trinityboringsolutions.com

Pinebrook Texas Directional Boring: Depcor Soil, Union Pacific Track and Kickapoo Creek

Quick Answer: Along Pinebrook Drive, Pin Oak Drive and Live Oak Drive, we install lines by directional boring, also called horizontal directional drilling (HDD), without opening the streets. Those roads are part of 20.78 public road centerline miles, and Union Pacific track runs through the community. Our Yukon main office is 423 road miles away, with 2.68 track miles of Union Pacific inside Pinebrook. Depcor soil shifts from loamy fine sand to clay below, so the bore plan has to account for ground that can grip the pipe.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Pinebrook bores at a glance

  • Unincorporated community in Grimes County, Texas. Population 485 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 423 miles, about 8.2 hours of driving.
  • Ground: Depcor soil is mapped on 49 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • No state or US highway is mapped inside the boundary. Closest: Texas State Highway 105.
  • Railroad track inside the boundary: Union Pacific, with 2 mapped street and rail crossings.
  • Named streams inside the boundary: Kickapoo Creek and Mill Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring along Pinebrook Drive in Pinebrook?

Pinebrook is an unincorporated census designated place in Grimes County, so it has no city government; the Census Bureau counted 485 residents in 2020, the latest count provided for this place. We install water, sewer, gas, electric conduit and fiber beneath routes such as Pinebrook Drive and Live Oak Drive, where a bore can avoid opening the road surface.

Our main office is in Yukon, Oklahoma, and Pinebrook work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Trinity is a family business that began in 1965. Since 1982, four decades of directional boring have shaped how we plan for Pinebrook’s loamy fine sand over clay rather than treat each route as uniform.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Depcor soil mean for a Pinebrook bore?

The USDA soil survey maps Depcor soil across 49 percent of Pinebrook and Fetzer across another 21 percent; Annona accounts for 18 percent. Loamy fine sand is the mapped surface texture across 76 percent, while fine sandy loam covers 18 percent. At about 40 inches, the largest mapped texture share is sandy clay loam at 49 percent, with clay loam at 21 percent and clay at 18 percent. These are mapped patterns, not test borings, so the route still needs job specific planning.

USDA soil survey, inside the Pinebrook mapped community boundaryWhat is mapped
Soil series mappedDepcor 49 percent, Fetzer 21 percent, Annona 18 percent, Huntsburg 5 percent and Nahatche 3 percent
Texture at the surfaceloamy fine sand 76 percent, fine sandy loam 18 percent and clay loam 3 percent
Texture about 40 inches downsandy clay loam 49 percent, clay loam 21 percent and clay 18 percent
Engineering class about 40 inches downlean clay (CL) 53 percent, fat clay (CH) 44 percent and silty sand (SM) 3 percent
Average clay content about 40 inches down35 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches98 percent of the area
Flood prone soils3 percent of the area
High corrosion risk for uncoated steel98 percent of the area

Bedrock is not mapped within 60 inches across Pinebrook, but that does not rule out rock below the mapped depth. Seasonal water tables are mapped within 60 inches across 98 percent, so pits may need pumping. Flood prone soils cover 3 percent, including areas to consider near Kickapoo Creek. Across Pinebrook, we use the mapped 98 percent steel corrosion risk to consider casing and tracer wire materials. The geologic map shows the Cenozoic Willis Formation and Gelasian alluvial pebble gravel and sand, a mix that calls for attention to changing ground.

What does it take to bore Pinebrook sandy clay loam?

Pinebrook’s sandy clay loam at about 40 inches sits among loamy fine sand and clay soils. We adjust the fluid and reaming plan to the mapped ground, then track the bore as it advances.

  1. Because Depcor soil includes loamy fine sand and clay below, we stage the reaming and have the pipe ready before opening the final bore section.
  2. Where Pinebrook’s mapped clay is sticky, we control fluid returns and use a thinner fluid mix so pressure does not lift pavement or grip the pipe.
  3. With seasonal water tables mapped within 60 inches across 98 percent of Pinebrook, we keep pits small and pump them if water collects.
  4. Before drilling near marked utilities on a Pinebrook route, we expose them with hydrovac potholing, then track the drill head and log depth and pitch.
Walkover locator at the edge of the wetland on a directional bore at the Cimarron site in Logan County, Oklahoma
Walkover locator at the edge of a wetland on a directional bore in Logan County, Oklahoma.

What does a bore have to cross in Pinebrook near Texas State Highway 105?

No highway runs inside Pinebrook’s mapped community boundary, but Texas State Highway 105 is 0.1 miles outside it. The TxDOT Bryan District may be involved if a route reaches that state highway right of way. Pinebrook has 20.78 public road centerline miles, led by Pinebrook Drive at 1.66 miles, Pin Oak Drive at 1.01 miles and Live Oak Drive at 0.8 miles. A bore beneath one of those streets can keep the road surface intact, while each route still needs checks for buried lines and access.

CrossingTypeMapped extentWho has a say
Texas State Highway 105Highway nearby0.1 miles outsideState highway office
Union PacificRailroad2.68 track miles insideThe railroad
BNSF RailwayRailroad nearby0 miles outsideThe railroad
Kickapoo CreekStream1.24 channel miles insideChecked for Corps of Engineers jurisdiction
Mill CreekStream0.3 channel miles insideChecked for Corps of Engineers jurisdiction
Hurricane CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Birch CreekStream nearby1 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific owns 2.68 track miles inside Pinebrook on its Navasota Subdivision, and public mapping records two street and rail crossings. Any bore under Union Pacific track needs an agreement with the railroad before crossing conditions are set. Kickapoo Creek runs 1.24 channel miles inside the community, and Mill Creek runs 0.3 miles; three mapped street crossings cross named streams. A creek route needs review for Corps jurisdiction during planning.

Who has to sign off on Pinebrook work in Grimes County?

Pinebrook has no city government, so streets and permits are handled by Grimes County or the state, depending on the route. Texas State Highway 105 sits 0.1 miles outside the mapped community boundary; work in its right of way needs a TxDOT utility permit reviewed by the Bryan District. The utility owner, not our drilling crew, files through TxDOT’s RULIS system, and we prepare the bore plan and profile for that filing. A crossing of Union Pacific track also needs the railroad’s agreement. Kickapoo Creek crossings are checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried in Grimes County near Pinebrook?

The water provider for a specific Pinebrook address has to be confirmed with the county or local water district before a bore is planned; EPA drinking water records do not match a provider to this place. Entergy Texas, Mid-South Electric Cooperative Association and San Bernard Electric Cooperative report electric service in Grimes County, but that does not identify the owner at every address. We confirm the line owner before planning a conduit bore along Pinebrook Drive or another route.

Line ownerWhat it isSourceSize
Entergy Texas, Mid-South Electric Cooperative Association and San Bernard Electric CooperativeElectric utilities reporting service in Grimes CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Pinebrook’s median housing year at 2016; 82 percent of units were built in 2000 or later, and 18 percent from 1960 to 1999. That mix can mean new services as well as replacement lines beneath Live Oak Drive. Before drilling near marked utilities on Pinebrook bore paths, we hydrovac pothole each one. For example, a proposed line beneath Pinebrook Drive needs marked lines exposed first because paint shows position, not depth.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

What is near Pinebrook, including Magnolia?

Pinebrook is in southeastern Grimes County at an elevation of 334 feet and covers 2.75 square miles. The ZIP code is 77363. Plantersville is 1.7 miles northeast, Todd Mission is 4.5 miles southeast and Magnolia is 10.5 miles southeast; Anderson, the county seat, is 13.8 miles northwest. Magnolia is the nearest larger city. From our Yukon, Oklahoma main office, the route is 423 road miles and a drive of 8.2 hours, so distance is part of planning a Pinebrook mobilization.

Places near Pinebrook

What would we bore near Live Oak Drive in Pinebrook?

  • Highway crossing: A route toward Texas State Highway 105 may need a bore beneath the highway right of way rather than an open cut.
  • Rail crossing: A line beneath the 2.68 miles of Union Pacific track in Pinebrook needs a railroad agreement before its crossing plan is set.
  • Creek crossing: A bore under Kickapoo Creek can leave its 1.24 channel miles uncut, with jurisdiction checked during planning.
  • Street utility: A water or sewer line beneath Pinebrook Drive can avoid cutting the street while marked utilities are exposed along the route.
  • Fiber route: A fiber conduit along Live Oak Drive can be installed by bore, with the route checked for existing buried lines.
  • Drainage crossing: A route near Pinebrook’s 5.45 miles of unnamed drainage needs a path planned around the mapped water and soil conditions.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for Pinebrook work near Union Pacific?

For a Pinebrook quote, start with the address or map pin, such as a route on Live Oak Drive. For Pinebrook work, we ask what will go in the ground, the pipe or conduit size, and the footage. A sketch or plans showing a possible crossing of Kickapoo Creek or Union Pacific track help us understand the route before we plan the bore.

The 423 road miles from Yukon affect mobilization for Pinebrook, while the Depcor soil mix affects drilling and reaming. We also look at line size and length, utilities to expose, pavement, creek or drainage crossings, pits, excavator time and sand backfill. A route near Texas State Highway 105 or Union Pacific track brings crossing conditions into the scope. High profile or emergency work can change the plan, too.

Questions people ask about boring in Pinebrook

Does Trinity Boring Solutions take directional boring work in Pinebrook and Grimes County?

Yes. We take directional boring work in Pinebrook, and the crews may come from our own team or a satellite yard run by a partner contractor we have vetted. You work with Trinity from the first call through the bore log, whether the route is near Pinebrook Drive or elsewhere in Grimes County.

Will a Pinebrook bore hit rock under Depcor soil?

Not necessarily. Bedrock is not mapped within 60 inches in Pinebrook, but that does not rule out rock deeper down. The geologic map shows the Willis Formation and alluvial pebble gravel and sand, so the actual route and depth still matter when planning a bore.

Who approves a Pinebrook bore under Texas State Highway 105?

TxDOT reviews utility work in the Texas State Highway 105 right of way through its Bryan District. The utility owner files the application in RULIS, not the contractor; we provide the bore plan and profile and work under the permit issued to that owner.

For a Pinebrook bore under Union Pacific track, what crossing requirements should we plan for?

A crossing under Pinebrook’s Union Pacific track needs an agreement from the railroad that owns it. For Pinebrook crossings, we follow the agreement’s conditions for casing, depth, and flagging. Union Pacific has 2.68 track miles inside Pinebrook on its Navasota Subdivision.

Can you bore a line under Kickapoo Creek in Pinebrook?

A bore under Kickapoo Creek can be planned without cutting the channel, but the route and ground need review first. The creek runs 1.24 channel miles inside Pinebrook, and its crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Who owns the electric lines in Pinebrook and Grimes County?

Entergy Texas, Mid-South Electric Cooperative Association and San Bernard Electric Cooperative report electric service in Grimes County. That does not establish which company owns a line at a particular Pinebrook address, so we confirm the owner before planning conduit and its specifications.

Can I reach Trinity after hours for an urgent bore near Live Oak Drive in Pinebrook?

Yes. A person answers Trinity’s phone 24 hours a day at (405) 409-7423 for urgent work near Live Oak Drive or elsewhere in Pinebrook. The route, ground and crossing conditions still shape what response the job needs.

How much notice does Texas811 need for a bore near Pinebrook Drive in Pinebrook?

Paint near Pinebrook Drive shows a marked line’s position, not its depth. Texas law requires the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If the start slips more than 14 days past the original notice, make a new request; refresh marks through Texas811 if they wear off or move.

What affects the cost of a Pinebrook bore near Texas State Highway 105?

The route and scope determine the price, not just the footage. For Pinebrook, factors include mobilization from Yukon, Depcor soil, pipe or conduit size, lines to expose, pavement, pits, and creek or drainage crossings. Work near Texas State Highway 105 can also involve right of way planning and permit conditions.

Where the Pinebrook facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Pinebrook

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Pinebrook, Texas

Type the address of your job in Pinebrook. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Pinebrook

Same county: Navasota · Bedias · Iola · Anderson · Richards · Shiro. All counties: Texas county list.