McDade Texas Directional Boring: Edge Soil, US 290 And West Yegua Creek
Quick Answer: Brown Road, Marlin Street and McAcres Drive lead the named streets; 28.63 public road miles and the Austin Western Railroad run inside McDade. Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Texas for routes crossing US 290. Our Yukon, Oklahoma main office is 399 road miles away, and West Yegua Creek adds a route constraint. USDA maps Edge soil over 34% of McDade; clay can cling to tooling, so staged reaming helps control the bore.
McDade bores at a glance
- Unincorporated community in Bastrop County, Texas. Population 720 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 399 miles, about 8 hours of driving.
- Ground: Edge soil is mapped on 34 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 16 percent of the area.
- Highways inside the boundary: US 290 and FM 2336. State permit office: TxDOT Austin District.
- Railroad track inside the boundary: Austin Western Railroad, with 8 mapped street and rail crossings.
- Named streams inside the boundary: West Yegua Creek, Mc Laughlin Creek and McLaughlin Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near McDade and Austin Western Railroad?
McDade is an unincorporated community in Bastrop County, where the Census Bureau counted 720 residents in the 2020 Census. We take directional boring work for water, sewer, gas, electric conduit and fiber, routing lines along streets such as Marlin Street or toward properties beside FM 2336. The Austin Western Railroad is another crossing to account for when laying out a route.
Our main office is in Yukon, Oklahoma, and McDade work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, four decades of boring have taught our family business, started in 1965, to account for McDade’s mapped mix of fine sandy loam and clay when selecting tooling and fluid. That ground matters near West Yegua Creek as well as along town streets.

What does McDade’s Edge soil mean for a bore?
The USDA soil survey maps Edge soil across 34% of McDade, with Tabor at 17%, Crockett at 16% and Robco at 15%. Fine sandy loam is the surface texture across 70% of the mapped area, but conditions change below it. At about 40 inches, the survey maps clay in 34% of the area and clay loam in another 34%, with sandy clay loam in 22%. The average clay content at that depth is 35%, and 67% of the area is mapped as heavy clay. Sticky clay can load a reamer and grip pipe.
| USDA soil survey, inside the McDade mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Edge 34 percent, Tabor 17 percent, Crockett 16 percent, Robco 15 percent and Silstid 6 percent |
| Texture at the surface | fine sandy loam 70 percent, loamy fine sand 23 percent and fine sand 6 percent |
| Texture about 40 inches down | clay 34 percent, clay loam 34 percent and sandy clay loam 22 percent |
| Engineering class about 40 inches down | lean clay (CL) 51 percent, fat clay (CH) 33 percent and silty sand (SM) 9 percent |
| Average clay content about 40 inches down | 35 percent |
| Bedrock mapped within 60 inches | 16 percent of the area (0 percent hard rock, 16 percent weathered rock) |
| Seasonal water table within 60 inches | 33 percent of the area |
| Flood prone soils | 4 percent of the area |
| High corrosion risk for uncoated steel | 49 percent of the area |
The USDA soil survey maps weathered bedrock within 60 inches in 16% of the area, with typical bedrock depth at 53 inches; hard bedrock is not mapped in that zone. Seasonal water tables are mapped within 60 inches in 33% of the area, so McDade bore pits may need pumping. Flood prone soils cover 4%, and high steel corrosion risk is mapped in 49%, a reason to discuss casing and tracer wire materials with the line owner. The Calvert Bluff Formation, of Paleogene age, is mostly mudstone with sandstone and lignite, so slower ground may appear along a route.
What does it take to bore McDade’s clay soils safely?
McDade’s mix of Edge soil, clay and fine sandy loam calls for a plan that changes with the ground. We set the bore path around the mapped conditions and what potholes show beside the route.
- Where McDade’s heavy clay is mapped, we use a fluid mix suited to sticky ground, ream in stages and prepare the pipe so it can be pulled promptly.
- Fine sandy loam covers 70% of the surface area, but sandy ground can cave behind the bit, so staged reaming and steady wall support help keep the hole open.
- Seasonal water tables are mapped within 60 inches in 33% of McDade, so we keep pits near the route small and pump them if water collects.
- Before drilling near Brown Road or McAcres Drive, we hydrovac expose marked lines, then track the drill head from the surface and log depth and pitch.

What could a new line cross in McDade near US 290?
US 290 has 2.6 mapped roadway miles inside the McDade community boundary, and FM 2336 has 1.9. The public road network totals 28.63 miles. Brown Road is the longest named street at 1.47 miles, followed by Marlin Street at 1.35 miles and McAcres Drive at 1.01 miles. A bore can pass beneath pavement rather than cut across it, but the alignment, cover and work area have to account for these roads and any utilities along the path.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 290 | US highway | 2.6 roadway miles inside | State highway office |
| FM 2336 | State highway | 1.9 roadway miles inside | State highway office |
| Austin Western Railroad | Railroad | 2.93 track miles inside | The railroad |
| West Yegua Creek | Stream | 1.52 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Mc Laughlin Creek | Stream | 1.24 channel miles inside | Checked for Corps of Engineers jurisdiction |
| McLaughlin Creek | Stream | 0.34 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Piney Creek | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
The Austin Western Railroad has 2.93 track miles inside the community, and public mapping identifies 8 street and rail crossings. West Yegua Creek runs for 1.52 channel miles here, while Mc Laughlin Creek and McLaughlin Creek are also mapped. Four street crossings of named streams appear in the community. Creek work needs its route and depth considered carefully, and a water crossing is checked for federal jurisdiction during planning.
Who approves utility bores in McDade, Bastrop County?
McDade has no city government, so street authority rests with Bastrop County or the state, depending on the road. Work in the US 290 or FM 2336 right of way needs a TxDOT utility permit reviewed by the Austin District. The utility that owns the line files through TxDOT’s RULIS system; we prepare the bore plan and profile and work under that permit. TxDOT cover rules set 60 inches below the lowest crossed grade for electric, communication, water and pressurized sewer crossings, though the district may set another depth. A highway crossing is bored or tunneled, and a railroad crossing needs an agreement with Austin Western Railroad. Planning a West Yegua Creek crossing includes checking for U.S. Army Corps of Engineers jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What utility lines should we check in McDade, Bastrop County?
The water provider for a specific McDade address has to be confirmed with Bastrop County or the local water district before a bore is planned. EPA drinking water records for Texas do not tie systems to towns, so the provider cannot be matched from town records. Oncor Electric Delivery Company, Bluebonnet Electric Cooperative and Fayette Electric Cooperative report service in Bastrop County; the owner of the particular electric line must be identified before we plan a conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Oncor Electric Delivery Company, Bluebonnet Electric Cooperative and Fayette Electric Cooperative | Electric utilities reporting service in Bastrop County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put McDade’s median housing year at 1978; 17% of housing was built before 1960, while 19% dates from 2000 or later. Those figures do not date any buried pipe, but an older service along Marlin Street may call for a replacement bore rather than a new service route. We use hydrovac potholes to expose marked utilities before drilling near them, since paint shows a line’s position, not its depth.

How far does Trinity cover from McDade to Camp Swift?
McDade is an unincorporated community in Bastrop County, at an elevation of 501 feet and with a mapped area of 4.09 square miles. Its ZIP code is 78650. Camp Swift is 6.7 miles south; Circle D-KC Estates is 8.2 miles south, Paige is 8.8 miles southeast and Elgin is 9.8 miles northwest. Bastrop, the county seat, is 12.2 miles south. Our Yukon, Oklahoma main office is 399 road miles away, an 8.0 hour drive, which is part of planning equipment and crew mobilization for McDade work.
Places near McDade
- Directional boring in Camp Swift: 6.7 miles south
- Directional boring in Circle D-KC Estates: 8.2 miles south
- Directional boring in Paige: 8.8 miles southeast
- Directional boring in Elgin: 9.8 miles northwest
- Directional boring in Bastrop: 12.2 miles south
Which jobs call for a bore near McDade’s McAcres Drive?
- Highway crossing: A new service beneath US 290 needs a bore plan that fits the highway right of way and the required cover.
- Water service: A route near Brown Road can avoid an open cut across pavement, with the address provider confirmed before planning the line.
- Fiber conduit: A conduit route along McAcres Drive needs marked utilities exposed before the drill approaches them.
- Creek crossing: A line beneath West Yegua Creek needs a planned depth and a check for federal jurisdiction during planning.
- Rail crossing: A proposed bore under the Austin Western Railroad needs an agreement with the railroad that owns the track.
- Replacement service: Older housing along Marlin Street may call for a replacement bore, with hydrovac potholes used to locate buried lines.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a bore near McDade’s Brown Road?
For a quote, send the address or map pin, what will go underground, the pipe or conduit size and the footage; a sketch or plans help us read the route near Brown Road. Mention whether the route approaches US 290, the railroad or West Yegua Creek, since each changes the crossing plan and work area.
The job scope sets the price through three groups of details. Ground conditions such as McDade’s heavy clay and possible weathered bedrock affect tooling and time. Crossings matter too: US 290, Austin Western Railroad and West Yegua Creek each bring different planning needs, and marked utilities may need exposure. Logistics include pits, excavator time, sand backfill and the 399 road miles from Yukon. Concrete, pavement, route length, line size and emergency timing also shape the work.
Questions people ask about boring in McDade
Does Trinity take directional boring work in McDade, Bastrop County, and who staffs it?
Yes. We take directional boring work in Texas, including projects in McDade, and Trinity stays responsible for the job from the first call through its bore log. Our own crews and vetted drilling partners staff the work, so a project near Marlin Street has one Trinity contact even when a partner crew is on site.
Who owns the McDade track at Austin Western Railroad, and what does a bore need?
Austin Western Railroad owns the track mapped through McDade, with 2.93 track miles inside the community. A crossing needs an agreement with that railroad; the agreement sets casing, depth and flagging. If the route also occupies US 290 right of way, TxDOT requests a copy of the railroad agreement.
Can a line be bored under West Yegua Creek in McDade?
A bore may be planned beneath West Yegua Creek, which has 1.52 channel miles in McDade, but the route and depth need to be evaluated for the crossing. Creek work is checked for U.S. Army Corps of Engineers jurisdiction during planning. The mapped street crossings of named streams also make route selection important.
Which electric companies report service in McDade, Bastrop County, and who confirms conduit details?
Oncor Electric Delivery Company, Bluebonnet Electric Cooperative and Fayette Electric Cooperative report service in Bastrop County. That does not identify the owner at every McDade address, so we confirm the specific line owner before planning a conduit bore. The owner can also confirm the conduit requirements for its line.
Who controls McDade streets such as McAcres Drive, and must a bore cut the road?
McDade has no city government, so responsibility for a street depends on whether it is under county or state authority. A directional bore can pass beneath McAcres Drive without cutting its paved surface. If the work is in the US 290 right of way, the applicable TxDOT utility permit is needed.
How old are McDade homes and buried lines near Marlin Street?
McDade’s median housing year is 1978 in the American Community Survey 2019 to 2023 five year estimates, but housing age does not establish the age of a buried line. For replacement work near Marlin Street, we expose marked utilities with hydrovac potholes before drilling so the bore can be planned around what is actually underground.
Does Trinity cover Camp Swift and rural sites outside McDade?
Yes. We take work across Texas, so Camp Swift and rural sites beyond McDade can be considered for service. Camp Swift is 6.7 miles south of McDade, and the Yukon office is 399 road miles away; the route, job scope and mobilization needs help determine how the work is staffed.
How much notice does Texas811 need for a McDade bore near Brown Road?
For a bore near Brown Road, make the Texas811 locate request at least two working days before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start slips more than 14 days past the original notice, make a new request. Marks that wear off or move must be refreshed through Texas811 before work continues.
What affects the cost of a directional bore in McDade under US 290?
The scope drives the price, not just the length. Under US 290, the crossing plan and pavement matter; McDade’s heavy clay, possible weathered bedrock and any utilities needing exposure affect the ground work. Pipe size, route length, creek or railroad crossings, pits, equipment time, urgency and mobilization from Yukon also shape the estimate.
Where the McDade facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside McDade
- U.S. Census Bureau, TIGER/Line 2024: McDade boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: McDade population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: McDade housing units and year built
- Macrostrat geologic map compilation: map units under McDade
- U.S. Department of Transportation, North American Rail Network: track owners in Bastrop County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Bastrop County
- U.S. Geological Survey, Elevation Point Query Service: McDade elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to McDade
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in McDade
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in McDade, Texas
Type the address of your job in McDade. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for McDade
Same county: Smithville · Wyldwood · Cedar Creek · Red Rock · Rosanky. All counties: Texas county list.
