trinityboringsolutions.com

Cedar Creek Texas Directional Boring: Crockett Soil, Cedar Creek, Texas State Highway 21

Quick Answer: The water provider for a Cedar Creek address must be confirmed with Bastrop County or a local water district, while Oncor Electric Delivery Company, Bluebonnet Electric Cooperative and Fayette Electric Cooperative report service in the county. We take directional boring, also called horizontal directional drilling (HDD), work near Cedar Creek and Texas State Highway 21. The Yukon main office is 419 road miles away, a factor on a bore near McDonald Lane. Crockett soil and clay at depth can grip pipe, so the reaming and pullback need close control.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Cedar Creek bores at a glance

  • Unincorporated community in Bastrop County, Texas. Population 3,154 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 419 miles, about 8.1 hours of driving.
  • Ground: Crockett soil is mapped on 35 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 35 percent of the area.
  • Highways inside the boundary: Texas State Highway 21, FM 535 and FM 812. State permit office: TxDOT Austin District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Cedar Creek, Maha Creek, Hobbs Creek and Greens Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Cedar Creek near Texas State Highway 21?

Cedar Creek is in Bastrop County, and the Census Bureau counted 3,154 residents here in 2020. We install water, sewer, gas, electric conduit and fiber, with routes that can follow McDonald Lane or connect services near Texas State Highway 21. Before an electric conduit bore, we confirm which county reported utility owns the line, so the right party is identified for the work.

Our main office is in Yukon, Oklahoma, and Cedar Creek work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965 and has drilled directionally since 1982. That experience covers service lines through 48 inch casing for work along Texas State Highway 21 and the local roads.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What does the USDA soil survey show under Cedar Creek’s Crockett soil?

The USDA soil survey maps Crockett soils across 35% of Cedar Creek. Fine sandy loam is the most common surface texture, covering 43% of the mapped area, while clay loam covers 32%. At about 40 inches below the surface, clay is mapped under 67% of the area and clay loam under 26%; the average clay content at that depth is 40%. These are mapped soil patterns, not test borings. For a bore near Watts Lane, the deeper clay can stick to a reamer and grip pipe during pullback.

USDA soil survey, inside the Cedar Creek mapped community boundaryWhat is mapped
Soil series mappedCrockett 35 percent, Whitesboro 15 percent, Wilson 15 percent, Edge 14 percent and Mabank 6 percent
Texture at the surfacefine sandy loam 43 percent, clay loam 32 percent and gravelly fine sandy loam 10 percent
Texture about 40 inches downclay 67 percent, clay loam 26 percent and sandy clay loam 6 percent
Engineering class about 40 inches downfat clay (CH) 57 percent and lean clay (CL) 41 percent
Average clay content about 40 inches down40 percent
Bedrock mapped within 60 inches35 percent of the area (0 percent hard rock, 35 percent weathered rock)
Seasonal water table within 60 inches8 percent of the area
Flood prone soils17 percent of the area
High corrosion risk for uncoated steel67 percent of the area

Weathered bedrock is mapped within 60 inches across 35% of Cedar Creek, with a typical depth of 53 inches, so the drill may meet a slower, firmer layer. Seasonal water tables are mapped within 60 inches across 8%, and flood prone soils cover 17%, making pits near Cedar Creek worth planning with care. High steel corrosion risk covers 67% of the area; the line owner selects any coating for steel casing or tracer wire, while HDPE avoids that steel concern. The geologic map includes Holocene alluvial sand, silt, clay, and gravel and Paleogene Early Eocene sedimentary material, which can mean changing ground along a route.

How do we drill Cedar Creek’s clay and mixed ground?

Crockett soil and clay mapped beneath Cedar Creek call for controlled fluid and staged reaming. We adjust the bore to the ground on the route, whether the job follows Watts Lane or approaches a creek crossing.

  1. Crockett soil maps clay at depth across much of Cedar Creek, so we use thinner fluid and staged reaming to limit sticky buildup on the reamer.
  2. Where clay may grip pipe near Watts Lane, we plan pullback for the same work period as opening the hole, rather than leaving it open.
  3. At Texas State Highway 21, we watch fluid returns and pressure so heavy clay does not push fluid toward pavement.
  4. Near Cedar Creek, flood prone soils and possible shallow water call for planned pit placement, with pumping available if a pit fills.
Rock bit on the drill rod at the front of a Vermeer D24x40 S3 with broken sandstone at the entry of a rock bore in Guthrie, OK
Rock bit on the drill rod with broken sandstone at the entry of a rock bore in Guthrie, Oklahoma.

What does a bore have to cross around Cedar Creek and Cedar Creek?

Texas State Highway 21, FM 535 and FM 812 run inside the mapped Cedar Creek community, with 7.4, 4.1 and 3.2 roadway miles mapped there, respectively. McDonald Lane is the longest named street at 3.39 miles, followed by Watts Lane at 2.91 miles and Mesquite Drive at 2.77 miles. A route crossing one of these roads needs a plan that keeps the surface intact where boring is suitable; the highway right of way has separate TxDOT requirements.

CrossingTypeMapped extentWho has a say
Texas State Highway 21State highway7.4 roadway miles insideState highway office
FM 535State highway4.1 roadway miles insideState highway office
FM 812State highway3.2 roadway miles insideState highway office
Cedar CreekStream14.05 channel miles insideChecked for Corps of Engineers jurisdiction
Maha CreekStream2.94 channel miles insideChecked for Corps of Engineers jurisdiction
Hobbs CreekStream2.62 channel miles insideChecked for Corps of Engineers jurisdiction
Greens CreekStream1.98 channel miles insideChecked for Corps of Engineers jurisdiction
Cottonwood CreekStream nearby0.6 miles outsideChecked for Corps of Engineers jurisdiction
Alum CreekStream nearby0.8 miles outsideChecked for Corps of Engineers jurisdiction
Trigg LakeLake or pond14 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Cedar Creek or within 1 mile, so the mapped street and rail crossing count is none. If a proposed route reaches a track, the railroad that owns it sets crossing conditions through its agreement. Cedar Creek has 14.05 channel miles inside the community, and 11 mapped street crossings of named streams occur there. Maha Creek, Hobbs Creek and Greens Creek are also mapped. Trigg Lake lies within 1 mile, outside the community boundary.

Who has to sign off on a Cedar Creek bore in Bastrop County?

Cedar Creek is an unincorporated community, so it has no city government to permit its streets; check the county or state authority for the route on McDonald Lane or Mesquite Drive. Texas State Highway 21, FM 535 and FM 812 are TxDOT roads, and work in their right of way needs a utility permit reviewed by the TxDOT Austin District. The utility owner files through TxDOT’s RULIS system; we prepare the bore plan and profile and work under the owner’s permit. For a creek route at Cedar Creek, planning includes checking U.S. Army Corps of Engineers jurisdiction.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities own lines in Cedar Creek and Bastrop County?

The water provider for a specific Cedar Creek address has to be confirmed with Bastrop County or the local water district before a bore is planned. Oncor Electric Delivery Company, Bluebonnet Electric Cooperative and Fayette Electric Cooperative report electric service in Bastrop County; that does not establish which one serves a given address. We confirm the electric line owner before planning a conduit bore near Texas State Highway 21 or a local street.

Line ownerWhat it isSourceSize
Oncor Electric Delivery Company, Bluebonnet Electric Cooperative and Fayette Electric CooperativeElectric utilities reporting service in Bastrop CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Cedar Creek’s median housing year at 1999; 17% of housing was built before 1960 and 46% in 2000 or later. That mix can mean either replacement lines or new services along Watts Lane. We expose every marked utility by hydrovac potholing before drilling near it. For example, a proposed bore under Mesquite Drive needs the marked lines exposed first because paint shows position, not depth.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

Do you cover Cedar Creek and nearby Wyldwood?

Cedar Creek is an unincorporated community in Bastrop County, at an elevation of 420 feet and covering 18.0 square miles. Its ZIP code is 78612. Wyldwood is 3.8 miles northeast; Garfield is 8.9 miles north, and Red Rock is 9.4 miles southeast. Bastrop, the county seat and nearest larger city, is 11.7 miles east. Our Yukon, Oklahoma yard is 419 road miles away, with a drive of 8.1 hours, so distance is part of planning work near Texas State Highway 21.

Places near Cedar Creek

Which Cedar Creek jobs call for a bore near Watts Lane?

  • Highway crossing: A bore beneath Texas State Highway 21 keeps the pavement uncut and is planned to meet the applicable TxDOT cover and right of way conditions.
  • Water service: A route from a confirmed provider near Mesquite Drive can use a bore to avoid opening the street surface.
  • Fiber conduit: A fiber route along Watts Lane needs marked utilities exposed before the drill approaches them.
  • Creek crossing: A bore near Cedar Creek needs a planned path beneath the channel and a jurisdiction check during planning.
  • Drainage crossing: Work near Maha Creek or Hobbs Creek can use pits set back from the crossing instead of cutting the channel bank.
  • Replacement line: A new route near McDonald Lane can replace an older service while keeping the road surface intact.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Cedar Creek bore near McDonald Lane?

A map pin matters near McDonald Lane because the exact crossing point determines which road, utility and ground conditions the bore meets. Send the address, what will go in the ground, the pipe or conduit size and the footage. A sketch or plans help us see how the route sits beside Cedar Creek or Texas State Highway 21.

A straight service route in fine sandy loam away from pavement is simpler to plan than a crossing near Cedar Creek or Texas State Highway 21. Length, pipe or conduit size, clay or weathered bedrock, utility exposures, pavement, creek crossings, pits and excavator time all shape the scope. The 419 road miles from Yukon also affect mobilization to McDonald Lane. High profile or emergency work can add planning demands.

Questions people ask about boring in Cedar Creek

Does Trinity Boring Solutions take Cedar Creek jobs in Bastrop County, and who staffs them?

Yes. We take directional boring work in Cedar Creek and staff it with our own crews or crews from satellite yards run by drilling partners we have personally vetted. You work with Trinity from the first call through the bore log, including work planned near McDonald Lane or Texas State Highway 21.

Who controls Cedar Creek streets such as Mesquite Drive, and does a bore cut them?

Cedar Creek is unincorporated, so it has no city government; county or state authority depends on the road. Mesquite Drive is a local street, while Texas State Highway 21 is under TxDOT jurisdiction. Directional boring can pass beneath a street without cutting its surface when the route and conditions allow.

Are the buried lines near Cedar Creek’s Watts Lane as old as its housing?

The American Community Survey 2019 to 2023 estimates give Cedar Creek a median housing year of 1999, but they do not date buried lines on Watts Lane. A replacement bore can follow an older service route or serve newer construction. We expose marked utilities before drilling near them so their actual position and depth are checked.

Can groundwater or flooding affect bore pits along Cedar Creek near Cedar Creek?

It can. The USDA soil survey maps seasonal water tables within 60 inches across 8% of Cedar Creek and flood prone soils across 17%. Near the Cedar Creek channel, we plan pit locations and depth with those conditions in mind; pumping may be needed if a pit takes on water.

Can Crockett soil in Cedar Creek corrode steel, and what pipe should we use?

The soil survey maps high steel corrosion risk across 67% of Cedar Creek, including Crockett soil areas. The line owner chooses any coating for steel casing or tracer wire. HDPE is not subject to that steel corrosion concern, but the proper pipe material depends on the line owner’s specifications and the job near Watts Lane.

What ground does a Cedar Creek bore pass through in Crockett soil?

The USDA soil survey maps Crockett soils across 35% of Cedar Creek. At about 40 inches below the surface, clay covers 67% of the mapped area, while clay loam covers 26%. That deeper clay can stick to the reamer and grip pipe, so a route near McDonald Lane may need staged reaming and controlled fluid.

Can I call Trinity after hours about an urgent Cedar Creek bore near Mesquite Drive?

Yes. A person answers Trinity’s phone 24 hours a day at (405) 409-7423. For an urgent bore near Mesquite Drive, have the location and planned line information ready so we can understand the route and conditions, including any nearby marked utilities or pavement.

How early do I call Texas811 for a Cedar Creek bore near McDonald Lane?

For a bore near McDonald Lane, request a locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no more than 14 days ahead. The ticket has a 20 day life around the planned start. If the start slips more than 14 days past the original notice, make a new request; have worn or moved marks refreshed through Texas811 before work continues.

What affects the cost of a Cedar Creek bore under Texas State Highway 21?

The scope, not just the route length, sets the price. A Texas State Highway 21 crossing may involve pavement and TxDOT requirements; Crockett clay, utility exposures, creek crossings, pits and excavator time can also change the work. Pipe size and mobilization from the Yukon yard matter too, which is 419 road miles from Cedar Creek.

Where the Cedar Creek facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Cedar Creek

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Cedar Creek, Texas

Type the address of your job in Cedar Creek. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Cedar Creek

Same county: Elgin · Camp Swift · Smithville · Circle D-KC Estates · McDade · Paige · Rosanky. All counties: Texas county list.