1 roadway miles inside | State highway office |
| Dickson Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Nebletts Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| Holland Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Anderson or within one mile outside its limits, so no local track crossing is identified. Dickson Creek runs along or touches the city boundary; Nebletts Creek and Holland Creek are each 0.4 miles from the limits. No named stream crossing by a city street is mapped inside Anderson, though 0.69 miles of unnamed drainage is mapped within the city. With Dickson Creek nearby, we plan Anderson boring carefully; no lakes or ponds are mapped within one mile. A planned creek crossing still needs a jurisdiction check.
Who approves work near FM 149 in Anderson?
FM 149 is a state highway, so work in its right of way needs a TxDOT utility permit reviewed by the TxDOT Bryan District. The utility that owns the line files through TxDOT’s RULIS system; we prepare the bore plan and profile for that application and work under the owner’s permit. TxDOT rules call for boring or tunneling beneath existing highway pavement, with casing at crossings. Required cover depends on the line type, and the district can set a different depth. Anderson’s city streets belong to the city itself. Dickson Creek is checked for U.S. Army Corps of Engineers jurisdiction during crossing planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns lines near the Anderson Water System?
Anderson Water System is privately owned, uses groundwater wells, and reports 280 service connections serving 226 people. That gives a water project a named system to check, but the owner and route for a particular address still need confirmation. Entergy Texas, Mid-South Electric Cooperative Association and San Bernard Electric Cooperative report electric service in Grimes County. We confirm the electric line owner before planning a conduit bore; those county records do not identify the provider at every Anderson address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Anderson Water System | Public water system | Groundwater wells | 280 connections, 226 people served |
| Entergy Texas, Mid-South Electric Cooperative Association and San Bernard Electric Cooperative | Electric utilities reporting service in Grimes County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Anderson’s median housing year at 1968; 38 percent of housing was built before 1960, and 32 percent in 2000 or later. Older housing can mean a replacement line, while newer construction may need a service extension. If a route under Buffington Avenue meets marked utilities, we hydrovac pothole each marked line before the drill approaches it. Paint shows position, not depth.

Where is Anderson in relation to Navasota and our Yukon yard?
Anderson is the Grimes County seat, with an elevation of 323 feet and 0.51 square miles of land. On Main Street, ZIP code 77830 serves Anderson, helping us organize underground work for the correct service area. Richards is 9.0 miles east, Navasota is 9.2 miles southwest, Shiro is 10.1 miles northeast, and Plantersville is 12.9 miles southeast. Navasota is the nearest larger city. Anderson is 399 road miles and a 7.9 hour drive from our Yukon, Oklahoma main office, so we plan mobilization for FM 149 work accordingly. That distance is part of planning mobilization for work near FM 149 or Dickson Creek.
Places near Anderson
- Directional boring in Richards: 9 miles east
- Directional boring in Navasota: 9.2 miles southwest
- Directional boring in Shiro: 10.1 miles northeast
- Directional boring in Plantersville: 12.9 miles southeast
- Directional boring in Pinebrook: 13.8 miles southeast
What could we bore along Johnson Avenue in Anderson?
- Highway crossing: A route beneath FM 149 needs a bore plan for the state right of way and existing pavement.
- Water service: A service near Anderson Water System needs the line owner and connection route confirmed before the bore path is set.
- Fiber route: A conduit bore along Johnson Avenue can pass beneath pavement, with marked utilities exposed before drilling near them.
- Creek crossing: A proposed route near Dickson Creek needs a depth plan beneath the channel and a jurisdiction check.
- Street replacement: A bore near Buffington Avenue can route a replacement line beneath the street while avoiding an open cut.
- Electric conduit: A route on Hill Street needs the electric line owner confirmed because county records do not identify the provider at each address.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near Hill Street in Anderson?
A map pin matters near Hill Street because the exact route can change what a bore crosses. Send the Anderson address or pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans help us see whether the route approaches FM 149, a marked utility or drainage.
The mapped clay matters first: Frelsburg soil and heavy clay can affect drilling fluid, reaming and pipe pullback. Next are the number of marked utilities to expose, pavement along a Hill Street route, and any drainage or Dickson Creek crossing. Pipe size, footage, pits, excavator time and sand backfill also affect the scope. Anderson’s 399 road miles from Yukon can add mobilization needs, while high profile or emergency work can change the plan.
Questions people ask about boring in Anderson
Does Trinity take directional boring jobs in Anderson, Grimes County, and who staffs them?
Yes. We take work in Anderson and handle the job with our own crews or crews from vetted drilling partners working from satellite yards. For a planned crossing near Nebletts Creek, we manage your project from the first call through the bore log, regardless of the crew assigned. For a route near FM 149, we plan around the street, ground and marked utilities.
What do Anderson’s housing ages along Buffington Avenue mean for a replacement bore?
The American Community Survey 2019 to 2023 five year estimates put the median housing year at 1968, with 38 percent built before 1960. That makes replacement work a reasonable project type to assess, not an assumption about any particular buried line. For a bore near Buffington Avenue, we expose marked utilities before drilling near them.
Does Frelsburg soil in Anderson corrode steel, and what pipe should we use?
The USDA soil survey maps high steel corrosion risk across 67 percent of Anderson. The line owner should weigh that when selecting steel casing or tracer wire materials; the survey does not decide the specification. Frelsburg soil is among the mapped local soils, and HDPE does not have the same soil corrosion concern.
What ground does an Anderson bore meet in Frelsburg soil?
The USDA soil survey maps Frelsburg soil across 35 percent of Anderson. Clay is the main mapped texture at about 40 inches, making up 60 percent at that depth, and heavy clay is mapped across 67 percent. Clay can ball on a reamer and grip pipe, so we plan staged reaming and fluid control rather than treating the map as a test boring.
Will an Anderson bore hit rock, and how much bedrock is mapped?
Bedrock is mapped within five feet across 13 percent of Anderson, and the mapped material is weathered rather than hard. That does not establish what lies beneath a specific route. Near FM 149, we use site information to plan for the possibility of slower drilling where the bore meets weathered bedrock.
Who approves an Anderson bore under FM 149, and which TxDOT office reviews it?
TxDOT’s Bryan District reviews a utility permit for work in the FM 149 right of way. The utility owner submits the application in TxDOT’s RULIS system; we prepare the bore plan and profile for the owner and work under its permit. Existing highway pavement is bored or tunneled beneath, rather than crossed by open trench.
How far is Anderson from the Yukon office, and does Navasota change mobilization?
Anderson is 399 road miles and a 7.9 hour drive from our Yukon, Oklahoma main office, so we plan mobilization for FM 149 work accordingly. Navasota, the nearest larger city, is 9.2 miles southwest, but the job’s location and access still matter for mobilization. A map pin near Navasota or FM 149 helps us assess the actual route.
How much Texas811 notice does an Anderson bore near Johnson Avenue need?
For a bore near Johnson Avenue, submit the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. For Anderson work under the TxDOT Bryan District, if the start slips more than 14 days past the original notice, we submit a new request. Before boring resumes along FM 1774, we have worn or moved marks refreshed through Texas811.
What affects the price of directional boring near FM 149 in Anderson?
The route and scope determine the price, with Anderson’s clay affecting drilling and reaming first. Other factors include pipe or conduit size, footage, marked utilities to expose, pavement, pits, excavator time, backfill and any creek or drainage crossing. A bore near FM 149 and mobilization from Yukon can add planning demands. High profile or emergency work can also affect the scope.
Where the Anderson facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Anderson
- U.S. Census Bureau, TIGER/Line 2024: Anderson boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Anderson
- U.S. Census Bureau, American Community Survey 2019 to 2023: Anderson housing units and year built
- Macrostrat geologic map compilation: map units under Anderson
- U.S. EPA Safe Drinking Water Information System: public water systems serving Anderson
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Grimes County
- U.S. Geological Survey, Elevation Point Query Service: Anderson elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Anderson
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Anderson
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Anderson, Texas
Type the address of your job in Anderson. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Anderson
Same county: Bedias · Iola · Todd Mission. All counties: Texas county list.
