trinityboringsolutions.com

Paige Texas Directional Boring: Behring Clay, US 290 and Austin Western Railroad

Quick Answer: What does the top five feet look like in Paige? The USDA soil survey maps Behring clay loam above clay at 40 inches. We do directional boring, also called horizontal directional drilling (HDD), for lines that need to cross US 290 or local roads. Paige is 406 road miles from our Yukon, Oklahoma main office, and Austin Western Railroad is one local crossing to plan around. Heavy clay can stick to the reamer, so we stage the reaming and watch fluid returns.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Paige bores at a glance

  • Unincorporated community in Bastrop County, Texas. Population 278 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 406 miles, about 8 hours of driving.
  • Ground: Behring soil is mapped on 60 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 19 percent of the area.
  • Highways inside the boundary: US 290 and FM 2104. State permit office: TxDOT Austin District.
  • Railroad track inside the boundary: Austin Western Railroad, with 3 mapped street and rail crossings.
  • Named streams inside the boundary: Bluff Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for boring near Austin Western Railroad in Paige?

At about five feet, the USDA soil survey maps Behring clay loam above clay at 40 inches in Paige. The 2020 Census count is 278; the Census Bureau does not publish yearly estimates for unincorporated places. In Bastrop County, we can route water, sewer, gas, electric conduit or fiber along Main Street, Old Pin Oak Road or FM 2104, with the line type and crossings shaping the bore plan.

Our main office is in Yukon, Oklahoma, and Paige work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965 and has done directional boring since 1982. Our record of no utility strikes in over 25 years matters around lines reported by Oncor Electric Delivery Company and the other electric providers serving Bastrop County.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What does the USDA soil survey show for Behring soil in Paige?

Behring soil is mapped across 60% of Paige, and Behring clay loam, 1 to 3 percent slopes, covers 47%. The USDA soil survey maps clay loam as the surface texture across 70% of the community. At about 40 inches, clay is mapped under 93% of the area, with an average clay content of 46%. These are mapped soil patterns, not test borings. For a bore near Rail Road Track Road, the heavy clay can cling to the reamer and swell against pipe, so the ground conditions affect both the reaming sequence and the pullback timing.

USDA soil survey, inside the Paige mapped community boundaryWhat is mapped
Soil series mappedBehring 60 percent, Crockett 20 percent, Wilson 7 percent and Edge 4 percent
Texture at the surfaceclay loam 70 percent, fine sandy loam 13 percent and gravelly fine sandy loam 9 percent
Texture about 40 inches downclay 93 percent, sandy clay loam 4 percent and clay loam 3 percent
Engineering class about 40 inches downfat clay (CH) 89 percent and lean clay (CL) 10 percent
Average clay content about 40 inches down46 percent
Bedrock mapped within 60 inches19 percent of the area (0 percent hard rock, 19 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils4 percent of the area
High corrosion risk for uncoated steel93 percent of the area

The USDA soil survey maps weathered bedrock within 60 inches across 19% of Paige; hard bedrock is not mapped in that depth range. Seasonal water table is not mapped within 60 inches, while flood prone soils cover 4%. High steel corrosion risk is mapped across 93%, a concern for uncoated casing or tracer wire that the line owner should address. The Cook Mountain Formation, of Bartonian age, includes claystone, sandstone and siltstone. Weathered rock can slow the bore, while Bluff Creek calls for a crossing depth planned beneath the channel.

How do we bore Paige’s clay ground?

Behring clay loam and clay mapped at 40 inches call for controlled fluid and staged reaming. At Rail Road Track Road or a crossing near Bluff Creek, we match the bore plan to the ground and the marked lines.

  1. In Behring clay, we use thinner drilling fluid and ream in stages so sticky cuttings do not build up on the reamer.
  2. Because heavy clay is mapped at 40 inches across 93% of Paige, we watch fluid returns to reduce the chance of pressure lifting pavement.
  3. Before drilling near lines along Main Street, we hydrovac pothole every marked utility; paint shows its position but not its depth.
  4. Where the Cook Mountain Formation includes weathered rock, we use a hard soil bit and advance more slowly while tracking depth and pitch.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

What is in the way of a new line near Bluff Creek in Paige?

US 290 runs 1.5 mapped roadway miles inside Paige, and FM 2104 runs 1.3. Both are state highways, so a bore in their right of way needs TxDOT review. Main Street has 0.72 miles inside the community, Old Pin Oak Road has 0.74, and Rail Road Track Road has 1.16. Those local roads can bring pavement, driveways and buried lines into the bore path. The mapped community has 22.05 public road centerline miles, so a route may involve more than one street crossing.

CrossingTypeMapped extentWho has a say
US 290US highway1.5 roadway miles insideState highway office
FM 2104State highway1.3 roadway miles insideState highway office
Austin Western RailroadRailroad1.87 track miles insideThe railroad
Bluff CreekStream0.12 channel miles insideChecked for Corps of Engineers jurisdiction
Long BranchStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Turner CreekStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Pin Oak CreekStream nearby0.8 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Austin Western Railroad has 1.87 track miles inside Paige, and public records map three street and rail crossings. A bore under its track needs an agreement with the railroad. Bluff Creek runs 0.12 channel miles inside the community, with one mapped street crossing of a named stream. Long Branch runs along or touches the mapped boundary. A creek bore needs a planned depth beneath the channel, and its jurisdiction is checked during planning.

Whose permission does a Paige bore in Bastrop County need?

Paige has no city government, so local public streets fall to Bastrop County, while US 290 and FM 2104 fall under TxDOT. TxDOT Austin District reviews utility permits for work in state right of way. The utility owner files through RULIS, and we prepare the bore plan and profile for the filing. Electric and communication lines crossing US 290 need at least 60 inches of cover below the lowest crossed grade unless the district sets another depth. TxDOT requires boring or tunneling under existing highway pavement. A crossing of Austin Western Railroad needs its agreement, and Bluff Creek is checked for federal jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What lines are already in the ground in Bastrop County near Paige?

For a Paige address, confirm the water provider with Bastrop County or the local water district before planning a bore; the provider has to be checked for the specific property. Oncor Electric Delivery Company, Bluebonnet Electric Cooperative and Fayette Electric Cooperative report electric service in Bastrop County, but the line owner must be confirmed before a conduit bore. We pothole marked lines before drilling near them, including water and electric lines along Main Street.

Line ownerWhat it isSourceSize
Oncor Electric Delivery Company, Bluebonnet Electric Cooperative and Fayette Electric CooperativeElectric utilities reporting service in Bastrop CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Housing figures are not published reliably for a place as small as Paige, so a route along FM 2104 may serve a long run between properties or connect lines along existing roads. Bastrop County averages 37.6 inches of precipitation a year, with May averaging 4.6 inches and July 2.0 inches. Before a bore near Old Pin Oak Road, we expose marked utilities by hydrovac; locate paint shows position, not depth.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

Where is Paige in relation to Camp Swift?

Paige is an unincorporated community in Bastrop County, Texas, with an elevation of 537 feet and a mapped land area of 2.15 square miles. Its ZIP code is 78659. Camp Swift is 10.1 miles west and is the nearest larger city; Bastrop, the county seat, is 13.5 miles southwest. Circle D-KC Estates is 7.7 miles southwest, McDade is 8.8 miles northwest, and Giddings is 12.0 miles east. From our Yukon, Oklahoma main office, Paige is 406 road miles and an 8.0 hour drive.

Places near Paige

What boring work comes up along Rail Road Track Road in Paige?

  • Highway crossing: A utility bore beneath US 290 stays under the travel lanes, with TxDOT cover and right of way conditions shaping the profile.
  • Rail crossing: Austin Western Railroad has 1.87 track miles in Paige, so a crossing plan must follow the railroad agreement.
  • Creek crossing: A bore beneath Bluff Creek needs a planned path under the channel and a jurisdiction check during planning.
  • Water service: A service near Old Pin Oak Road needs the address specific water provider confirmed before the bore is planned.
  • Fiber route: Fiber along Rail Road Track Road can be bored beneath driveways and pavement without cutting the surface.
  • Electric conduit: Along FM 2104, we confirm the line owner and expose marked utilities before drilling near them.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a bore near Main Street in Paige?

For a Paige quote, send the address or map pin, what will go underground, the pipe or conduit size, footage, and any sketch or plans. A Main Street route or a crossing at FM 2104 helps us identify pavement and marked utilities before sizing the work.

In Paige, footage through Behring clay is an early cost factor because sticky ground can take staged reaming. Pipe or conduit size, soil and rock conditions, and the number of utilities that need exposure also shape the work. A crossing of US 290, Austin Western Railroad or Bluff Creek adds site and crossing requirements. Pavement, pits, excavator time and sand backfill affect the scope too. Mobilization matters because Paige is 406 road miles from Yukon, and urgent or high profile work can change the plan.

Questions people ask about boring in Paige

Does Trinity Boring Solutions take directional boring jobs in Paige, Bastrop County?

Yes. We take directional boring work in Paige and across Texas, with our own crews and satellite yards run by partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, whether the route follows Main Street or crosses another local road.

Is there rock under Paige, and how much is mapped in the top five feet?

The USDA soil survey maps weathered bedrock within 60 inches across 19% of Paige, with hard bedrock not mapped in that range. The Cook Mountain Formation includes siltstone and sandstone. Those mapped conditions do not rule out rock at greater depth, so the bore plan still depends on the actual route.

Who approves a bore under US 290 in Paige, and which TxDOT office reviews it?

TxDOT Austin District reviews a utility permit for work in the US 290 right of way. The utility that owns the line submits the application through RULIS, while we supply the bore plan and profile. TxDOT sets required cover and can require a different depth in the permit.

What does a Paige bore under Austin Western Railroad require?

A crossing under Austin Western Railroad needs an agreement with the railroad that owns the track. The agreement sets casing, depth and flagging. With 1.87 track miles inside Paige and three mapped street and rail crossings, the planned route and access points matter.

Can a line be bored under Bluff Creek in Paige?

A bore can be planned beneath Bluff Creek, but the route must stay under the channel and be checked for U.S. Army Corps of Engineers jurisdiction during planning. The creek has 0.12 channel miles inside Paige, so the crossing location and bank access affect the design.

Which company owns Paige electric lines in Bastrop County, and who confirms conduit specs?

Oncor Electric Delivery Company, Bluebonnet Electric Cooperative and Fayette Electric Cooperative report service in Bastrop County, but no one provider should be assumed for every Paige address. Confirm the line owner and conduit specifications for the specific route, then expose marked lines before a bore near FM 2104.

Can I reach Trinity after hours for an urgent bore near Old Pin Oak Road in Paige?

Yes. A person answers the Trinity phone 24 hours a day at (405) 409-7423, including after hours for urgent work near Old Pin Oak Road. Emergency scope can affect the plan, so be ready to describe the address, what needs to go underground and any nearby crossings.

How much notice does Texas811 need for a Paige bore near Rail Road Track Road?

Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If the start slips more than 14 days, make a new request. Marks worn off or moved near Rail Road Track Road must be refreshed before work continues.

What affects the cost of directional boring near US 290 in Paige?

The job scope drives the cost: footage, pipe or conduit size, Behring clay, exposed utility crossings, pavement, pits and backfill all matter. A US 290 crossing brings TxDOT requirements into the plan, and Paige is 406 road miles from Yukon, which affects mobilization. High profile or urgent work can also change the scope.

Where the Paige facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Paige

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Paige, Texas

Type the address of your job in Paige. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Paige

Same county: Elgin · Smithville · Wyldwood · Cedar Creek · Red Rock · Rosanky. All counties: Texas county list.