Celina Texas Directional Boring: Houston Black Clay, FM 455 And Doe Branch
Quick Answer: The City of Celina owns the water system, while Oncor Electric Delivery Company and other utilities report service in the area; we confirm line ownership before conduit work and take directional boring, also called horizontal directional drilling (HDD), jobs beneath FM 455 in Celina. Our Yukon main office is 193 road miles from County Line Road, a distance we consider when planning mobilization. Houston Black clay is common in Celina; sticky ground can cling to the reamer and pipe, so we stage the passes and prepare the pull.
Celina bores at a glance
- Incorporated city in Collin County and Denton County, Texas. Population 51,661 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 193 miles, about 3.9 hours of driving.
- Ground: Houston Black soil is mapped on 42 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 23 percent of the area.
- Highways inside the boundary: FM 455, Texas State Highway 289, FM 428, Texas State Highway 289 Business and FM 2478. State permit office: TxDOT Dallas District.
- Railroad track inside the boundary: BNSF Railway, with 11 mapped street and rail crossings.
- Named streams inside the boundary: Doe Branch, Little Elm Creek, Wilson Creek and Long Branch.
- Public water: City of Celina, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Doe Branch in Celina?
The City of Celina owns its public water system, and electric utilities reporting service in the counties include Oncor Electric Delivery Company, Texas-New Mexico Power, Denton County Electric Cooperative, Fannin County Electric Cooperative, Farmers Electric Cooperative and Grayson-Collin Electric Cooperative. We verify the line owner before planning a conduit bore near Doe Branch. The Census Bureau Vintage 2024 estimate puts Celina at 51,661 people across Collin and Denton counties. We install water, sewer, gas, electric conduit and fiber lines along routes such as FM 455 and Louisiana Drive.
Our main office is in Yukon, Oklahoma, and Celina work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A 3/4 inch service line near Louisiana Drive and a 48 inch casing for a crossing bracket our 10 feet to 5,000 feet bore range. Our family business started in 1965 and has done directional boring since 1982, experience we bring to Celina work without changing who you deal with from call to bore log.

What kind of ground does Celina’s Houston Black soil bring to a bore?
The USDA soil survey maps the Houston Black soil series across 42 percent of Celina. Surface texture is clay across 81 percent of the city, and at about 40 inches below the surface, clay is mapped across 79 percent. The average clay content at that depth is 53 percent, and 87 percent of the area is mapped as heavy clay. For Celina, we treat mapped soil patterns as planning guidance, not as test borings. Along routes near FM 455, that sticky ground can build up on the reamer and grip pipe, so the bore plan needs staged reaming and a well timed pull.
| USDA soil survey, inside the Celina city limits | What is mapped |
|---|---|
| Soil series mapped | Houston Black 42 percent, Heiden 14 percent, Vertel 8 percent, Burleson 7 percent and Austin 7 percent |
| Texture at the surface | clay 81 percent, silty clay 10 percent and clay loam 5 percent |
| Texture about 40 inches down | clay 79 percent and bedrock 20 percent |
| Engineering class about 40 inches down | fat clay (CH) 87 percent |
| Average clay content about 40 inches down | 53 percent |
| Bedrock mapped within 60 inches | 23 percent of the area (0 percent hard rock, 23 percent weathered rock) |
| Seasonal water table within 60 inches | 1 percent of the area |
| Flood prone soils | 7 percent of the area |
| High corrosion risk for uncoated steel | 97 percent of the area |
The USDA soil survey maps bedrock within 60 inches across 23 percent of Celina and within 40 inches across 20 percent; the mapped bedrock is weathered, not hard. Contact between clay and rock can push a drill head off line, and slower drilling may be needed. Seasonal water table is mapped within 60 inches across 1 percent, while flood prone soils cover 7 percent, a concern to assess near Doe Branch. The Eagle Ford Formation, of Turonian age, includes shale, siltstone and limestone. In Celina, high steel corrosion risk is mapped across 97 percent, so we consider casing and tracer wire materials.
How do we drill Celina’s clay along FM 455?
Houston Black clay dominates the mapped ground in Celina. We adjust drilling fluid and reaming to the sticky soil, then track the head and record its depth and pitch as the bore advances.
- In Houston Black clay, we use a thinner drilling fluid with polymer and ream in stages so sticky soil is less likely to load the reamer.
- Because Celina maps heavy clay across 87 percent of the area at about 40 inches, we watch returns and manage pressure near pavement to avoid lifting it.
- With weathered bedrock mapped within 60 inches across 23 percent of Celina, we slow down at soil to rock contact and keep checking the drill head’s line.
- Near Doe Branch, we plan depth below the channel and consider flood prone soil; marked utilities along the route are exposed before the drill gets close.

Where might a Celina line have to go under FM 455?
FM 455 has 20.5 mapped roadway miles inside Celina, and Texas State Highway 289 has 11.3. FM 428, Texas State Highway 289 Business, FM 2478, FM 1385 and FM 1461 are also within the city limits. County Line Road is the longest named street at 6.7 miles, followed by Marilee Road at 6.22 and Preston Road at 6.2. Louisiana Drive accounts for 3.31 miles. These corridors can put a bore alongside pavement or require a crossing, so the route and entry pits need to be planned around the actual location.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 455 | State highway | 20.5 roadway miles inside | State highway office |
| Texas State Highway 289 | State highway | 11.3 roadway miles inside | State highway office |
| FM 428 | State highway | 7.7 roadway miles inside | State highway office |
| Texas State Highway 289 Business | State highway | 5.9 roadway miles inside | State highway office |
| FM 2478 | State highway | 5.1 roadway miles inside | State highway office |
| FM 1385 | State highway | 2.5 roadway miles inside | State highway office |
| FM 1461 | State highway | 1.3 roadway miles inside | State highway office |
| BNSF Railway | Railroad | 6.53 track miles inside | The railroad |
| Doe Branch | Stream | 10.24 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Little Elm Creek | Stream | 8.55 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Wilson Creek | Stream | 4.15 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Long Branch | Stream | 4.97 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Clarks Branch | Stream | 3.34 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Walnut Creek | Stream | 0.98 channel miles inside | Checked for Corps of Engineers jurisdiction |
BNSF Railway has 6.53 track miles inside Celina, on the Madill Subdivision; public mapping records 11 street and rail crossings in the city. Doe Branch runs 10.24 channel miles, and Little Elm Creek runs 8.55. Wilson Creek, Long Branch and Clarks Branch are also mapped locally. Public records show 39 street crossings of named streams. Those stream and track intersections call for route checks and careful pit placement; no lakes or ponds are mapped within one mile.
Who has to sign off on a Celina bore under BNSF Railway?
FM 455 and the other farm to market roads in Celina are state highways, so work in their right of way needs a TxDOT utility permit reviewed by the TxDOT Dallas District. The utility that owns the line files through TxDOT’s RULIS system; we prepare the bore plan and profile and work under the owner’s permit. TxDOT requires boring or tunneling beneath existing highway pavement, with crossings encased. A bore under BNSF Railway needs an agreement with the railroad, which sets crossing conditions. Doe Branch crossings are checked during planning for U.S. Army Corps of Engineers jurisdiction. Because Celina is incorporated, we plan city street bores with the city as the street authority.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried near the City of Celina water system?
The City of Celina public water system uses purchased surface water and reports 17,567 service connections serving 52,701 people. That makes water line ownership and the proposed tie in important checks for work near Louisiana Drive or FM 455. Electric utilities reporting service in the counties include Oncor Electric Delivery Company, Texas-New Mexico Power, Denton County Electric Cooperative, Fannin County Electric Cooperative, Farmers Electric Cooperative and Grayson-Collin Electric Cooperative. We confirm which provider owns the line at the specific location before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Celina | Public water system | Surface water bought from another system | 17,567 connections, 52,701 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, Denton County Electric Cooperative, Fannin County Electric Cooperative, Farmers Electric Cooperative and Grayson-Collin Electric Cooperative | Electric utilities reporting service in Collin County and Denton County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Celina’s median housing year at 2012; 6 percent of homes were built before 1960, 18 percent from 1960 to 1999 and 76 percent in 2000 or later. That mix can mean replacement work on older lines as well as new service routes along Preston Road. Before the drill nears any marked utility, we expose it with hydrovac potholing because paint shows position, not depth. A proposed crossing beneath Louisiana Drive still needs its marked lines exposed first.

How far is Celina from Gunter and our Yukon office?
Celina covers 48.33 square miles in Collin and Denton counties, with an elevation of 679 feet. For address checks in Celina, we use ZIP codes 75009, 75078 and 76227 to identify the service area. Prosper lies 5.7 miles south, while Gunter is 6.6 miles north; Weston is 7.7 miles east. McKinney, the nearest larger city and the Collin County seat, is 11.5 miles southeast. Our Yukon, Oklahoma yard is 193 road miles away, a 3.9 hour drive, so travel distance is part of planning a bore near County Line Road or Doe Branch.
Places near Celina
- Directional boring in Prosper: 5.7 miles south
- Directional boring in Gunter: 6.6 miles north
- Weston: 7.7 miles east
- Savannah: 9.2 miles southwest
- Directional boring in Pilot Point: 10.4 miles northwest
- Directional boring in McKinney: 11.5 miles southeast
Which jobs call for a bore near County Line Road in Celina?
- Highway crossing: A bore beneath FM 455 can keep a proposed water or conduit line below the roadway instead of cutting across its pavement.
- Water service: A new connection near the City of Celina system needs its route checked against existing lines and service connections.
- Fiber drop: A fiber route along Preston Road can pass beneath driveways and sidewalks without opening a trench through each surface.
- Creek crossing: A line beneath Doe Branch needs a planned profile below the channel and a check for federal jurisdiction during planning.
- Rail crossing: A proposed line beneath BNSF Railway needs an agreement with the railroad before the crossing plan is set.
- Street service: For a proposed line under Louisiana Drive, we hydrovac expose each marked utility before drilling near it.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Celina bore near Louisiana Drive?
A map pin matters because a route near Louisiana Drive has different crossings and access than one beside Doe Branch. To scope a Celina bore, send us the address or pin, what will go in the ground, pipe or conduit size, and footage. A sketch or plans help us see the route, entry and exit pits, and any pavement or drainage conflicts before we scope the work.
We price the actual work, not one detail by itself. Houston Black clay affects drilling and reaming; a crossing of FM 455 or BNSF Railway adds crossing and permit coordination. Length, pipe or conduit size, other utilities to expose, pavement, creek or drainage crossings, pits, excavator time and sand backfill all affect the scope. Mobilization planning for Celina includes the 193 road miles from Yukon, which can shape travel timing and logistics. For high profile or emergency work in Celina, we allow added planning time for coordination and site demands.
Questions people ask about boring in Celina
Does Trinity take Celina jobs in Collin County, and who staffs them?
Yes. Trinity takes directional boring work in Celina, with our own crews and vetted drilling partners working from satellite yards rather than a local office. You coordinate with Trinity from the first call through the bore log, whichever crew is on site. That arrangement applies to work in Collin County and the city’s Denton County area as well.
What is a Celina bore like through Houston Black soil?
The USDA soil survey maps Houston Black soil across 42 percent of Celina, with clay mapped across 79 percent at about 40 inches below the surface. That heavy, sticky material can build on a reamer and grip pipe. We stage reaming and plan to pull the pipe the same day the hole is opened.
How much bedrock is mapped within five feet of Celina?
The USDA soil survey maps bedrock within 60 inches across 23 percent of Celina and within 40 inches across 20 percent. The mapped material is weathered rather than hard bedrock, but a soil to rock transition can steer the drill head off line. The Eagle Ford Formation includes shale, siltstone and limestone.
Who approves a Celina bore under FM 455?
FM 455 is a state highway, so its right of way needs a TxDOT utility permit reviewed by the TxDOT Dallas District. The utility owner submits the application in TxDOT’s RULIS system, while we prepare the bore plan and profile. Beneath existing highway pavement, TxDOT requires boring or tunneling rather than an open cut.
What does a Celina bore beneath BNSF Railway require, and how do we plan around its crossing conditions?
A crossing beneath BNSF Railway needs an agreement from the railroad before the work can proceed. For BNSF Railway crossings in Celina, we use the agreement to plan casing, depth and flagging conditions. The railroad has 6.53 track miles within Celina, so the proposed route needs to be checked against the actual track location.
Can a line be bored beneath Doe Branch in Celina?
A line can be planned to pass beneath Doe Branch, but its channel and crossing conditions must shape the bore profile. Doe Branch runs 10.24 channel miles within Celina. During planning, the creek crossing is checked for U.S. Army Corps of Engineers jurisdiction, and the bore depth is planned below the channel.
Can I reach Trinity after hours about an urgent bore near Preston Road in Celina?
Yes. A person answers Trinity’s phone at (405) 409-7423 24 hours a day, and the company provides 24 hour emergency response. If the urgent work is near Preston Road, have the location and the line or crossing involved ready so we can understand the immediate scope.
How early should I call Texas811 for a Celina bore along County Line Road?
Request a Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. Describe the bore path along County Line Road. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.
What affects the cost of a directional bore under FM 455 in Celina?
The job scope sets the price: bore length and line size, Houston Black clay, pavement, utilities to expose, pits, equipment time and backfill all matter. A crossing beneath FM 455 brings state highway permit requirements into the plan. Creek or drainage crossings and mobilization from the Yukon yard also affect the work.
Where the Celina facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Celina
- U.S. Census Bureau, TIGER/Line 2024: Celina boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Celina
- U.S. Census Bureau, American Community Survey 2019 to 2023: Celina housing units and year built
- Macrostrat geologic map compilation: map units under Celina
- U.S. EPA Safe Drinking Water Information System: public water systems serving Celina
- U.S. Department of Transportation, North American Rail Network: track owners in Collin County and Denton County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Collin County and Denton County
- U.S. Geological Survey, Elevation Point Query Service: Celina elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Celina
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Celina
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Celina, Texas
Type the address of your job in Celina. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
