trinityboringsolutions.com

El Chaparral Texas Directional Boring: Lagloria Silt Loam, US 83, Border Pacific Railroad

Quick Answer: At El Chaparral, confirm the water provider by address and the electric line owner among three utilities reporting service in Starr County before a bore. Trinity bores routes near US 83 using directional boring, also called horizontal directional drilling (HDD), after locating marked lines. From Yukon, El Chaparral is 741 road miles away, and the Border Pacific Railroad runs 0.1 miles outside its mapped boundary. USDA maps Lagloria silt loam across 92 percent, so fluid control matters in this soft ground.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

El Chaparral bores at a glance

  • Unincorporated community in Starr County, Texas. Population 467 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 741 miles, about 14.4 hours of driving.
  • Ground: Lagloria soil is mapped on 92 percent of the area, with silt loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 83. State permit office: TxDOT Pharr District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring near El Chaparral and Border Pacific Railroad?

Trinity Boring Solutions takes directional boring work in El Chaparral, where the water provider must be verified by address and the electric line owner confirmed before a conduit bore. The Census Bureau counted 467 people here in the 2020 Census; it does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber along routes such as US 83 and San Agustin Street, with marked lines exposed before drilling nearby.

Our main office is in Yukon, Oklahoma, and El Chaparral work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business started in 1965, and we have done directional boring since 1982. Our range runs from 3/4 inch service lines to 48 inch casing, suitable for the street and highway routes in El Chaparral.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What is El Chaparral soil like to bore through near Lagloria?

The USDA soil survey maps Lagloria soil across 92 percent of El Chaparral, with Lagloria silt loam covering the same share of the mapped community. At about 40 inches below the surface, silt loam remains the dominant texture across 92 percent, while 6 percent is mapped as stratified very fine sandy loam to silty clay to clay. The survey estimates average clay content at that depth at 15 percent. These are mapped soil patterns, not test borings, so the route still needs field checks.

USDA soil survey, inside the El Chaparral mapped community boundaryWhat is mapped
Soil series mappedLagloria 92 percent and Matamoros 6 percent
Texture at the surfacesilt loam 94 percent and silty clay 6 percent
Texture about 40 inches downsilt loam 92 percent and stratified very fine sandy loam to silty clay to clay 6 percent
Engineering class about 40 inches downsilty clay (CL ML) 92 percent and fat clay (CH) 6 percent
Average clay content about 40 inches down15 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils8 percent of the area
High corrosion risk for uncoated steel100 percent of the area

USDA mapping places no bedrock within the top five feet in El Chaparral, but that says nothing certain about deeper ground. Seasonal water table is not mapped within 60 inches, while flood prone soils cover 8 percent. High steel corrosion risk is mapped across the area, so the line owner should consider casing and tracer wire materials; HDPE avoids that concern. The geologic map shows Cenozoic terrace deposits of Rio Grande gravel, sand, silt and clay, which can change along a bore path.

How do crews bore El Chaparral silt loam?

El Chaparral’s mapped silt loam can drill quickly but can soften when wet, so we manage fluid and steering instead of pushing pressure under pavement on US 83.

  1. We use lower fluid pressure beneath US 83 pavement because El Chaparral’s silt loam can wash out when it gets too wet.
  2. The Lagloria soil is mostly silt loam, so we watch steering response as moisture changes and avoid forcing the head off its intended line.
  3. Before drilling near San Agustin Street, we hydrovac each marked utility on the route because surface paint does not show its depth.
  4. We track the drill head from the surface and log depth and pitch, then set pits in dirt beside the pavement rather than cutting across the street.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

What might a new line cross in El Chaparral near US 83?

US 83 is the only mapped highway inside El Chaparral, with 0.2 roadway miles in the community, so a route there needs a planned crossing profile. San Agustin Street is the longest named street at 0.48 miles, followed by San Bernardo Street at 0.45 miles. A route may also use 2nd Street, which measures 0.16 miles, or San Bernardo, at 0.15 miles. These are separate mapped street names, and the exact address determines which pavement and buried lines are in the bore path.

CrossingTypeMapped extentWho has a say
US 83US highway0.2 roadway miles insideState highway office
Border Pacific RailroadRailroad nearby0.1 miles outsideThe railroad
Swipe the table sideways to see every column.

The Border Pacific Railroad track lies 0.1 miles outside El Chaparral’s mapped boundary, and no street and rail crossing is mapped inside the community. There are no streams mapped inside or within one mile, and no lakes or ponds are mapped within one mile. That leaves no mapped channel crossing to plan around here, but the actual route still needs a field review for drainage features and existing utilities.

Do I need a permit to bore in El Chaparral, Starr County?

El Chaparral has no city government, so work on its public streets is handled by the county or state rather than a town office. For a bore in the US 83 right of way, the utility owner applies for a TxDOT utility permit through RULIS, and the TxDOT Pharr District reviews it; we prepare the bore plan and profile for that owner. Electric and communication lines crossing US 83 need 60 inches of cover below the lowest crossed grade, while water needs 60 inches and pressurized sewer needs 60 inches. TxDOT requires boring or tunneling beneath existing highway pavement, and rural highway bores extend beneath all travel lanes. A crossing of the nearby Border Pacific Railroad requires an agreement with the railroad owner.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines already in the ground in Starr County near El Chaparral?

EPA drinking water records do not match a named water system to El Chaparral, so the provider for a specific address must be confirmed with the city, county or local water district before planning a bore. AEP Texas Central, Magic Valley Electric Cooperative and Medina Electric Cooperative report electric service in Starr County; that does not identify the supplier at every address. We confirm the electric line owner before routing conduit near US 83 or San Agustin Street.

Line ownerWhat it isSourceSize
AEP Texas Central, Magic Valley Electric Cooperative and Medina Electric CooperativeElectric utilities reporting service in Starr CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 estimates place El Chaparral’s median housing year at 1986, which we consider alongside verified underground conditions. The survey estimates 81 percent of housing was built from 1960 to 1999 and 19 percent in 2000 or later. That mix can mean a route on San Agustin Street serves an existing property or a newer connection, and the buried lines need to be located either way. We use hydrovac potholing to expose each marked utility before the drill approaches it; paint shows position, not depth.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

What is near El Chaparral and Rio Grande City?

El Chaparral is an unincorporated census designated place in Starr County, at an elevation of 156 feet and covering 0.1 square miles. ZIP code 78582 serves the community. Santa Rosa is 0.2 miles west, Santa Cruz is 0.3 miles north, Garza-Salinas II is 0.5 miles northeast, El Refugio is 0.8 miles southeast, and B and E is 1.0 mile northeast. Rio Grande City, the county seat and nearest larger city, is 4.0 miles northwest. Our Yukon yard is 741 road miles away, a 14.4 hour drive, which affects mobilization for work on US 83 or local streets.

Places near El Chaparral

What kinds of bores come up around El Chaparral’s San Agustin Street?

  • Highway crossing: A route beneath US 83 needs a bore profile that accounts for travel lanes, pavement and marked utilities.
  • Street service: A water or sewer connection along San Agustin Street can be bored between pits without cutting the street surface.
  • Fiber conduit: A fiber route near 2nd Street needs potholes at marked utility crossings before the drill approaches them.
  • Rail crossing: Work under the Border Pacific Railroad track needs the railroad owner’s agreement and its crossing conditions.
  • Electric conduit: Near San Bernardo Street, we first confirm which electric utility owns the line at the specific address.
  • Water service: Along San Agustin Street, confirm the address’s water provider before planning a service bore.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote work near El Chaparral and Border Pacific Railroad?

A map pin matters in El Chaparral because a route near US 83 has different pavement and utility crossings from one along San Agustin Street or beside the Border Pacific Railroad. Send the job address or pin, what will go underground, pipe or conduit size and footage. A sketch or plan helps us place the pits and review the route before quoting.

Mobilization starts with the 741 road miles from Yukon, and the Lagloria silt loam mapped across El Chaparral affects drilling and fluid control. We also consider pipe or conduit size, total length, marked utilities to expose, pavement on US 83, and any railroad crossing near the Border Pacific track. Pits, excavator time, sand backfill and emergency or high profile conditions can add work. The route and access determine which of those items apply.

Questions people ask about boring in El Chaparral

Does Trinity take directional boring work in El Chaparral, Starr County, and who staffs it?

Yes. Trinity Boring Solutions takes directional boring work in El Chaparral, Starr County, with our own crews and vetted partner drilling contractors working from satellite yards. You deal with Trinity through the job, regardless of which crew is on site. That keeps planning for a route near US 83 connected to the bore log and closeout.

Does El Chaparral Lagloria soil corrode steel, and what pipe should I use?

The USDA survey maps high steel corrosion risk across El Chaparral, including the Lagloria soil area. The line owner should weigh that when selecting steel casing or tracer wire materials. HDPE is not affected by soil corrosion, but the pipe choice depends on the line design and what the owner specifies for the route near San Agustin Street.

What ground will a bore pass through in El Chaparral Lagloria soil?

Lagloria soil is mapped across 92 percent of El Chaparral, and the USDA survey shows silt loam across 92 percent at about 40 inches below the surface. Another 6 percent is mapped as stratified material ranging from very fine sandy loam to clay. The survey is a regional soil map, not a test of a proposed bore along US 83.

Will we encounter rock on a directional bore near US 83 in El Chaparral?

Bedrock is not mapped within the top five feet in El Chaparral, but deeper rock is still possible. The geologic map describes Cenozoic terrace deposits with gravel, sand, silt and clay. On a route near San Agustin Street, field conditions and bore depth matter more than the surface map alone.

Who approves a bore beneath US 83 for El Chaparral work?

TxDOT reviews a utility permit for work in the US 83 right of way through its Pharr District. The utility owner submits the application in TxDOT’s RULIS system, while we prepare the bore plan and profile. A permit sets the approved depth, and the bore must be planned for the highway pavement and travel lanes.

What does a bore under the Border Pacific Railroad near El Chaparral require?

The Border Pacific Railroad owns the track mapped 0.1 miles outside El Chaparral’s boundary. A crossing needs an agreement from that railroad, which sets conditions such as casing, depth and flagging. No street and rail crossing is mapped inside the community, so the proposed route must establish whether it actually reaches the track.

How much 811 notice do I need for a bore on San Agustin Street in El Chaparral?

Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and it cannot be filed earlier than 14 days before work. For a San Agustin Street job, if the start slips more than 14 days past the original notice, request a new ticket. We have worn or moved marks refreshed through Texas811 before work continues in El Chaparral.

How far is El Chaparral from Rio Grande City and Trinity’s Yukon office?

El Chaparral is 4.0 miles southeast of Rio Grande City and 741 road miles from Trinity’s Yukon, Oklahoma main office, a 14.4 hour drive. That distance affects mobilization for a route such as one along US 83. We consider access, job length and the equipment needed when planning a trip to Starr County.

What affects directional boring cost for an El Chaparral crossing under US 83?

The job route and scope determine the price, not one single measurement. A US 83 bore can involve its length, pipe size, pavement, utility crossings to expose and required cover. El Chaparral’s Lagloria silt loam affects drilling conditions, while the 741 road miles from Yukon affect mobilization. Pits, excavator time, backfill and emergency conditions can also matter.

Where the El Chaparral facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in El Chaparral

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in El Chaparral, Texas

Type the address of your job in El Chaparral. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for El Chaparral

Same county: Roma · Las Lomas · Escobares · La Grulla · Mikes · East Alto Bonito · West Alto Bonito · La Puerta · Mesquite · Valle Vista · Garceno · Camargito. All counties: Texas county list.