Benjamin Texas Directional Boring: Tillman Clay Loam, US 82, Clear Fork Group
Quick Answer: US 82 is one of the highways a utility route may need to pass, and we do directional boring, also called horizontal directional drilling (HDD), in Benjamin and across Texas. Benjamin is 226 road miles from our Yukon, Oklahoma main office, so that distance matters when planning a US 82 job. The USDA soil survey maps heavy clay under about 40 inches across the area. Sticky clay can load a reamer, so we plan staged passes and keep the pipe ready for pullback.
Benjamin bores at a glance
- County seat of Knox County, Texas. Population 194 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 226 miles, about 4.4 hours of driving.
- Ground: Tillman soil is mapped on 53 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 8 percent of the area.
- Highways inside the boundary: US 82, Texas State Highway 6 and Texas State Highway 114. State permit office: TxDOT Childress District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Benjamin, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring on Benjamin’s Stewart Street?
We take directional boring work in Benjamin, Knox County, for water, sewer, gas, electric conduit and fiber routes. Those lines may follow a planned route along Stewart Street or Hinton Street, or need to pass beneath a road without cutting its surface. The Census Bureau Vintage 2024 estimate puts Benjamin’s population at 194, so a route plan can focus on the specific service address rather than assume a large street network.
Our main office is in Yukon, Oklahoma, and Benjamin work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For directional boring planning in Benjamin, our family business started in 1965, and we have done directional boring since 1982, with clay loam informing our planning. As we plan around City of Benjamin water lines and electric service reported in Knox County, our record includes no utility strike in over 25 years.

What kind of ground does Benjamin’s Tillman soil mean for a bore?
The USDA soil survey maps Tillman soil across 53 percent of Benjamin, with Tillman clay loam on 39 percent of the mapped area at 0 to 1 percent slopes and another 15 percent at 1 to 3 percent slopes. Across the city, surface texture is clay loam on 87 percent and clay on 13 percent. At about 40 inches below the surface, the survey maps clay across the area, with average clay content of 45 percent. We treat Benjamin’s Tillman, Hollister, Vernon, and Mangum soil series as mapped patterns, not test borings. Expect sticky cuttings and a hole that can grip pipe.
| USDA soil survey, inside the Benjamin city limits | What is mapped |
|---|---|
| Soil series mapped | Tillman 53 percent, Hollister 31 percent, Vernon 8 percent, Mangum 5 percent and Wichita 3 percent |
| Texture at the surface | clay loam 87 percent and clay 13 percent |
| Texture about 40 inches down | clay 100 percent |
| Engineering class about 40 inches down | fat clay (CH) 97 percent and lean clay (CL) 3 percent |
| Average clay content about 40 inches down | 45 percent |
| Bedrock mapped within 60 inches | 8 percent of the area (0 percent hard rock, 8 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 5 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
Bedrock is mapped within 60 inches on 8 percent of Benjamin, with typical depth listed at 28 inches; hard bedrock is not mapped in that interval. The Clear Fork Group, of Kungurian age, includes mudstone, siltstone, sandstone, dolomite, limestone and gypsum, so the mapped material can change along a route. No seasonal water table is mapped within 60 inches, while flood prone soils cover 5 percent. High steel corrosion risk is mapped across the area, so the line owner should weigh casing and tracer wire materials. Clay needs controlled fluid and staged reaming.
How do we bore through Benjamin’s clay?
Benjamin’s clay soil calls for a steady bore plan, not a rushed pull. We track the drill head from the surface and log depth and pitch as the route advances, adjusting the work to the mapped ground and the crossings in the plan.
- Tillman clay loam covers much of Benjamin, so we use thinner drilling fluid and staged reaming to limit sticky buildup before the pipe pull.
- The survey maps clay at about 40 inches across the area; we watch returns and keep fluid pressure controlled near pavement to avoid lifting the surface.
- High steel corrosion risk is mapped across Benjamin, so the line owner considers casing and tracer wire materials while choosing the pipe and route.
- Before the drill approaches a marked line near Stewart Street, we expose it with hydrovac potholing; then we track depth and pitch from the surface.

Which roads, tracks or creeks might a Benjamin bore cross at US 82?
US 82, Texas State Highway 6 and Texas State Highway 114 run within Benjamin, so a route that enters their right of way needs early coordination. Stewart Street and Hinton Street are each mapped for 1.06 miles in the city; Cooper Street runs 0.74 miles, followed by Divide Street at 0.66 miles. A bore can pass below pavement and leave the road surface intact. The exact alignment matters because a highway crossing has different permit and cover requirements from a route along a city street.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 82 | US highway | 1 roadway miles inside | State highway office |
| Texas State Highway 6 | State highway | 1.1 roadway miles inside | State highway office |
| Texas State Highway 114 | State highway | 1 roadway miles inside | State highway office |
| Lake Benjamin | Lake or pond | 75 acres, nearby | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Benjamin or within 1 mile outside its limits, and none is mapped at a street crossing. No named stream is mapped in the city or within 1 mile, and no street crossing of a named stream is mapped. The map does show 0.51 miles of unnamed drainage in the city and Lake Benjamin, a 75 acre lake outside the limits but within 1 mile. If a planned route reaches that lake or a water crossing, the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Do I need a permit to bore under a Benjamin road in Knox County?
Benjamin is incorporated, so its city streets belong to the city itself; a street bore on Cooper Street or Stewart Street needs to be planned around that local street authority. US 82, Texas State Highway 6 and Texas State Highway 114 are state highways. Work in their right of way needs a TxDOT utility permit, reviewed by the TxDOT Childress District. The utility that owns the line files through TxDOT’s online RULIS system, while we prepare the bore plan and profile for that application and work under the owner’s permit. TxDOT rules require boring or tunneling beneath existing highway pavement. A route near Lake Benjamin also needs its water crossing checked for federal jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities are near the City of Benjamin water system?
The City of Benjamin public water system uses purchased surface water and has 191 service connections serving 235 people. That gives a water route a specific local system to coordinate with, but the line owner and service location still need confirmation for the planned address. AEP Texas North and Tri-County Electric Cooperative report electric service in Knox County. We confirm the electric line owner before planning a conduit bore, since those county reports do not identify the provider at every Benjamin address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Benjamin | Public water system | Surface water bought from another system | 191 connections, 235 people served |
| AEP Texas North and Tri-County Electric Cooperative | Electric utilities reporting service in Knox County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates place Benjamin’s median housing year at 1956, so we still verify utility locations before boring. It estimates 55 percent of homes were built before 1960, 45 percent from 1960 to 1999, and none in 2000 or later. A replacement route near Hinton Street may need to work around older buried services, while a new service follows its own planned alignment. We hydrovac pothole each marked utility on the bore path before drilling near it; a marked line beneath Stewart Street gets exposed too, since paint shows position, not depth.

Do you cover Benjamin and nearby Knox City?
Benjamin is the county seat of Knox County, covers 1.05 square miles and sits at an elevation of 1,478 feet. Its ZIP code is 79505. Knox City is 11.5 miles south, and Munday is 13.6 miles southeast; O’Brien is 14.4 miles south. Those nearby places can help orient a route discussion, but the address or map pin sets the actual job location. Benjamin is 226 road miles and a 4.4 hour drive from our Yukon, Oklahoma yard, so distance is part of mobilization planning for a bore on US 82 or a local street.
Places near Benjamin
- Directional boring in Knox City: 11.5 miles south
- Directional boring in Munday: 13.6 miles southeast
- Directional boring in O’Brien: 14.4 miles south
- Directional boring in Goree: 17.4 miles southeast
- Directional boring in Rochester: 19 miles south
What would we bore along Benjamin’s Hinton Street?
- Highway crossing: A bore beneath US 82 can keep the pavement uncut, with the route and cover addressed in the TxDOT permit plan.
- Water service: A connection planned near the City of Benjamin system needs the correct line owner and route confirmed for that address.
- Fiber route: A fiber path along Stewart Street can be planned with entry and exit pits off the pavement and utility exposure along the alignment.
- Sewer replacement: A planned replacement near Hinton Street can use a bore to pass under pavement while avoiding marked lines on the route.
- Electric conduit: A conduit route near Cooper Street starts with confirming the line owner, since Knox County service reports do not identify each address.
- Drainage crossing: A route near Benjamin’s mapped unnamed drainage needs its channel position considered before setting the bore path and pits.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send to price a bore near Benjamin’s Stewart Street?
Send us a map pin or an address on Stewart Street so we can identify the proposed boring location. The exact spot matters on Stewart Street because the route may approach a highway, pavement or an existing line differently from a nearby parcel. Include what will go underground, the pipe or conduit size and the footage. A sketch or plans help us see the entry and exit pits and the intended path before we discuss the scope.
The price follows the route details. An open, short path through Tillman clay loam is simpler to plan than a bore that needs staged reaming through heavy clay, crosses pavement or requires extra potholing. Pipe size, footage, exposed utilities, pit work, excavator time and sand backfill also shape the work. A crossing under US 82 adds permit coordination, and Benjamin’s 226 road miles from Yukon affect mobilization. Creek or drainage crossings and emergency timing can change the plan as well.
Questions people ask about boring in Benjamin
Does Trinity Boring Solutions take jobs in Benjamin and Knox County, and who does the work?
Yes. We take directional boring work across Texas and can plan a crossing of Texas State Highway 6 in Benjamin. Our crews and vetted partner drilling contractors can staff the job, while you work with Trinity from the first call through the bore log. For a route near Stewart Street, we plan the crew and equipment around the actual address and scope.
Who owns electric lines in Benjamin, Knox County, and who confirms conduit specs?
AEP Texas North and Tri-County Electric Cooperative report electric service in Knox County, but those reports do not identify the provider at every Benjamin address. We confirm the line owner for the planned route before a conduit bore, then the owner confirms its conduit requirements. That check matters for a route near Cooper Street as well as one near US 82.
Does the city or Knox County control Cooper Street in Benjamin, and must we cut it?
Because Benjamin is an incorporated city in Knox County, we confirm city authority before planning work on Hinton Street. A bore planned beneath Cooper Street can avoid cutting the pavement, subject to the route and approvals for that street. We set the entry and exit pits off the road where the site allows and expose marked utilities before drilling close to them.
How old are homes and buried lines near Hinton Street in Benjamin?
The American Community Survey 2019 to 2023 estimates put the median housing year at 1956, with 55 percent of homes built before 1960. Those figures do not date any specific buried line, so a replacement bore near Hinton Street needs utility locating and potholing before drilling. The exposed lines show actual positions and depths for that route.
Does Tillman soil in Benjamin corrode steel, and what pipe should we use?
The USDA soil survey maps high steel corrosion risk across Benjamin, including areas mapped as Tillman clay loam. The line owner should consider casing and tracer wire materials for the actual route. HDPE is not subject to the mapped soil corrosion concern, but the owner selects the materials for a bore near Hinton Street or elsewhere.
What ground does a bore go through in Benjamin’s Tillman soil?
The USDA soil survey maps Tillman soil on 53 percent of Benjamin, and clay across the area at about 40 inches below the surface. Average clay content at that depth is 45 percent. Sticky clay can build on a reamer and grip pipe, so a bore near Stewart Street may need staged reaming, controlled fluid and a prompt pull after the hole is opened.
How much notice does Texas811 need for a bore on Stewart Street in Benjamin?
For a bore along Stewart Street, place the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before the start. For a planned crossing on Divide Street, if the start slips more than 14 days past the original notice, we make a new request. If marks move near Cooper Street, we have them refreshed through Texas811 before we continue work.
How far is Benjamin from Trinity’s Yukon main office, and does that affect my job?
Benjamin is 226 road miles and a 4.4 hour drive from our Yukon, Oklahoma main office, so we plan visits ahead for Knox County work. That distance can affect mobilization for a bore near US 82 or a local street. The route length, pipe size, ground and crossings also shape the crew and equipment plan, so the map pin helps us assess the actual trip.
What affects our cost for a directional bore under US 82 in Benjamin, including TxDOT Childress District permitting?
The scope sets the price, with no single detail deciding it. For a US 82 crossing, the permit plan and pavement crossing matter; Tillman clay loam can call for staged reaming. Length, pipe size, utility exposure, pits, concrete or pavement, drainage crossings and distance from Yukon also affect the work. Send the location and plans so we can review the specific route.
Where the Benjamin facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Benjamin
- U.S. Census Bureau, TIGER/Line 2024: Benjamin boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Benjamin
- U.S. Census Bureau, American Community Survey 2019 to 2023: Benjamin housing units and year built
- Macrostrat geologic map compilation: map units under Benjamin
- U.S. EPA Safe Drinking Water Information System: public water systems serving Benjamin
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Knox County
- U.S. Geological Survey, Elevation Point Query Service: Benjamin elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Benjamin
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Benjamin
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Benjamin, Texas
Type the address of your job in Benjamin. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Benjamin
All counties: Texas county list.
