Hico Texas Directional Boring: Doss Soil, US 281 and Jacks Hollow Branch
Quick Answer: Doss soil and the mapped clay loam can hold a bore open, but sticky cuttings can build on the reamer. We take directional boring, also called horizontal directional drilling (HDD), in Hico, Texas, for routes beneath US 281 and local streets. Hico is 292 road miles from our Yukon, Oklahoma main office, so a route near Jacks Hollow Branch helps us plan mobilization. Shallow mapped bedrock can slow a bore, so the ground along the planned route matters.
Hico bores at a glance
- Incorporated city in Hamilton County and Erath County, Texas. Population 1,476 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 292 miles, about 5.8 hours of driving.
- Ground: Doss soil is mapped on 34 percent of the area, with bedrock about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 50 percent of the area.
- Highways inside the boundary: US 281, Texas State Highway 6 and Texas State Highway 220. State permit office: TxDOT Waco District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Jacks Hollow Branch, North Bosque River and Grubbs Branch.
- Public water: City of Hico, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Mesquite Street in Hico?
Doss soil is common around Hico, and sticky clay can collect on a reamer. We install water, sewer, gas, electric conduit and fiber lines along routes such as Mesquite Street, 1st Street and US 281. The Census Bureau Vintage 2024 estimate puts Hico at 1,476 residents. We plan each bore for the route, the line size and the ground it will cross.
Our main office is in Yukon, Oklahoma, and Hico work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965. Since 1982, four decades of directional boring have shaped how we plan for Hico ground, where Doss soil and shallow mapped bedrock can change a bore route.

How does Doss soil affect a directional bore in Hico?
The USDA soil survey maps Doss soil across 34 percent of Hico, with Krum silty clay mapped across 24 percent. At the surface, clay loam covers 48 percent and silty clay covers 33 percent of the mapped area. About 40 inches down, the survey lists heavy clay across 43 percent and sandy clay across 12 percent. Clay can hold an open hole, but sticky cuttings may load the reamer. These are mapped patterns, not test borings, so the route still needs to guide the drilling plan.
| USDA soil survey, inside the Hico city limits | What is mapped |
|---|---|
| Soil series mapped | Doss 34 percent, Krum 24 percent, Bosque 13 percent, Windthorst 12 percent and Frio 7 percent |
| Texture at the surface | clay loam 48 percent, silty clay 33 percent and very fine sandy loam 13 percent |
| Texture about 40 inches down | bedrock 35 percent, silty clay 24 percent and clay loam 13 percent |
| Engineering class about 40 inches down | lean clay (CL) 34 percent and fat clay (CH) 31 percent |
| Average clay content about 40 inches down | 39 percent |
| Bedrock mapped within 60 inches | 50 percent of the area (3 percent hard rock, 47 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 21 percent of the area |
| High corrosion risk for uncoated steel | 32 percent of the area |
Bedrock is mapped within 60 inches across 50 percent of Hico, with a typical mapped depth of 26 inches. That can mean slower drilling and a change in steering where soil meets rock. The survey maps no seasonal water table within 60 inches, but flood prone soils cover 21 percent, including ground near Jacks Hollow Branch. Given Hico’s clay loam surface soil, we consider casing and tracer wire where high steel corrosion risk is mapped across 32 percent. Mapped geology includes cherty calcareous clay solution residuum of Cenozoic age and Glen Rose Limestone of Aptian age.
What does it take to bore Hico bedrock and clay?
Hico’s Doss and Krum soils call for a plan that accounts for sticky clay and shallow mapped bedrock. We check the route first, then choose the drilling approach for the ground and crossings.
- Doss soil and silty clay can cling to the reamer, so we use staged reaming and plan to pull the pipe the day the hole is opened.
- Where Hico’s heavy clay is mapped, we watch fluid returns closely and keep pressure low enough to avoid lifting nearby pavement.
- With bedrock mapped at a typical depth of 26 inches, the route may need slower drilling and a rock capable bit at the soil contact.
- Near Jacks Hollow Branch, we plan the bore below the channel, expose marked utilities with hydrovac, and track depth and pitch from the surface.

Which roads, tracks or creeks can a bore cross in Hico near US 281?
US 281 runs 0.5 mapped roadway miles inside Hico, while Texas State Highway 6 covers 1.2 miles and Texas State Highway 220 covers 0.9 miles. A route beneath one of these highways needs a plan for the pavement and right of way. Mesquite Street is the longest named street at 2.08 miles. 1st Street runs 1.71 miles, while 2nd Street and Pecan Street each cover 1.33 miles. Those street runs offer possible bore routes without cutting the surface.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 281 | US highway | 0.5 roadway miles inside | State highway office |
| Texas State Highway 6 | State highway | 1.2 roadway miles inside | State highway office |
| Texas State Highway 220 | State highway | 0.9 roadway miles inside | State highway office |
| Jacks Hollow Branch | Stream | 1.43 channel miles inside | Checked for Corps of Engineers jurisdiction |
| North Bosque River | Stream | 0.89 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Grubbs Branch | Stream | 0.83 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Jacks Hollow Branch North Bosque R | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Hico or within one mile outside its limits, and no mapped street and rail crossing is listed. The North Bosque River, Jacks Hollow Branch and Grubbs Branch run through the city for 0.89, 1.43 and 0.83 channel miles, respectively. Public records map eight street crossings of named streams. No lake or pond is mapped within one mile. A creek route needs depth planning, and its crossing is checked for federal waterway jurisdiction during planning.
Whose permission does a Hico bore in Hamilton County need?
Hico is incorporated, so the city controls its local streets, including Mesquite Street and 2nd Street. A bore within US 281 or either state highway’s right of way needs a TxDOT utility permit. The TxDOT Waco District reviews it, while the utility owner submits the application through RULIS; we prepare the bore plan and profile for that filing. TxDOT requires boring or tunneling under existing highway pavement, with the bore extending beneath all travel lanes on rural highways. No railroad is mapped near Hico, and Jacks Hollow Branch crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Hico water system?
The City of Hico public water system uses groundwater wells and reports 801 service connections serving 1,379 people. That network matters when planning water or sewer work near local streets. Electric service reported in Hamilton County includes Texas-New Mexico Power, Hamilton County Electric Cooperative Association, Heart of Texas Electric Cooperative and United Electric Cooperative Service. We confirm the line owner for the specific route before planning an electric conduit bore, since countywide reports do not identify the provider at every address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Hico | Public water system | Groundwater wells | 801 connections, 1,379 people served |
| Texas-New Mexico Power, Hamilton County Electric Cooperative Association, Heart of Texas Electric Cooperative and United Electric Cooperative Service | Electric utilities reporting service in Hamilton County and Erath County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Hico’s median housing year at 1968; 33 percent of homes were built before 1960, while 11 percent date to 2000 or later. A replacement line along 1st Street may need to meet older buried services, not just newer connections. We use hydrovac potholing to expose marked utilities before drilling near them. Paint shows a line’s position, not its depth, so potholes help establish the actual clearance.

Do you cover Hico and nearby Iredell?
Hico covers 1.82 square miles at an elevation of 1,043 feet, mostly in Hamilton County, with a small part in Erath County. Its ZIP code is 76457. Iredell is 9.2 miles east, and Carlton is 9.5 miles southwest; Walnut Springs is 17.0 miles east. Stephenville is 19.4 miles northwest, while Hamilton, the county seat, is 20.4 miles south. From our Yukon yard, Hico is 292 road miles and a 5.8 hour drive, which we consider when planning mobilization for work in town or nearby rural areas.
Places near Hico
- Directional boring in Iredell: 9.2 miles east
- Directional boring in Carlton: 9.5 miles southwest
- Directional boring in Walnut Springs: 17 miles east
- Directional boring in Lamkin: 17.6 miles southwest
- Directional boring in Cranfills Gap: 18.5 miles southeast
- Directional boring in Stephenville: 19.4 miles northwest
What kinds of bores come up in Hico near 2nd Street?
- Highway crossing: A bore under US 281 needs a route and profile suited to the pavement, travel lanes and TxDOT right of way.
- Water service: A new service near the City of Hico system needs a route that accounts for groundwater wells and existing connections.
- Fiber conduit: A route along Mesquite Street can pass beneath pavement without an open cut, with marked utilities exposed before drilling near them.
- Creek crossing: A bore near Jacks Hollow Branch needs depth planning below the channel and a jurisdiction check during planning.
- Sewer replacement: A route near 1st Street can avoid cutting the surface while potholes help locate existing buried lines.
- Electric conduit: Before planning a bore near Pecan Street, we confirm the line owner because several utilities report service in Hamilton County.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a Hico bore near Pecan Street?
A map pin near Pecan Street matters because a few blocks can change the soil, road crossings or nearby drainage. For Mesquite Street, we need the address or pin, what will go underground, pipe or conduit size, and footage. A sketch or plans help us see how the route relates to Jacks Hollow Branch or a highway crossing.
A short route in clay loam with no pavement or creek crossing is simpler to plan than a long bore through Doss soil near a highway. Price depends on length, pipe or conduit size, soil and rock, utilities to expose, pavement, creek crossings, pits and excavator time. A route under US 281 needs crossing planning, and Hico’s 292 road miles from Yukon affect mobilization. US 281 crossings or emergency work can change the scope, so we review Hico boring plans accordingly.
Questions people ask about boring in Hico
Does Trinity take directional boring work in Hamilton County near Hico?
Yes. We take directional boring work in Hico and across Texas, including routes near US 281 and Jacks Hollow Branch. Our Yukon main office coordinates the project, and our own crews or partner contractor crews we have vetted may perform the work. You work with Trinity through planning and the bore log, whichever crew is on site.
Who controls 2nd Street in Hico, and can you bore beneath it without cutting it?
Hico controls its city streets, including 2nd Street. We can plan a directional bore beneath the street so the pavement does not need an open cut. The route still depends on the utilities and ground below it, so marked lines on 2nd Street are exposed before the drill approaches.
Could older buried lines along 1st Street affect a Hico replacement bore?
They could. The American Community Survey 2019 to 2023 estimates put Hico’s median housing year at 1968, with 33 percent of homes built before 1960. That age makes existing services a planning concern for a replacement route near 1st Street. We pothole marked utilities to confirm their depth before drilling close to them.
Are bore pits near Jacks Hollow Branch in Hico likely to hit groundwater or flooding?
The USDA soil survey maps no seasonal water table within 60 inches, but flood prone soils cover 21 percent of Hico. Jacks Hollow Branch is one of the named streams in the city. We plan pits and the bore depth for the site rather than assuming every location beside the branch has the same conditions.
Can Doss soil in Hico corrode steel casing, and what pipe can go in the bore?
The mapped soils show high steel corrosion risk across 32 percent of Hico, so the line owner should weigh casing and tracer wire materials. We install HDPE as well as other line materials, and HDPE is not subject to the mapped soil corrosion concern. Doss soil covers 34 percent of the city, but the exact route still matters.
What ground should I expect for a Hico bore through Doss soil?
Doss soil is mapped across 34 percent of Hico, and clay loam is the leading surface texture at 48 percent. About 40 inches down, the USDA soil survey maps heavy clay across 43 percent of the area and bedrock across 35 percent. Sticky clay can load a reamer, while shallow rock may slow drilling.
Does Trinity serve Iredell and rural sites outside Hico too?
Yes. We take work in the Hico area, including Iredell, 9.2 miles east, and rural sites outside city limits. Routes beyond Hico can have different access, ground and crossing conditions, so we plan each job from its location and scope. Hamilton, the county seat, is 20.4 miles south.
How far ahead should I call Texas811 for a bore near Mesquite Street in Hico?
For a Mesquite Street bore, make the Texas811 request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays. The request cannot be made more than 14 days before work starts. If a Hico start slips more than 14 days past the original notice, we submit a new request through TxDOT Waco District. Along Jacks Hollow Branch, we have worn or moved marks refreshed through Texas811 before work continues.
What affects the price of directional boring near US 281 in Hico?
The route and scope drive the price. Length, pipe size, Doss soil or bedrock, utilities to expose, pavement, pits and creek crossings all affect planning. A US 281 crossing can add highway requirements, while a route near Jacks Hollow Branch adds creek considerations. Hico’s 292 road miles from Yukon also affect mobilization.
Where the Hico facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Hico
- U.S. Census Bureau, TIGER/Line 2024: Hico boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Hico
- U.S. Census Bureau, American Community Survey 2019 to 2023: Hico housing units and year built
- Macrostrat geologic map compilation: map units under Hico
- U.S. EPA Safe Drinking Water Information System: public water systems serving Hico
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Hamilton County and Erath County
- U.S. Geological Survey, Elevation Point Query Service: Hico elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Hico
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Hico
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Hico, Texas
Type the address of your job in Hico. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Hico
Same county: Hamilton · Evant. All counties: Texas county list.
