Winona Texas Directional Boring: Wolfpen Soil, Glade Creek and Union Pacific
Quick Answer: Along Glade Creek and Texas State Highway 155, we take directional boring and horizontal directional drilling (HDD) work in Winona, Texas. Winona is 321 road miles from our Yukon, Oklahoma main office, and Johnson Road helps us judge access and mobilization. We staff Winona work with our own crews and vetted partner drilling contractors. At about 40 inches, sandy clay loam is mapped across 50 percent of Winona, so the reamer may meet sticky ground that needs controlled fluid and staged passes.
Winona bores at a glance
- Incorporated city in Smith County, Texas. Population 686 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 321 miles, about 6.2 hours of driving.
- Ground: Wolfpen soil is mapped on 36 percent of the area, with sandy clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 27 percent of the area.
- Highways inside the boundary: Texas State Highway 155 and FM 16. State permit office: TxDOT Tyler District.
- Railroad track inside the boundary: Union Pacific, with 2 mapped street and rail crossings.
- Named streams inside the boundary: Glade Creek and Harris Creek.
- Public water: City of Winona, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring near Texas State Highway 155 in Winona?
We take directional boring jobs in Winona, Smith County, including water, sewer, gas, electric conduit and fiber routes along streets such as Johnson Road and Dallas Street. The Census Bureau Vintage 2024 estimate puts Winona’s population at 686. We size each route to the line and the access available on those streets.
Our main office is in Yukon, Oklahoma, and Winona work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. The City of Winona groundwater system is a local reference point when planning around existing lines. Our family business started in 1965 and has done directional boring since 1982, with no utility strike in over 25 years.

What is Winona soil like to bore through Wolfpen ground?
The USDA soil survey maps Wolfpen soil across 36 percent of Winona, with Wolfpen loamy fine sand, 1 to 5 percent slopes, covering 31 percent. Surface texture is mapped as loamy fine sand across 37 percent and very gravelly sandy loam across 27 percent. At about 40 inches below the surface, sandy clay loam accounts for 50 percent of the mapped texture, while clay accounts for 31 percent. We treat mapped patterns as planning context for Winona’s Union Pacific track crossing, not as test borings. Sand can cut easily but may cave behind the bit; the deeper clay can cling to the reamer.
| USDA soil survey, inside the Winona city limits | What is mapped |
|---|---|
| Soil series mapped | Wolfpen 36 percent, Redsprings 27 percent, Mattex 17 percent and Gallime 10 percent |
| Texture at the surface | loamy fine sand 37 percent, very gravelly sandy loam 27 percent and loam 17 percent |
| Texture about 40 inches down | sandy clay loam 50 percent, clay 31 percent and clay loam 17 percent |
| Engineering class about 40 inches down | lean clay (CL) 59 percent, clayey sand (SC) 36 percent and fat clay (CH) 3 percent |
| Average clay content about 40 inches down | 30 percent |
| Bedrock mapped within 60 inches | 27 percent of the area (0 percent hard rock, 27 percent weathered rock) |
| Seasonal water table within 60 inches | 32 percent of the area |
| Flood prone soils | 17 percent of the area |
| High corrosion risk for uncoated steel | 60 percent of the area |
The USDA soil survey maps bedrock within 60 inches across 27 percent of Winona, and maps that as weathered bedrock; hard bedrock is not mapped within that depth. A seasonal water table is mapped within 60 inches across 32 percent, and flood prone soils cover 17 percent, so pits and creek side work need a wet ground plan. High steel corrosion risk is mapped across 60 percent, a point for the line owner to consider for steel casing and tracer wire. The Eocene Sparta Sand unit includes fine sand and clay interbeds, so ground conditions can change along a bore.
How do we plan a bore through Winona’s sandy clay loam?
We plan a Winona bore around the sandy clay loam mapped at about 40 inches and the area’s loamy fine sand surface. That mix can call for staged reaming and careful fluid control.
- Wolfpen loamy fine sand can loosen behind the bit, so we use drilling fluid to support the hole and stage the reaming before pulling pipe.
- Where sandy clay loam is mapped at about 40 inches, we manage fluid and ream in stages so sticky cuttings do not crowd the reamer.
- Winona has seasonal water table soils mapped within 60 inches across 32 percent of the area, so we keep pits small and pump water as needed.
- Near Glade Creek, we plan the bore to pass below the channel and check during planning whether the crossing falls under Corps jurisdiction.

What might a new line cross in Winona near Glade Creek?
Texas State Highway 155 and FM 16 both run through Winona, so a route beside either may involve state right of way rather than only city streets. Johnson Road is the longest named street at 1.26 miles within the town, followed by Dallas Street at 1.14 miles and Main Street at 0.9 miles. Kay Street and South Main each run 0.63 miles. The mapped street network totals 13.67 miles, giving us several local routes to check for access and pavement before setting bore pits.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 155 | State highway | 1.7 roadway miles inside | State highway office |
| FM 16 | State highway | 1.6 roadway miles inside | State highway office |
| Union Pacific | Railroad | 1.64 track miles inside | The railroad |
| Glade Creek | Stream | 0.21 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Harris Creek | Stream | 0.09 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Simpson Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific has 1.64 track miles in Winona on the Corsicana Subdivision, and public mapping shows 2 street and rail crossings. Glade Creek runs 0.21 channel miles in town, while Harris Creek runs 0.09 miles; one street crossing of a named stream is mapped. Simpson Creek is 0.6 miles outside the town limits. No lakes or ponds are mapped within one mile, but a creek route still needs depth and access planning.
Who approves a Winona bore in Smith County?
Texas State Highway 155 and FM 16 are TxDOT roads, and the TxDOT Tyler District reviews utility work in their right of way. The utility owner files the application in TxDOT’s RULIS system; we prepare the bore plan and profile and work under the owner’s permit. TxDOT rules call for boring or tunneling beneath existing highway pavement, with crossings encased and rural bores extending beneath all travel lanes. A Union Pacific crossing needs an agreement with the railroad, which sets crossing conditions such as casing, depth and flagging. For Glade Creek, we check Corps jurisdiction during planning. We plan Winona street crossings with the city because incorporated streets belong to it.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are near the City of Winona water system?
The City of Winona public water system uses groundwater wells and has 455 service connections serving 1,245 people. For an electric conduit bore in Winona, we confirm the line owner for the specific route before planning. Utilities reporting electric service in Smith County include Oncor Electric Delivery Company, Southwestern Electric Power, Cherokee County Electric Cooperative Association, Upshur Rural Electric Cooperative and Wood County Electric Cooperative; that list does not identify the provider at every address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Winona | Public water system | Groundwater wells | 455 connections, 1,245 people served |
| Oncor Electric Delivery Company, Southwestern Electric Power, Cherokee County Electric Cooperative Association, Upshur Rural Electric Cooperative and Wood County Electric Cooperative | Electric utilities reporting service in Smith County | EIA Form 861 | Confirm the line owner by address |
We use Winona’s median housing year of 1981, from the American Community Survey 2019 to 2023 five year estimates, as context for underground planning. They estimate 23 percent of housing was built before 1960, 52 percent from 1960 to 1999 and 25 percent in 2000 or later. Along Johnson Road or Kay Street, a project might replace an older service or add a newer connection. Before drilling near a marked utility, we hydrovac pothole to expose it; paint shows position, not depth.

Do you cover Winona and nearby Big Sandy?
Winona is in Smith County, at an elevation of 412 feet, and covers 1.54 square miles. Its ZIP code is 75792. Big Sandy is 7.5 miles northeast, and Hawkins is 7.0 miles north; Lindale is 13.4 miles west and is the nearest larger city listed. Tyler, the county seat, is 14.2 miles southwest. From our Yukon yard, Winona is 321 road miles and a 6.2 hour drive, which is part of planning crew mobilization for a Johnson Road or Glade Creek project.
Places near Winona
- Directional boring in Hawkins: 7 miles north
- Directional boring in Big Sandy: 7.5 miles northeast
- Directional boring in New Chapel Hill: 13.4 miles south
- Directional boring in Lindale: 13.4 miles west
- Directional boring in Gladewater: 13.9 miles east
Which jobs call for a bore along Winona’s Johnson Road?
- Highway crossing: A bore beneath Texas State Highway 155 can keep a new water or fiber line out of the existing pavement.
- Water service: A connection near the City of Winona groundwater system needs a route checked against existing marked lines.
- Fiber conduit: Along Johnson Road, a conduit bore can carry communications lines beneath driveways without cutting the surface.
- Creek crossing: A Glade Creek bore needs a planned path below the channel and room for pits on each side.
- Rail crossing: A route beneath Union Pacific track needs the railroad’s crossing agreement and a plan for its conditions.
- Street service: A line along Kay Street can be bored beneath pavement, with access and marked utilities checked before drilling.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a Winona job near Union Pacific?
For a route near Union Pacific or Texas State Highway 155, we need the address or map pin first. Tell us what will go in the ground, such as a water line or fiber conduit, then the pipe or conduit size and footage. A sketch or plans help show where the route meets streets, tracks or Glade Creek.
A short route with room for pits and no marked crossings may be simpler to plan than a longer bore near Texas State Highway 155 or Union Pacific. Length, pipe size, soil and rock, and the number of utilities to expose all affect the work. Pavement, creek or drainage crossings, pit size, excavator time and sand backfill can add steps. Mobilization also reflects the 321 road miles from Yukon, while high profile or emergency work can change the scope.
Questions people ask about boring in Winona
Does Trinity take directional boring jobs in Winona, Smith County?
Yes. We take directional boring work in Winona, Smith County, and keep the job coordinated through Trinity whether our own crew or a vetted partner contractor is on site. Our main office is in Yukon, Oklahoma, and we bring that planning focus to underground work in Winona. A route on Johnson Road or Texas State Highway 155 helps us identify access and the crossings to plan.
Does Wolfpen soil in Winona corrode steel, and what pipe should I use?
Winona soil mapping shows high steel corrosion risk across 60 percent of the area, so the line owner should weigh casing and tracer wire materials. Wolfpen is the leading mapped soil series. HDPE does not have the same soil corrosion concern, while the line owner selects any coating for steel.
What ground will a bore go through in Winona’s Wolfpen soil?
The USDA soil survey maps Wolfpen across 36 percent of Winona, with loamy fine sand common at the surface. At about 40 inches, sandy clay loam makes up 50 percent of mapped texture and clay 31 percent. Sand can cave behind a bit, while clay can stick to the reamer.
Will a bore in Winona hit rock, and how much bedrock is mapped?
The USDA soil survey maps bedrock within 60 inches across 27 percent of Winona, and that mapped bedrock is weathered; hard bedrock is not mapped within 60 inches. The Eocene Sparta Sand unit is also mapped here. Conditions can vary along a route, so a site review helps plan the bit and profile.
Who approves a Winona bore under Texas State Highway 155?
TxDOT reviews work in the Texas State Highway 155 right of way through its Tyler District. The utility owner submits the application in TxDOT’s RULIS system, while we prepare the bore plan and profile. For work beneath existing highway pavement, TxDOT rules call for boring or tunneling rather than open trenching.
What does a Winona bore beneath Union Pacific track require?
A bore beneath the 1.64 miles of Union Pacific track in Winona needs an agreement with the railroad that owns it. That agreement sets crossing details, including casing, depth and flagging. The Corsicana Subdivision is the named rail route, so its track location needs to be part of the proposed crossing plan.
What bore sizes and lengths can you handle for a Winona job near Kay Street?
For a Kay Street project, we handle lines from 3/4 inch service size up to 48 inch casing. Bore lengths range from 10 feet to 5,000 feet. The route, soil and any nearby marked utilities determine the equipment and plan for a specific Winona job.
How much Texas811 notice do I need for a Winona bore on Johnson Road?
For a Johnson Road start, request locates at least 48 hours ahead, counting two working days and excluding Saturdays, Sundays and legal holidays. The request cannot be made earlier than 14 days before excavation. If the start slips more than 14 days past the notice, make a new request; have worn or moved marks refreshed before work continues.
What affects the cost of directional boring in Winona near Texas State Highway 155?
The job scope determines the price. A route near Texas State Highway 155 may involve pavement and state right of way planning, while sandy clay loam, creek crossings or Union Pacific can add work. Length, line size, utilities to expose, pits, excavator time, backfill and mobilization from Yukon also factor in.
Where the Winona facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Winona
- U.S. Census Bureau, TIGER/Line 2024: Winona boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Winona
- U.S. Census Bureau, American Community Survey 2019 to 2023: Winona housing units and year built
- Macrostrat geologic map compilation: map units under Winona
- U.S. EPA Safe Drinking Water Information System: public water systems serving Winona
- U.S. Department of Transportation, North American Rail Network: track owners in Smith County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Smith County
- U.S. Geological Survey, Elevation Point Query Service: Winona elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Winona
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Winona
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Winona, Texas
Type the address of your job in Winona. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.