trinityboringsolutions.com

Bacliff Texas Directional Boring: Mocarey Loam, FM 646 And Salt Bayou

Quick Answer: Can we get your line beneath FM 646 without cutting the pavement? Yes, we do directional boring, also called horizontal directional drilling (HDD), in Bacliff for crossings like this. Bacliff is 491 road miles from our Yukon, Oklahoma main office, so the route and mobilization matter for a Bayshore Drive job. Mocarey soil and a seasonal water table across the mapped area can leave pits wet and clay sticky. We plan the bore around those ground conditions.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Bacliff bores at a glance

  • Unincorporated community in Galveston County, Texas. Population 9,677 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 491 miles, about 9.6 hours of driving.
  • Ground: Mocarey soil is mapped on 44 percent of the area, with loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 646 and Texas State Highway 146. State permit office: TxDOT Houston District.
  • Railroad track inside the boundary: none mapped.
  • Public water: Bacliff Municipal Utility District, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can do directional boring near Salt Bayou in Bacliff?

Can we get your line under a road or drainage crossing without cutting it? Yes, we take directional boring work in Bacliff, an unincorporated community in Galveston County. The Census Bureau counted 9,677 people here in the 2020 Census. We install water, sewer, gas, electric conduit and fiber lines, including routes serving homes along Grand Avenue where a bore can avoid opening the street.

Our main office is in Yukon, Oklahoma, and Bacliff work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For a short Grand Avenue service, we can bore 3/4 inch lines, with 48 inch casing available for larger work. Our family business began in 1965, and we have done directional boring since 1982, accounting for Avenue East when planning routes.

Aerial view of Trinity Boring Solutions crew and service van at a multifamily apartment underground utility jobsite in Oklahoma City
Our crew and service van at a multifamily underground utility job in Oklahoma City, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Mocarey soil make in Bacliff?

The USDA soil survey maps Mocarey as 44 percent of the soil series in Bacliff. Its map units include Mocarey Algoa loams complex and a rarely flooded Mocarey Leton complex. At about 40 inches below the surface, the survey maps loam across 44 percent of the area and clay across 32 percent; it maps no sandy area at that depth. Mocarey, Bernard, Morey, and Kemah soil patterns around Bacliff are mapped soils, not test borings, so we check conditions before choosing a bore path. Loam and clay can behave differently along a Bayshore Drive route, so the bore plan needs to account for the actual ground encountered.

USDA soil survey, inside the Bacliff mapped community boundaryWhat is mapped
Soil series mappedMocarey 44 percent, Bernard 32 percent, Morey 21 percent and Kemah 3 percent
Texture at the surfaceloam 44 percent, clay loam 32 percent and silt loam 24 percent
Texture about 40 inches downloam 44 percent, clay 32 percent and clay loam 21 percent
Engineering class about 40 inches downlean clay (CL) 68 percent and fat clay (CH) 32 percent
Average clay content about 40 inches down34 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches100 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel100 percent of the area

Bedrock is not mapped in the top five feet of Bacliff, and the map shows the Beaumont Formation, predominantly sand, from the Pleistocene. That unit includes fine sand and alluvium, so conditions can change along a bore. The USDA soil survey maps a seasonal water table within 60 inches across the area, so pits near Salt Bayou may need pumping. Near Salt Bayou, flood prone soils are not mapped, so we check crossing conditions before setting a bore depth. High steel corrosion risk is mapped across the area; the line owner should weigh casing and tracer wire materials.

How is a bore run through Bacliff loam?

Bacliff soil maps show loam, clay loam and silt loam, with a shallow seasonal water table. For a route near FM 646, we match fluid, reaming and pit work to what the ground does.

  1. For Mocarey clay, we use a controlled fluid mix and staged reaming so sticky soil does not build up on the tools or grip the pipe.
  2. With loam and silt loam mapped in Bacliff, we keep fluid pressure low near pavement on FM 646 to limit the chance of lifting the surface.
  3. The USDA survey maps a seasonal water table across Bacliff, so pits near Bayshore Drive may need pumping and a compact layout.
  4. Before drilling near Grand Avenue, we hydrovac each marked utility on the route; a walkover locator tracks the head and records depth and pitch.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

Where might a line have to go under FM 646 in Bacliff?

FM 646 runs 3.5 mapped roadway miles inside the Bacliff community boundary, and Texas State Highway 146 runs 1.5 miles. Texas State Highway 96 is 0.4 miles outside the boundary. A route on Bayshore Drive, the longest named street at 2.51 miles, may also need to pass beneath Avenue East or Grand Avenue. Boring beneath existing highway pavement avoids an open cut across the traveled surface. The bore layout depends on the road, the proposed line and the space available for pits.

CrossingTypeMapped extentWho has a say
FM 646State highway3.5 roadway miles insideState highway office
Texas State Highway 146State highway1.5 roadway miles insideState highway office
Texas State Highway 96Highway nearby0.4 miles outsideState highway office
Salt BayouStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Bacliff or within one mile outside it, so there are no mapped local track crossings to plan around. Salt Bayou is 0.7 miles outside the community boundary; no named stream runs inside it. The survey maps 0.95 miles of unnamed drainage, so a route near that drainage needs its own review. No mapped street crossings of named streams are shown, and no lakes or ponds are mapped within one mile.

Do I need a permit for a Bacliff bore in Galveston County?

Bacliff has no city government, so its streets and permits are handled by the county or the state, depending on the route. For work in the right of way of FM 646 or Texas State Highway 146, TxDOT Houston District reviews the utility permit. At a highway crossing, the cover depth is generally at least 60 inches for electric, communication and water lines; TxDOT rules set other cover depths for lines running along the right of way. The utility owner files in RULIS, and we prepare the bore plan and profile for its application. A Salt Bayou crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities are near Bacliff Municipal Utility District lines?

Bacliff Municipal Utility District owns the public water system, which uses purchased surface water and serves 8,900 people through 2,967 service connections. That is useful context for planning a water line near Grand Avenue, but the system and other buried lines still need to be located along the proposed bore path. CenterPoint Energy, Entergy Texas and Texas-New Mexico Power report electric service in Galveston County. We confirm the electric line owner for the address before planning a conduit bore.

Line ownerWhat it isSourceSize
Bacliff Municipal Utility DistrictPublic water systemSurface water bought from another system2,967 connections, 8,900 people served
CenterPoint Energy, Entergy Texas and Texas-New Mexico PowerElectric utilities reporting service in Galveston CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Bacliff’s median housing year at 1990; 9 percent of homes were built before 1960, and 36 percent in 2000 or later. A Bayshore Drive project could involve an older line being replaced or a new service, and the route must account for existing utilities either way. We hydrovac pothole marked lines before drilling near them: paint shows position, not depth.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

Do you cover Bacliff and nearby Kemah?

Bacliff is an unincorporated community in Galveston County, with 2.54 square miles of land and an elevation of 15 feet. Its ZIP code is 77518. Kemah is 2.3 miles northwest, and San Leon is 3.1 miles southeast. Dickinson, the nearest larger city, is 5.7 miles southwest; Galveston, the county seat, is 22.3 miles south. Our Yukon, Oklahoma main office is 491 road miles away, a 9.6 hour drive. That distance is part of planning a job along FM 646.

Places near Bacliff

What kinds of bores might come up near Grand Avenue in Bacliff?

  • Highway crossing: A bore beneath FM 646 can carry water or conduit without opening the highway pavement.
  • Water service: A route along Grand Avenue can connect a service while avoiding a long open cut through the street.
  • Fiber drop: Fiber conduit along Bayshore Drive can pass beneath pavement and driveways while the surface stays intact.
  • Drainage crossing: A bore near Bacliff’s 0.95 miles of unnamed drainage needs a route and depth planned for that channel.
  • Utility conduit: On Avenue East, potholing marked lines first helps establish their depth before a new conduit bore advances.
  • Water district work: A water line near Bacliff Municipal Utility District service connections needs its route checked against existing buried utilities.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near Bayshore Drive in Bacliff?

Start with the address or map pin, such as a spot on Bayshore Drive. Tell us what is going in the ground, such as a water line or fiber conduit. Give us the pipe or conduit size and the footage; a sketch or plans help show how the route relates to FM 646 or nearby utilities.

A direct service route on Grand Avenue with clear access is simpler to plan than a crossing beneath FM 646 or an unnamed drainage. The price reflects length, pipe or conduit size, soil, exposed utilities, pavement, pits and backfill. Mocarey clay and wet ground can affect reaming and pit work. The 491 road miles from Yukon also affect mobilization, while creek or drainage crossings and emergency timing add planning demands.

Questions people ask about boring in Bacliff

Does Trinity Boring Solutions take directional boring work in Bacliff and Galveston County?

Yes. We take directional boring projects in Bacliff and across Texas. Our own crews and partner drilling contractors Trinity has personally vetted staff the work, while you deal with Trinity from the first call through the bore log. That applies whether the route is along Grand Avenue or beneath FM 646.

Could a Bacliff bore through loam encounter rock?

The maps do not show bedrock in Bacliff’s top five feet, but that does not rule out deeper rock. The geologic map identifies the Beaumont Formation, a Pleistocene unit with sand and fine alluvium. A route near Bayshore Drive still needs to be planned for the ground found along its alignment.

Who approves a bore under FM 646 in Bacliff?

For work in FM 646 right of way, the utility owner applies for the TxDOT permit through the online RULIS system. TxDOT Houston District reviews it. We prepare the bore plan and profile for the owner’s application, and the cover depth and installation details follow the permit for that Bacliff crossing.

Can you bore a line under Salt Bayou near Bacliff?

A bore can be planned for a Salt Bayou crossing, which is mapped 0.7 miles outside Bacliff’s boundary. For crossings on FM 646, we check during planning whether the route falls under US Army Corps of Engineers jurisdiction. The route and ground conditions determine the bore layout, including its entry and exit pits.

Who runs Bacliff’s public water system in Galveston County, and where is water sourced?

Bacliff Municipal Utility District owns the public water system, and its source is purchased surface water. Bacliff’s system serves 8,900 people through 2,967 service connections, figures we account for when planning underground work in the community. A proposed water bore near Grand Avenue still needs its route checked against existing lines.

Which electric utilities report service in Galveston County near Bacliff?

CenterPoint Energy, Entergy Texas and Texas-New Mexico Power report electric service in Galveston County. Those reports do not identify the provider at every Bacliff address. We confirm the line owner before planning a conduit bore, including one on Bayshore Drive.

How far is Bacliff from Yukon, and does Dickinson make a difference to the job?

Bacliff is 491 road miles and a 9.6 hour drive from our Yukon, Oklahoma main office, so we plan travel accordingly. Dickinson is 5.7 miles southwest of Bacliff, but the Yukon distance matters for mobilization. A job near FM 646 is priced around its route, ground, crossings and access as well as travel.

How much notice does Texas811 need for a bore along Bayshore Drive in Bacliff?

Request a Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If a Bayshore Drive start slips more than 14 days past the original notice, make a new request. On Bayshore Drive, we refresh any worn or moved marks before continuing work, keeping the bore route tied to the marked alignment.

What affects the cost of a directional bore under FM 646 in Bacliff?

The route length, line size, Mocarey soil, utilities to expose, pavement, pits and backfill all affect the price. An FM 646 crossing may take more planning than a clear service route on Grand Avenue. Mobilization from the Yukon office is also a factor because Bacliff is 491 road miles away.

Where the Bacliff facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Bacliff

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Bacliff, Texas

Type the address of your job in Bacliff. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Bacliff

Same county: League City · Texas City · Galveston · Friendswood · La Marque · Santa Fe · Hitchcock · Bolivar Peninsula · Bayou Vista · Tiki Island · Jamaica Beach. All counties: Texas county list.