Santa Fe Texas Directional Boring: Mocarey Loam, FM 646 and BNSF Railway
Quick Answer: What does the top five feet near FM 646 look like, and what is below? Mocarey loam is mapped, with bedrock not mapped in that depth. Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), in Santa Fe near the BNSF Railway. Santa Fe is 491 road miles from our Yukon, Oklahoma main office, with the Galveston County Water Company Canal among the local crossings to plan around. The mapped loam and clay can hold a reamer, so we manage fluid and ream in stages around Mocarey soil.
Santa Fe bores at a glance
- Incorporated city in Galveston County, Texas. Population 13,131 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 491 miles, about 9.6 hours of driving.
- Ground: Mocarey soil is mapped on 82 percent of the area, with loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: FM 646, Texas State Highway 6 and FM 1764. State permit office: TxDOT Houston District.
- Railroad track inside the boundary: BNSF Railway, with 8 mapped street and rail crossings.
- Named streams inside the boundary: Galveston County Water Company Canal, Highland Bayou and Cloud Bayou.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near Avenue L in Santa Fe?
What does the top five feet near Avenue L look like, and what lies below it? The USDA soil survey maps Mocarey loam there, with bedrock not mapped in the top five feet. Santa Fe is in Galveston County and has 13,131 residents, according to the Census Bureau Vintage 2024 estimate. We install water, sewer, gas, electric conduit and fiber along streets such as Avenue L and 6th Street.
Our main office is in Yukon, Oklahoma, and Santa Fe work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have done directional boring since 1982; Santa Fe’s median housing year of 1991 gives context when planning underground routes. Four decades of boring guide how we plan for the clay and seasonal water mapped around Avenue L.

What kind of ground does Santa Fe have around Mocarey soil?
The USDA soil survey maps Mocarey across 82 percent of Santa Fe. Mocarey loam and Mocarey loam complexes are common mapped units, and loam makes up 83 percent of the surface texture. At about 40 inches below the surface, the mapped texture is loam across 78 percent of the area, while clay accounts for 13 percent. The survey maps no sandy area at that depth. These are mapped soil patterns, not test borings, so a route near FM 646 still needs site specific planning. Clay can cling to a reamer and grip pipe, so staged reaming and a same day pull can help manage the hole.
| USDA soil survey, inside the Santa Fe city limits | What is mapped |
|---|---|
| Soil series mapped | Mocarey 82 percent, Bernard 9 percent and Lake Charles 3 percent |
| Texture at the surface | loam 83 percent, clay loam 9 percent and silt loam 3 percent |
| Texture about 40 inches down | loam 78 percent, clay 13 percent and clay loam 7 percent |
| Engineering class about 40 inches down | lean clay (CL) 86 percent and fat clay (CH) 13 percent |
| Average clay content about 40 inches down | 27 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 97 percent of the area |
| Flood prone soils | 1 percent of the area |
| High corrosion risk for uncoated steel | 99 percent of the area |
Bedrock is not mapped in the top five feet of Santa Fe, and the USDA geology map identifies Beaumont Formation, areas predominantly sand, of Pleistocene age. That map describes the broader geology, not the exact material at a bore depth. A seasonal water table is mapped within 40 inches across 97 percent of the area, so pits near the Galveston County Water Company Canal may need pumping. Flood prone soils cover 1 percent. High steel corrosion risk is mapped across 99 percent, so the line owner should consider casing and tracer wire materials; HDPE is unaffected by soil corrosion.
How do we drill Santa Fe’s loam and clay ground?
Mocarey loam and the mapped clay near Avenue L call for controlled fluid and staged reaming. Across Santa Fe’s ZIP codes 77510, 77517 and 77511, we track the drill head from the surface and log depth and pitch as the bore advances.
- Mocarey loam can cling to the reamer, so we use controlled fluid and staged reaming to keep the bore manageable near Avenue L.
- A seasonal water table is mapped within 40 inches across 97 percent of Santa Fe, so we plan small pits and pumping where the route is wet.
- Before a bore approaches marked lines near 6th Street, we expose them with hydrovac potholing because surface marks do not show burial depth.
- For a crossing near the Galveston County Water Company Canal, we track depth and pitch and plan the bore path to pass beneath the channel.

Where might a Santa Fe line go under FM 646?
FM 646 runs for 10.3 mapped roadway miles inside Santa Fe, and Texas State Highway 6 covers 6.4 miles. FM 1764 adds 4.1 miles. Interstate 45 and US 75 are each 1.1 miles outside the city limits. A route may also run beneath Avenue L, which extends 4.57 miles in the city, or Avenue J and 16th Street, each among Santa Fe’s longest named streets. A bore beneath existing highway pavement avoids cutting across the road, but the route and work area must fit the road authority’s requirements.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 646 | State highway | 10.3 roadway miles inside | State highway office |
| Texas State Highway 6 | State highway | 6.4 roadway miles inside | State highway office |
| FM 1764 | State highway | 4.1 roadway miles inside | State highway office |
| Interstate 45 | Highway nearby | 1.1 miles outside | State highway office |
| US 75 | Highway nearby | 1.1 miles outside | State highway office |
| BNSF Railway | Railroad | 6.31 track miles inside | The railroad |
| Union Pacific | Railroad nearby | 0.1 miles outside | The railroad |
| Galveston County Water Company Canal | Stream | 3.07 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Highland Bayou | Stream | 2.14 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Cloud Bayou | Stream | 0.3 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Galveston County Water Canal | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
| Cedar Creek | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
BNSF Railway has 6.31 track miles inside Santa Fe, and public maps show 8 street and rail crossings. The Galveston County Water Company Canal runs 3.07 channel miles in the city; Highland Bayou runs 2.14 miles and Cloud Bayou 0.3 miles. Public maps show 13 street crossings of named streams. A route under a channel needs planning for the water crossing, while a BNSF route needs coordination with the track owner.
Who approves a Santa Fe bore near BNSF Railway?
Santa Fe is incorporated, so city streets such as Avenue L belong to the city. For work in the right of way of FM 646, Texas State Highway 6 or FM 1764, the line owner, not our drilling crew, submits the utility permit through TxDOT’s online RULIS system. The TxDOT Houston District reviews it. We give the owner the bore plan and profile and work under its permit. TxDOT cover rules include 60 inches at highway crossings for electric and communication lines and water lines, and 60 inches for pressurized sewer crossings. A BNSF Railway crossing needs an agreement with BNSF; a Galveston County Water Company Canal route is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines may already be buried in Galveston County near Santa Fe?
The water provider for a specific Santa Fe address has to be confirmed with the city, Galveston County or the local water district before a bore is planned. Electric service reported in Galveston County includes CenterPoint Energy, Entergy Texas and Texas-New Mexico Power. Those records do not identify the provider for every address. Before planning conduit along 6th Street or another route, we confirm which utility owns the line and check its conduit specifications.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| CenterPoint Energy, Entergy Texas and Texas-New Mexico Power | Electric utilities reporting service in Galveston County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Santa Fe’s median housing year at 1991, which we consider when planning underground work. For Santa Fe underground planning, the survey estimates 8 percent of homes were built before 1960, 56 percent from 1960 to 1999 and 36 percent in 2000 or later. A bore near Avenue L could serve a replacement line or a newer service, and the route may pass existing utilities from either era. We hydrovac pothole marked lines before drilling near them because locate paint shows position, not depth.

Do you cover Santa Fe and nearby League City?
Santa Fe is an incorporated city in Galveston County, with 16.98 square miles of land and an elevation of 27 feet. We use Santa Fe ZIP codes 77510, 77517 and 77511 to identify the project area before planning a bore. Dickinson is 5.2 miles northeast, La Marque is 6.6 miles east, and League City is 7.1 miles north. Galveston, the county seat, is 16.1 miles southeast. Our Yukon, Oklahoma main office is 491 road miles away, a 9.6 hour drive. We take work across Texas, including Santa Fe and nearby communities such as League City.
Places near Santa Fe
- Directional boring in Dickinson: 5.2 miles northeast
- Directional boring in La Marque: 6.6 miles east
- Directional boring in League City: 7.1 miles north
- Directional boring in Hillcrest Village: 7.3 miles west
- Directional boring in Alvin: 7.8 miles west
What kinds of bores may come up near Galveston County Water Company Canal in Santa Fe?
- Highway crossing: A bore beneath FM 646 can carry water, sewer or conduit without opening the highway pavement.
- Street service: A service line along Avenue L can be bored beneath pavement, with pits placed in dirt on each side.
- Fiber route: Fiber conduit near 16th Street can pass beneath driveways and sidewalks without cutting those surfaces.
- Canal crossing: A line beneath the Galveston County Water Company Canal needs a planned channel route and a jurisdiction check.
- Rail crossing: A utility bore beneath BNSF Railway needs an agreement with the track owner and the crossing conditions it sets.
- Water replacement: A water line near 6th Street can be routed by bore after the provider for the address is confirmed.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Santa Fe bore near 6th Street?
A map pin near 6th Street matters because the exact route can change which utilities, pavement or drainage features a bore must pass. For a Santa Fe bore, send the address or pin, what will go in the ground, pipe or conduit size and footage so we can plan the route. A sketch or plans help us see the proposed route and the locations of pits.
A straight route through Mocarey loam, away from traffic lanes and the Galveston County Water Company Canal, is simpler to plan than a route with several crossings. Length and pipe or conduit size matter, as do soil conditions, exposed utilities, pavement and creek crossings. A bore near FM 646 or BNSF Railway may need more crossing coordination. Pit locations, excavator time and sand backfill affect the work plan. Mobilization planning for Santa Fe accounts for 491 road miles from Yukon, so we confirm job details before scheduling directional boring.
Questions people ask about boring in Santa Fe
Does Trinity Boring Solutions take directional boring work in Santa Fe and Galveston County?
Yes. Our directional boring work covers Santa Fe and locations across Texas, with project details guiding each underground route. Our own crews and partner drilling contractors we have vetted staff the work, while you work with Trinity from the first call through the bore log. That applies to a route near Avenue L just as it does to a bore elsewhere in Galveston County.
Will a bore in Santa Fe hit rock below Avenue L?
The USDA soil survey does not map bedrock in Santa Fe’s top five feet, but that does not rule out rock deeper down. The geologic map shows Beaumont Formation, areas predominantly sand, of Pleistocene age. A specific route near Avenue L needs a plan based on its depth and conditions rather than the regional map alone.
Who approves a Santa Fe bore crossing FM 646?
For work in the FM 646 right of way, the line owner applies for the TxDOT utility permit through RULIS. The TxDOT Houston District reviews the application, and we provide the bore plan and profile for the owner’s filing. The permit sets the approved crossing details, including any required cover depth.
What does a Santa Fe bore under BNSF Railway require?
A crossing under BNSF Railway needs an agreement with BNSF, which owns 6.31 track miles inside Santa Fe. The railroad sets crossing conditions such as casing, depth and flagging. If the line also lies in highway right of way, TxDOT asks for a copy of the railroad agreement.
Can a line be bored under Galveston County Water Company Canal in Santa Fe?
A bore under the Galveston County Water Company Canal can be planned, but the channel crossing needs a route and depth plan. During planning, we check whether the crossing is within U.S. Army Corps of Engineers jurisdiction. The canal runs 3.07 channel miles inside Santa Fe, so the exact crossing point matters.
Which electric utility owns a line at my Santa Fe address in Galveston County?
County records report electric service by CenterPoint Energy, Entergy Texas and Texas-New Mexico Power, but they do not establish which company owns the line at every Santa Fe address. Before planning a Santa Fe electric conduit bore, we confirm the line owner and use the supplied address or pin to establish the route. The owner can also confirm the conduit specifications for the proposed work.
Does Trinity cover Dickinson and rural sites outside Santa Fe?
Yes. We take work across Texas, including Dickinson, which is 5.2 miles northeast of Santa Fe, and rural sites outside the city limits. A route near FM 1764 or the Galveston County Water Company Canal still needs a site specific plan for access, utilities and any crossings.
How much notice does Texas811 need for a bore along Avenue L in Santa Fe?
For a bore along Avenue L, request a locate through Texas811 at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. Texas811 describes this as at least two working days. If the start slips more than 14 days past the original notice, make a new request; refresh worn or moved marks through Texas811 before work continues.
What affects the cost of a directional bore near FM 646 in Santa Fe?
The route, length and pipe or conduit size all matter for a bore near FM 646. Mocarey loam, utilities that need exposure, pavement, nearby drainage crossings and pit or excavator needs can add work to the plan. Crossings at BNSF Railway and the 491 road miles from our Yukon main office can also affect mobilization and coordination.
Where the Santa Fe facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Santa Fe
- U.S. Census Bureau, TIGER/Line 2024: Santa Fe boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Santa Fe
- U.S. Census Bureau, American Community Survey 2019 to 2023: Santa Fe housing units and year built
- Macrostrat geologic map compilation: map units under Santa Fe
- U.S. Department of Transportation, North American Rail Network: track owners in Galveston County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Galveston County
- U.S. Geological Survey, Elevation Point Query Service: Santa Fe elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Santa Fe
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Santa Fe
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Santa Fe, Texas
Type the address of your job in Santa Fe. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Santa Fe
Same county: Texas City · Galveston · Friendswood · Bacliff · Hitchcock · San Leon · Kemah · Bolivar Peninsula · Bayou Vista · Clear Lake Shores · Tiki Island · Jamaica Beach. All counties: Texas county list.
