Goree Texas Directional Boring: Miles Fine Sandy Loam, US 277 and Lake Creek
Quick Answer: Miles fine sandy loam covers much of Goree, and its loose surface can fall back behind a drill head unless bore fluid supports it. We handle directional boring, also called horizontal directional drilling (HDD), for routes beneath US 277 and Goree streets without opening pavement. Goree is 213 road miles from our Yukon, Oklahoma main office, so a route near Lake Creek affects mobilization planning. At about 40 inches, the USDA soil survey maps sandy clay loam across 71 percent of Goree, where clay can grip a reamer and pipe.
Goree bores at a glance
- Incorporated city in Knox County, Texas. Population 156 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 213 miles, about 4.2 hours of driving.
- Ground: Miles soil is mapped on 71 percent of the area, with sandy clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 16 percent of the area.
- Highways inside the boundary: US 277, FM 266 and Spur 357. State permit office: TxDOT Childress District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Lake Creek.
- Public water: City of Goree, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near Lake Creek in Goree?
Miles fine sandy loam is the main mapped surface soil around Goree, and it can cave behind a bit if the hole is left open. The Census Bureau Vintage 2024 estimate puts this Knox County city at 156 people. Along 5th Street or near Lake Creek, our crews install water, sewer, gas, electric conduit and fiber lines by boring beneath the surface.
Our main office is in Yukon, Oklahoma, and Goree work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore ran roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa; a Goree run beneath 5th Street is a smaller, site specific job. We have been a family business since 1965 and have done directional boring since 1982.

How does Miles soil affect a Goree bore?
The USDA soil survey maps Miles soil across 71 percent of Goree, including Miles fine sandy loam on 63 percent of the mapped area. Surface texture is fine sandy loam across 71 percent. At about 40 inches, sandy clay loam is mapped under 71 percent, with an average clay content of 28 percent; silty clay loam accounts for 20 percent at that depth. We treat mapped Miles, Aspermont, Grandfield, and Clairemont soil patterns as planning context, not as test borings for Goree work. For a route near US 277, sandy material can loosen behind the bit, while the clay fraction can build up on the reamer and grip the pipe.
| USDA soil survey, inside the Goree city limits | What is mapped |
|---|---|
| Soil series mapped | Miles 71 percent, Aspermont 16 percent, Grandfield 7 percent and Clairemont 4 percent |
| Texture at the surface | fine sandy loam 71 percent, silty clay loam 16 percent and loamy sand 7 percent |
| Texture about 40 inches down | sandy clay loam 71 percent, silty clay loam 20 percent and sandy loam 7 percent |
| Engineering class about 40 inches down | clayey sand (SC) 78 percent and lean clay (CL) 22 percent |
| Average clay content about 40 inches down | 28 percent |
| Bedrock mapped within 60 inches | 16 percent of the area (0 percent hard rock, 16 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 4 percent of the area |
| High corrosion risk for uncoated steel | 22 percent of the area |
At Goree, weathered bedrock is mapped within 60 inches across 16 percent of the area, while hard bedrock is not mapped at that depth. The typical bedrock depth is 50 inches, so a route near FM 266 may meet slower, softer rock. Seasonal water table is not mapped within 60 inches, but flood prone soils cover 4 percent, so Lake Creek still needs a depth plan. High steel corrosion risk covers 22 percent; line owners should review steel casing and tracer wire, while HDPE avoids that concern. Eolian Sheet Sand of Quaternary age commonly overlies older alluvial deposits; Early Permian sedimentary rock is also mapped.
How do crews handle Goree sandy clay loam?
Goree soil combines a loose fine sandy loam surface with sandy clay loam at about 40 inches. We match fluid and reaming steps to that change and to the route near Lake Creek or US 277.
- In Miles fine sandy loam, we use drilling fluid to help hold the hole open, then ream in stages so loose ground is less likely to cave.
- Where sandy clay loam is mapped at about 40 inches, we use a thinner fluid mix and polymer, then pull the pipe soon after opening the hole.
- Near 5th Street pavement, we keep fluid pressure controlled and track the drill head from the surface, logging its depth and pitch.
- Before a Lake Creek route gets close to marked lines, we hydrovac pothole each utility to check depth; paint shows position, not depth.

Which roads or creeks could a Goree bore cross near 5th Street?
US 277, FM 266 and Spur 357 run inside Goree, so a highway route may involve state right of way rather than only a city street. The longer named streets include 5th Street, Hickory Street and Main Street; Holley Street is another route to consider. With 20.01 public road centerline miles inside the city, a bore alignment can pass beneath pavement or driveways. Boring keeps those surfaces uncut, with entry and exit pits placed in dirt.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 277 | US highway | 3.1 roadway miles inside | State highway office |
| FM 266 | State highway | 2.4 roadway miles inside | State highway office |
| Spur 357 | State highway | 0.8 roadway miles inside | State highway office |
| Lake Creek | Stream | 1.06 channel miles inside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Goree or within one mile outside its limits, so there is no mapped track crossing to route around. Lake Creek runs 1.06 channel miles through the city, and one mapped street crossing of a named stream makes a creek route worth checking. No lakes or ponds are mapped within one mile, leaving Lake Creek as the named water crossing to assess. A bore can pass below the creek without cutting its banks.
Who signs off on a Goree bore under US 277?
The cover depth sets how far below US 277 a bore must run: electric and communication crossings need 60 inches below the lowest crossed grade, and water and pressurized sewer crossings also need 60 inches. TxDOT Childress District reviews a utility permit for work in the right of way of US 277, FM 266 or Spur 357. The utility owner files through TxDOT’s RULIS system; we provide the bore plan and profile and work under the owner’s permit. Existing highway pavement is bored or tunneled, and a creek route at Lake Creek is checked for U.S. Army Corps of Engineers jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the City of Goree water lines and nearby electric lines?
The City of Goree public water system uses purchased surface water and lists 133 service connections serving 156 people. That gives a water service bore near 5th Street a known system owner to coordinate with. AEP Texas North and Tri-County Electric Cooperative report electric service in Knox County, but the line owner is confirmed for the specific route before planning an electric conduit bore near US 277.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Goree | Public water system | Surface water bought from another system | 133 connections, 156 people served |
| AEP Texas North and Tri-County Electric Cooperative | Electric utilities reporting service in Knox County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Goree’s median housing year at 1966; 41 percent of homes were built before 1960, 56 percent from 1960 to 1999 and 3 percent in 2000 or later. That mix can mean replacing older service lines as well as adding new connections along Hickory Street. Before a drill approaches marked utilities, we hydrovac pothole them to check their depth; paint alone does not show how deep a line sits.

Do you cover Goree and nearby Weinert?
Goree is in Knox County, at an elevation of 1,451 feet, and covers 1.45 square miles. ZIP code 76363 serves Goree in Knox County, while we plan underground work by actual location, not postal boundaries. Munday is 6.0 miles west; Weinert is 13.2 miles southwest, and Knox City is 17.2 miles west. Benjamin, the county seat, is 17.4 miles northwest. Our Yukon, Oklahoma yard is 213 road miles away, a 4.2 hour drive, so the route and distance factor into mobilization for work near US 277 or Lake Creek.
Places near Goree
- Directional boring in Munday: 6 miles west
- Directional boring in Weinert: 13.2 miles southwest
- Directional boring in Knox City: 17.2 miles west
- Directional boring in Benjamin: 17.4 miles northwest
- Directional boring in Seymour: 17.6 miles northeast
What boring work comes up near Goree’s Hickory Street?
- Highway crossing: A route beneath US 277 needs a bore plan that fits the highway cover and pavement requirements.
- Water service: A connection near 5th Street can tie into the City of Goree system, which uses purchased surface water.
- Creek crossing: A Lake Creek route can pass below the channel and banks, with the crossing checked for federal jurisdiction during planning.
- Fiber conduit: A run along Hickory Street can be bored beneath pavement, with marked utilities exposed before the drill approaches.
- Electric conduit: Near FM 266, we first confirm the line owner because AEP Texas North and Tri-County Electric Cooperative report service in Knox County.
- Street service: A bore near Holley Street can avoid an open cut across pavement, with entry and exit pits set in dirt.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Goree bore near Holley Street?
A map pin matters near Holley Street because the route may be close to Lake Creek or a named highway, changing the crossings and access to check. Send the Goree address or pin, what will go underground, the pipe or conduit size and footage. A sketch or plans help us see pits, pavement and nearby utilities before we set the scope.
A clear route along Holley Street with few crossings is simpler to plan than a bore under US 277 or Lake Creek. Length, pipe size, Miles soil and any weathered rock all affect the work. We also consider utilities to expose, pavement, creek conditions, pits, excavator time and sand backfill. Goree’s 213 road miles from Yukon affect mobilization, and high profile or emergency work can add planning needs.
Questions people ask about boring in Goree
Does Trinity take directional boring jobs in Goree and Knox County, and who staffs them?
Yes. We take Goree work with our own crews and through partner contractors we have vetted, while Trinity remains your contact from the first call through the bore log. For a route near Lake Creek or 5th Street, we plan around the specific access, soil and utilities rather than assuming every address is alike.
What ground does a bore pass through in Goree, including Miles soil?
Miles soil is mapped across 71 percent of Goree, and fine sandy loam is the leading surface texture. At about 40 inches, the USDA soil survey maps sandy clay loam across 71 percent of the area. Loose sand can fall back behind the bit, while clay can collect on the reamer and grip the pipe.
Is rock likely to affect a directional bore in Goree?
Weathered bedrock is mapped within 60 inches across 16 percent of Goree, with a typical depth of 50 inches. In Goree’s Miles soil series, hard bedrock is not mapped within that depth, so we treat the map as planning context, not a site test. A route near FM 266 could meet softer rock and drill more slowly, so the map helps with planning but does not replace site information.
Who approves a bore beneath US 277 in Goree, and which TxDOT office reviews it?
For a bore in the US 277 right of way, the utility owner applies through TxDOT’s RULIS system, and the TxDOT Childress District reviews the permit. We prepare the bore plan and profile for the owner and work under its permit. Highway crossing cover and pavement requirements shape the bore depth and method.
Can a line be bored beneath Lake Creek in Goree?
A bore can pass beneath Lake Creek without cutting the channel banks. The creek runs 1.06 channel miles inside Goree, and one mapped street crossing of a named stream is present. During planning, the creek crossing is checked for U.S. Army Corps of Engineers jurisdiction and the route is set to stay below the channel.
For Goree boring work along Main Street, who runs the public water system, and where does its water come from?
The City of Goree owns the public water system, and its source is purchased surface water. The system lists 133 service connections serving 156 people. For a water line bore near 5th Street, knowing the system owner gives us a starting point for coordinating the route and checking marked lines.
How far is Goree from Trinity’s Yukon, Oklahoma main office, and does that affect a job?
Goree is 213 road miles from our Yukon main office, with a listed drive of 4.2 hours. That distance can affect mobilization for work near US 277 or Lake Creek. The route, equipment needs and job scope help determine how the crew and materials are planned for the site.
How early should I request 811 marks for a Goree bore near 5th Street?
Paint near 5th Street shows a marked line’s position, not its depth. Texas law requires a Texas811 request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If work slips more than 14 days past the original notice, make a new request; have worn or moved marks refreshed through Texas811 before work continues.
What affects the cost of directional boring under US 277 in Goree?
The work scope drives the price: bore length and pipe size, Miles soil or weathered rock, and the number of utilities to expose all matter. A US 277 crossing may add pavement and permit planning, while a Lake Creek route brings creek conditions into the plan. Pit work, sand backfill and mobilization from Yukon also affect the job.
Where the Goree facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Goree
- U.S. Census Bureau, TIGER/Line 2024: Goree boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Goree
- U.S. Census Bureau, American Community Survey 2019 to 2023: Goree housing units and year built
- Macrostrat geologic map compilation: map units under Goree
- U.S. EPA Safe Drinking Water Information System: public water systems serving Goree
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Knox County
- U.S. Geological Survey, Elevation Point Query Service: Goree elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Goree
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Goree
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Goree, Texas
Type the address of your job in Goree. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Goree
All counties: Texas county list.