Hawley Texas Directional Boring: Spur Loam, US 277 And Clear Fork Brazos River
Quick Answer: Trinity Boring Solutions handles directional boring, or horizontal directional drilling (HDD), in Hawley, where the Clear Fork Brazos River crosses the city. From our Yukon, Oklahoma main office, Hawley is 282 road miles away, and Avenue East gives a long street corridor to plan around. Spur loam is the leading mapped soil unit; clay loam can hold the hole and cling to tooling. US 277, Avenue G and F Avenue also shape route choices through town.
Hawley bores at a glance
- Incorporated city in Jones County, Texas. Population 581 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 282 miles, about 5.6 hours of driving.
- Ground: Spur soil is mapped on 28 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 277, US 83, FM 1082, FM 3326 and FM 605. State permit office: TxDOT Abilene District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Clear Fork Brazos River.
- Public water: Hawley Water Supply Corporation, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring in Jones County near Hawley?
Hawley is in Jones County, where the Census Bureau Vintage 2024 estimate puts the city at 581 people. We install water and sewer lines, gas lines, electric conduit and fiber; in Hawley, those routes may follow Avenue East or connect across US 83 and the local street grid. The route and marked utilities need to be defined before drilling.
Our main office is in Yukon, Oklahoma, and Hawley work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For a service connection near Avenue G, we handle 3/4 inch lines; our range reaches 48 inch casing and bores from 10 feet to 5,000 feet. Trinity is a family business established in 1965, with directional boring part of our work since 1982.

What ground should we expect when drilling in Hawley near Spur soil?
The USDA soil survey maps Spur as the leading soil series in Hawley, covering 28 percent of the mapped area. Miles covers 27 percent and Sagerton 21 percent. At about 40 inches below the surface, sandy clay loam is mapped under 31 percent of the area, while clay loam accounts for 27 percent. At the surface, fine sandy loam is the most common texture at 32 percent. We treat the Spur, Miles, Sagerton and Rotan map patterns as preliminary, not test borings, and verify conditions near Avenue G. Clay can cling to a reamer, while sandier layers need support to keep the bore open.
| USDA soil survey, inside the Hawley city limits | What is mapped |
|---|---|
| Soil series mapped | Spur 28 percent, Miles 27 percent, Sagerton 21 percent, Rotan 6 percent and Polar 6 percent |
| Texture at the surface | fine sandy loam 32 percent, loam 28 percent and clay loam 27 percent |
| Texture about 40 inches down | sandy clay loam 31 percent, clay loam 27 percent and loam 22 percent |
| Engineering class about 40 inches down | lean clay (CL) 60 percent, clayey sand (SC) 31 percent and silty clayey sand (SC SM) 6 percent |
| Average clay content about 40 inches down | 27 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 3 percent of the area |
| Flood prone soils | 32 percent of the area |
| High corrosion risk for uncoated steel | 7 percent of the area |
Bedrock is not mapped in the top five feet of Hawley, though the map records Alluvium of Holocene age and Early Permian sedimentary rock. That does not rule out deeper rock. Seasonal water tables are mapped within 60 inches in 3 percent of the area, while flood prone soils cover 32 percent, particularly relevant near the Clear Fork Brazos River. Plan pits for possible water and keep creek bores below the channel. High steel corrosion risk is mapped in 7 percent of the area, so the line owner should consider casing and tracer wire materials.
How do we bore through Hawley’s sandy clay loam near US 277?
Hawley’s mapped sandy clay loam and clay loam call for a controlled bore, not a rushed pull. Near Spur soils or the Clear Fork Brazos River, we match the drilling fluid and pit plan to the route.
- On Spur loam routes, we control fluid and ream in stages so clay does not build up on the tooling or grip the pipe.
- Where Hawley’s mapped sandy clay loam gives way to sandier ground, we support the bore wall and have the pipe ready before the final ream.
- At Avenue East pavement or slabs, we keep fluid pressure controlled to reduce the chance of lifting the surface.
- Near the Clear Fork Brazos River, we plan pits for possible water and track depth and pitch as the bore advances below the channel.

Where might a line need to go under Avenue East in Hawley?
US 277 has 11.7 mapped roadway miles inside Hawley, and US 83 has 5.9. FM 1082, FM 3326, FM 605 and FM 1226 also run within city limits, so a highway route needs its own permit planning. Avenue East is the longest named street at 1.47 miles, followed by Avenue G at 1.11 miles and F Avenue at 0.84 miles. These corridors can bring pavement and existing lines into the bore path. A bore keeps the surface uncut while the line passes below it.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 277 | US highway | 11.7 roadway miles inside | State highway office |
| US 83 | US highway | 5.9 roadway miles inside | State highway office |
| FM 1082 | State highway | 1.4 roadway miles inside | State highway office |
| FM 3326 | State highway | 1.2 roadway miles inside | State highway office |
| FM 605 | State highway | 0.3 roadway miles inside | State highway office |
| FM 1226 | State highway | 0.1 roadway miles inside | State highway office |
| Clear Fork Brazos River | Stream | 2.06 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Clear Fork | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Hawley or within one mile outside the city limits, so no local track crossing is identified. The Clear Fork Brazos River runs 2.06 channel miles through town, and mapped streets cross named streams at two locations. With no lakes or ponds mapped within one mile, we focus water checks on Clear Fork Brazos River crossings. Near the river, flood prone soil coverage makes channel depth and pit placement part of the route plan; the water crossing is also checked for federal jurisdiction during planning.
Whose permission does a Hawley bore under US 277 need?
For work in the US 277 right of way, the utility owner applies for a TxDOT utility permit through RULIS, and the TxDOT Abilene District reviews it. We prepare the bore plan and profile for that owner’s application and work under the issued permit. TxDOT cover requirements set the depth: electric and communication lines need 60 inches at crossings and 48 inches along the right of way; water needs 60 inches at crossings and 36 inches along it; pressurized sewer needs 60 inches at crossings. The permit may set another depth. Hawley’s city streets belong to the city, and Clear Fork Brazos River crossings are checked for Corps jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines may already be buried in Hawley and Jones County?
Hawley Water Supply Corporation uses purchased surface water and reports 2,812 service connections serving 8,436 people. Before a water service bore along Avenue East or a conduit route near the water system, the address and line owner need confirmation. AEP Texas North, Big Country Electric Cooperative and Taylor Electric Cooperative report electric service in Jones County; that list does not identify the provider at every Hawley address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Hawley Water Supply Corporation | Public water system | Surface water bought from another system | 2,812 connections, 8,436 people served |
| AEP Texas North, Big Country Electric Cooperative and Taylor Electric Cooperative | Electric utilities reporting service in Jones County | EIA Form 861 | Confirm the line owner by address |
Hawley’s median housing year is 1974, so we verify utility records before boring along Avenue East. In Hawley, 32 percent of homes were built before 1960, 54 percent from 1960 to 1999 and 14 percent in 2000 or later, so we verify utilities before boring. A replacement bore near Avenue G may need to avoid older buried services, while a newer connection has a different route to verify. We hydrovac marked utilities before drilling near them because paint shows position, not depth.

Do you cover Hawley and nearby Abilene?
Hawley is an incorporated city in Jones County, at an elevation of 1,629 feet and with 2.93 square miles of land. Its ZIP code is 79525. Impact is 8.2 miles southeast, Tye is 11.2 miles south, and Abilene is 11.3 miles south. Anson, the county seat, is 11.4 miles northwest; Merkel is 15.1 miles southwest. Hawley is part of the Abilene metropolitan area. From our Yukon, Oklahoma main office, the drive is 282 road miles and 5.6 hours, which affects mobilization planning for a job near US 277.
Places near Hawley
- Directional boring in Impact: 8.2 miles southeast
- Directional boring in Tye: 11.2 miles south
- Directional boring in Abilene: 11.3 miles south
- Directional boring in Anson: 11.4 miles northwest
- Directional boring in Merkel: 15.1 miles southwest
What kinds of bores come up near the Clear Fork Brazos River in Hawley?
- Highway crossing: A bore under US 277 keeps the line below the roadway, with the utility owner’s TxDOT permit setting the approved route.
- Water service: A connection near Hawley Water Supply Corporation can follow Avenue East after the water line owner is confirmed.
- Fiber route: A fiber bore beside Avenue G can pass beneath pavement and marked utilities without cutting the street surface.
- Creek crossing: A line beneath the Clear Fork Brazos River needs channel depth planning and a jurisdiction check during design.
- Street connection: A service line near F Avenue can use a bore path that avoids open cuts across pavement and driveways.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near East Avenue in Hawley?
For a route near East Avenue, start with its street address or a map pin. Tell us whether the line is water, sewer, gas, electric conduit or fiber, then give the pipe or conduit size and planned footage. A sketch or plan showing the route across Avenue East or toward US 83 helps us see crossings and access.
A direct service route near Avenue G with clear access is simpler to plan than a long crossing under US 277 or the Clear Fork Brazos River. Length, pipe size, Spur soil and the mapped sandy clay loam all affect the work. So do marked utilities to expose, pavement, creek or drainage crossings, pits, excavator time and sand backfill. Mobilization from Yukon matters too, as do high profile or emergency conditions.
Questions people ask about boring in Hawley
Does Trinity take directional boring work in Hawley and Jones County, and who staffs it?
Yes. We take work in Hawley, and our own crews or crews at vetted partner contractor satellite yards can staff it. You coordinate with Trinity from the first call through the bore log, whichever crew is on site. For a route near US 83, we first need its location and scope.
How old are Hawley homes near Avenue G, and does that matter for replacement bores?
It can matter because older streets may have existing services to locate and expose before drilling. The American Community Survey 2019 to 2023 estimates give Hawley a median housing year of 1974, with 32 percent of homes built before 1960. A replacement route near Avenue G needs marked utilities checked for depth by potholing.
Could groundwater or flood prone soil affect a bore pit by the Clear Fork Brazos River in Hawley?
It could affect pit planning near the Clear Fork Brazos River. Seasonal water tables within 60 inches are mapped in 3 percent of Hawley, and flood prone soils in 32 percent. We plan for water in pits and check the river crossing for jurisdiction during design, rather than treating a dry surface as proof of dry ground.
What soil might a Hawley bore pass through in Spur soil areas?
The USDA soil survey maps Spur across 28 percent of Hawley. At about 40 inches down, sandy clay loam is the leading mapped texture at 31 percent, with clay loam at 27 percent. Clay can cling to tooling, so we control fluid and ream in stages. The map is not a site specific test.
Will a bore in Hawley hit rock beneath US 83?
The map does not show bedrock in Hawley’s top five feet, but it does not rule out rock deeper down beneath US 83. It identifies Holocene Alluvium and Early Permian sedimentary rock. We use site conditions and the planned bore depth to guide the method; deeper rock can require slower drilling or different tooling.
Who approves a Hawley bore under US 277?
For work in the US 277 right of way, TxDOT’s Abilene District reviews the utility permit application. The utility owner files through RULIS, not the drilling contractor. We prepare the bore plan and profile for the owner, and the issued permit governs the approved crossing and cover depth.
How far is Hawley from Abilene and Trinity’s Yukon office, and does that affect a bore?
Abilene is 11.3 miles south of Hawley, while our Yukon, Oklahoma main office is 282 road miles away, a 5.6 hour drive. That distance can affect mobilization planning. A bore near US 277 still needs its route, line size, length and crossing details scoped before we can assess the work.
How much notice do I need for a Hawley bore near Avenue East, and what if marks move?
For an Avenue East excavation, Texas law requires a Texas811 locate request at least 48 hours before work, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. When a US 277 bore start slips more than 14 days past the original notice, we submit a new request to the TxDOT Abilene District. Before we resume boring along FM 1082, we have worn or moved marks refreshed through Texas811.
What affects the cost of a Hawley directional bore under US 277?
The route and scope drive the cost, not the highway name alone. Length and pipe size matter, as do Spur soil, pavement, the number of marked utilities to expose and any creek or drainage crossing. A US 277 right of way job also requires permit planning, and mobilization from Yukon is part of the job conditions.
Where the Hawley facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Hawley
- U.S. Census Bureau, TIGER/Line 2024: Hawley boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Hawley
- U.S. Census Bureau, American Community Survey 2019 to 2023: Hawley housing units and year built
- Macrostrat geologic map compilation: map units under Hawley
- U.S. EPA Safe Drinking Water Information System: public water systems serving Hawley
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Jones County
- U.S. Geological Survey, Elevation Point Query Service: Hawley elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Hawley
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Hawley
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Hawley, Texas
Type the address of your job in Hawley. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Hawley
Same county: Stamford · Hamlin · Lueders. All counties: Texas county list.