trinityboringsolutions.com

Grapevine Texas Directional Boring: Houston Black, Interstate 635 And Big Bear Creek

Quick Answer: Grapevine is an incorporated city in Tarrant County, so Airfield Drive and other city streets are city streets. Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for lines routed beneath Big Bear Creek and local pavement. Our Yukon main office is 204 road miles away, and the Fort Worth and Western Railroad is one local crossing to plan around. Houston Black soil contributes to the mapped clay share, which can cling to a reamer and call for staged passes.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Grapevine bores at a glance

  • Incorporated city in Tarrant County, Texas. Population 51,320 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 204 miles, about 4.1 hours of driving.
  • Ground: Houston Black soil is mapped on 12 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 18 percent of the area.
  • Highways inside the boundary: Interstate 635, Texas State Highway 121, Texas State Highway 114, Texas State Highway 26 and Spur 97. State permit office: TxDOT Fort Worth District.
  • Railroad track inside the boundary: Fort Worth and Western Railroad and a short line railroad (reporting mark TEXR), with 31 mapped street and rail crossings.
  • Named streams inside the boundary: Big Bear Creek, Denton Creek, Cottonwood Branch and Farris Branch.
  • Public water: City of Grapevine, surface water.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring in Grapevine near the Fort Worth and Western Railroad?

Trinity Boring Solutions handles directional boring in Grapevine, an incorporated city in Tarrant County where city streets such as Access Road are city owned. The Census Bureau Vintage 2024 estimate puts Grapevine at 51,320, a population figure we keep in view when planning underground work. We install water, sewer, gas, electric conduit and fiber beneath Grapevine streets and Texas State Highway 121 when a route needs to avoid pavement.

Our main office is in Yukon, Oklahoma, and Grapevine work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For Ira E Woods Avenue service work, our range runs from 3/4 inch service lines to 48 inch casing, with bores from 10 feet to 5,000 feet. That can cover a short service line or a long utility crossing; our family business began in 1965 and has done directional boring since 1982.

Aerial view of a bore pit with drill rig and conduit alongside a directional drill rig and conduit on a concrete lot
Our crew at a bore pit beside the directional drill on a conduit job, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What is Grapevine ground like to bore in around Houston Black soil?

Houston Black soil is one part of Grapevine’s mapped ground, and the USDA soil survey identifies it across 12% of the city. At about 40 inches below the surface, clay makes up 41% of mapped texture, while sandy clay loam accounts for 18% and sandy clay 7%. At the surface, clay covers 24% of the mapped area. Grapevine soil survey patterns are not test borings, so we plan underground work without treating them as boring logs. The clay can stick to a reamer and grip pipe, so a bore plan needs to account for staged reaming and the timing of the pull.

USDA soil survey, inside the Grapevine city limitsWhat is mapped
Soil series mappedHouston Black 12 percent, Crosstell 10 percent, Gasil 10 percent, Urban land (miscellaneous area) 8 percent and Rader 7 percent
Texture at the surfacefine sandy loam 35 percent, clay 24 percent and clay loam 7 percent
Texture about 40 inches downclay 41 percent, sandy clay loam 18 percent and sandy clay 7 percent
Engineering class about 40 inches downfat clay (CH) 41 percent and lean clay (CL) 31 percent
Average clay content about 40 inches down41 percent
Bedrock mapped within 60 inches18 percent of the area (0 percent hard rock, 18 percent weathered rock)
Seasonal water table within 60 inches7 percent of the area
Flood prone soils7 percent of the area
High corrosion risk for uncoated steel57 percent of the area
Mapped as urban land (disturbed fill)8 percent of the area

The USDA soil survey maps bedrock within 60 inches across 18% of Grapevine, including weathered bedrock across 18%; it maps bedrock within 40 inches across 6%, with typical depth at 42 inches. No hard bedrock is mapped within 60 inches. A seasonal water table and flood prone soils are each mapped across 7%. High steel corrosion risk covers 57%, so the line owner should consider casing and tracer wire materials. The Eagle Ford Formation, of Turonian age, includes shale, siltstone and limestone, which can slow drilling where rock is encountered.

How do we drill through Grapevine clay?

We adjust the bore plan for Grapevine’s clay, including Houston Black soil, rather than treating the mapped ground as uniform. Staged reaming and controlled fluid returns help manage sticky cuttings around local streets and pavement.

  1. Houston Black soil and the mapped clay share can make cuttings cling to the reamer, so we plan thinner fluid and staged passes before pulling pipe.
  2. With high steel corrosion risk mapped across 57% of Grapevine, the line owner can weigh casing and tracer wire materials for a route under Access Road.
  3. A route near Big Bear Creek calls for attention to channel depth and creek conditions; we check for Corps jurisdiction during planning.
  4. Along Airfield Drive, marked utilities are exposed with hydrovac potholing before the drill approaches, because paint does not show how deep a line sits.
Open bore pit in red Oklahoma dirt with white PVC conduit stub ups and an orange safety barrier
An open bore pit in red Oklahoma dirt with PVC conduit stubbed up and a safety barrier around it.

Where does a Grapevine line have to go under Interstate 635?

A Grapevine bore under Interstate 635 or another major route needs a path planned around the highway and its pavement. Texas State Highway 121 has 19.7 roadway miles inside city limits, and Texas State Highway 114 has 16.3. Texas State Highway 26 and Spur 97 also run through the city. Interstate 635 has 0.2 mapped roadway miles inside the limits. Among the longer local streets, Dfw measures 12.41 miles, Access Road 6.3 miles and Airfield Drive 6.29 miles. These routes can mean different access and pavement conditions for a bore.

CrossingTypeMapped extentWho has a say
Interstate 635Interstate0.2 roadway miles insideState highway office
Texas State Highway 121State highway19.7 roadway miles insideState highway office
Texas State Highway 114State highway16.3 roadway miles insideState highway office
Texas State Highway 26State highway11.3 roadway miles insideState highway office
Spur 97State highway8.1 roadway miles insideState highway office
Texas State Highway 360State highway5.1 roadway miles insideState highway office
Texas State Highway 114 BusinessState highway4.8 roadway miles insideState highway office
FM 2499State highway2.8 roadway miles insideState highway office
Texas State Highway 121 BusinessHighway nearby0.3 miles outsideState highway office
Fort Worth and Western RailroadRailroad6.19 track miles insideThe railroad
a short line railroad (reporting mark TEXR)Railroad2.52 track miles insideThe railroad
Big Bear CreekStream5.83 channel miles insideChecked for Corps of Engineers jurisdiction
Denton CreekStream4.9 channel miles insideChecked for Corps of Engineers jurisdiction
Cottonwood BranchStream4.28 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

The Fort Worth and Western Railroad has 6.19 track miles in Grapevine, and the TEXR short line has 2.52. Public records map 31 street and rail crossings, so a track route needs coordination with the railroad that owns it. Big Bear Creek runs 5.83 channel miles in the city, while Denton Creek runs 4.9; 34 street crossings of named streams are mapped. Grapevine Lake also touches the city, so water crossings need early route planning.

Do I need a permit to bore in Grapevine or Tarrant County?

On Texas State Highway 121 in Grapevine, TxDOT cover requirements set how deep a bore runs: electric and communication lines need 60 inches at crossings and 48 inches along the right of way; water lines need 60 inches at crossings and 36 inches along it. Pressurized sewer crossings need 60 inches. The utility owner applies through TxDOT’s RULIS system, with the TxDOT Fort Worth District reviewing the application; we provide the bore plan and profile and work under that utility owner’s permit. Existing highway pavement is bored or tunneled. A Fort Worth and Western Railroad crossing needs an agreement with the railroad owner, and a Big Bear Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. Grapevine city streets have the city as their street owner.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who should we ask about line ownership near the City of Grapevine water system?

The City of Grapevine public water system uses surface water and reports 25,626 service connections serving 52,346 people. For a conduit bore, electric providers reported for Tarrant County include Oncor Electric Delivery Company, Denton County Electric Cooperative, Tri-County Electric Cooperative and United Electric Cooperative Service. Those reports do not identify the provider at every Grapevine address, so we confirm the line owner before laying out an electric conduit route near Airfield Drive.

Line ownerWhat it isSourceSize
City of GrapevinePublic water systemSurface water25,626 connections, 52,346 people served
Oncor Electric Delivery Company, Denton County Electric Cooperative, Tri-County Electric Cooperative and United Electric Cooperative ServiceElectric utilities reporting service in Tarrant CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Grapevine’s median housing year is 1992 in the American Community Survey 2019 to 2023 five year estimates, context we consider for underground work. The survey estimates 3% of homes were built before 1960, 64% from 1960 to 1999 and 33% in 2000 or later. A replacement bore along Access Road may need to pass older buried lines as well as newer services. We hydrovac pothole marked utilities on the route before drilling near them, since locate marks show position but not depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

Where is Grapevine in relation to Colleyville?

Grapevine is in northeast Tarrant County, where 98% of the incorporated city lies, with a small part extending into Dallas and Denton counties. The city covers 32.16 square miles and sits at an elevation of 637 feet. ZIP codes include 76051 and 75261. Southlake is 4.4 miles west, Colleyville is 5.2 miles southwest, and Coppell is 5.3 miles east. Fort Worth, the Tarrant County seat, is 19.0 miles southwest; Irving is the nearest larger city at 8.1 miles southeast. Our Yukon yard is 204 road miles away, a 4.1 hour drive.

Places near Grapevine

What kinds of bores come up near Grapevine’s Big Bear Creek?

  • Highway crossing: A Texas State Highway 121 bore needs a route beneath pavement, with depth and access planned around the roadway.
  • Water service: A connection near the City of Grapevine water system can be routed under local pavement instead of cutting across Airfield Drive.
  • Fiber route: A conduit bore along Dfw can avoid open cuts on one of Grapevine’s longest named streets.
  • Creek crossing: A Big Bear Creek bore needs a route planned below the channel, with water jurisdiction checked during planning.
  • Rail crossing: A route under the Fort Worth and Western Railroad requires an agreement with the track owner before crossing work proceeds.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of directional boring near Dfw in Grapevine?

For a quote on Dfw, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. The route matters: a line near Airfield Drive may have different pavement and utility conflicts from a route toward Big Bear Creek. Those details let us assess the crossing plan and equipment before scheduling a crew.

Houston Black clay and the mapped share of heavy clay matter first because sticky cuttings can affect reaming and the pipe pull. Next, the number of utilities to expose and crossings to make can change the plan, especially near Interstate 635 or the Fort Worth and Western Railroad. Pavement, creek or drainage crossings, pits, excavator time and backfill also affect the work. Bore length and pipe size count, as does mobilization from the Yukon office, 204 road miles away.

Questions people ask about boring in Grapevine

Does Trinity take directional boring jobs in Grapevine and Tarrant County, and who staffs them?

Yes, we take directional boring jobs in Grapevine, and Trinity stays responsible from the first call through the bore log. Our Yukon office coordinates the work with our own crews and satellite yards operated by partner drilling contractors we have vetted. That model applies to routes on streets such as Access Road without suggesting a Grapevine office.

Who controls Airfield Drive in Grapevine, and can a bore avoid cutting the street?

Airfield Drive is a city street in incorporated Grapevine, so the city owns it. Directional boring can place a line beneath pavement without cutting across the roadway, subject to the route and site conditions. We check and expose marked utilities before the drill approaches the planned path.

How old are Grapevine homes and buried lines near Access Road, and can they be replaced by bore?

Grapevine’s median housing year is 1992, according to the American Community Survey 2019 to 2023 five year estimates. A replacement route near Access Road may encounter existing utility lines alongside newer services. We expose marked utilities with hydrovac potholing before drilling near them, then plan the bore around what is found.

Does Houston Black soil in Grapevine corrode steel, and what pipe can be used?

The USDA soil survey maps high steel corrosion risk across 57% of Grapevine, including areas with Houston Black soil. The line owner decides whether steel casing or tracer wire needs a coating. HDPE is another option for a line where steel corrosion is a concern, depending on the project requirements.

What ground does a Grapevine bore encounter in Houston Black soil?

Houston Black soil covers 12% of Grapevine in the USDA soil survey. At about 40 inches, clay is the leading mapped texture at 41%, with sandy clay loam at 18%. Sticky clay can build on a reamer, so staged passes and a prompt pipe pull help manage the hole.

How much rock is mapped within five feet of Grapevine ground?

The USDA soil survey maps bedrock within 60 inches across 18% of Grapevine, and bedrock within 40 inches across 6%. Weathered bedrock is mapped across 18% within 60 inches; no hard bedrock is mapped at that depth. The Eagle Ford Formation includes shale, siltstone and limestone, which may slow a bore where encountered.

What bore sizes and lengths can Trinity handle near Ira E Woods Avenue in Grapevine?

For a job near Ira E Woods Avenue, our equipment range covers 3/4 inch service lines through 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The route, ground and crossing conditions determine the setup for a particular job. We can review a sketch or plans with the location and dimensions.

How much notice does Texas811 need for Grapevine work on Dfw, and what if marks move?

For a Dfw bore, submit the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work starts. The ticket’s 20 day life must fit the work schedule; a start more than 14 days past the original notice needs a new request. In Grapevine, we refresh worn or moved marks through Texas811 before work continues, keeping the marked route current for boring work.

What affects the cost of a Grapevine bore near Interstate 635?

The price depends on the job details, starting with Houston Black clay or rock conditions and then the number of utilities and crossings to expose. Interstate 635, pavement, creek crossings, pit work, backfill, bore length and pipe size can change the scope. Mobilization from our Yukon office also matters for work 204 road miles away.

Where the Grapevine facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Grapevine

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Grapevine, Texas

Type the address of your job in Grapevine. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Grapevine

Same county: Fort Worth · Arlington · Grand Prairie · Mansfield · North Richland Hills · Bedford · Keller · Haltom City · Hurst · Saginaw · Benbrook · Watauga. All counties: Texas county list.