Hollywood Park Texas Directional Boring: Crawford Stony Clay, Lorence Creek, Loop 1604
Quick Answer: Hollywood Park is an incorporated town, so its streets belong to the town; we take directional boring, also called horizontal directional drilling (HDD), for crossings near Lorence Creek. Meadowbrook Drive and the creek are routes where keeping pavement and banks uncut matters. Yukon is 474 road miles away, and that distance matters when planning a bore near Donella Drive. The USDA soil survey maps Crawford stony clay here, with bedrock typically at 33 inches, so the drill plan must account for rock early.
Hollywood Park bores at a glance
- Incorporated city in Bexar County, Texas. Population 3,128 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 474 miles, about 9.1 hours of driving.
- Ground: Crawford soil is mapped on 98 percent of the area, with bedrock about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 100 percent of the area.
- Highways inside the boundary: US 281 and Loop 1604. State permit office: TxDOT San Antonio District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Lorence Creek and Panther Springs Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Does anyone handle directional boring near Lorence Creek in Hollywood Park?
Hollywood Park is an incorporated town in Bexar County, where streets are town owned. The Census Bureau Vintage 2024 estimate puts the population at 3,128. Along Meadowbrook Drive or Donella Drive, we install water, sewer, gas, electric conduit and fiber where the route and existing lines allow.
Our main office is in Yukon, Oklahoma, and Hollywood Park work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Along Meadowbrook Drive, our record is no utility strike in over 25 years. We are a family business started in 1965, with directional boring since 1982; that history shapes how we handle marked lines.

What does the soil survey show beneath Crawford soil in Hollywood Park?
The USDA soil survey maps Crawford soil across 98 percent of Hollywood Park. The mapped unit is Crawford, stony and Bexar soils, 0 to 5 percent slopes. Its surface texture is stony clay across 98 percent of the town, so the upper ground can be sticky and can build up on a reamer. At about 40 inches below the surface, the survey maps bedrock rather than clay or sand across the mapped area. These are mapped soil patterns, not test borings, so a site plan still has to account for changing ground.
| USDA soil survey, inside the Hollywood Park city limits | What is mapped |
|---|---|
| Soil series mapped | Crawford 98 percent |
| Texture at the surface | stony clay 98 percent |
| Texture about 40 inches down | bedrock 100 percent |
| Bedrock mapped within 60 inches | 100 percent of the area (100 percent hard rock, 0 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
The USDA soil survey maps bedrock within 60 inches across 100 percent of Hollywood Park, with hard bedrock mapped throughout that area and a typical depth of 33 inches. That makes a rock bit, mud motor or air hammer a possible need as a bore advances. Seasonal water tables and flood prone soils are not mapped. High steel corrosion risk is mapped across 100 percent, so the line owner should choose coatings for steel casing or tracer wire; HDPE is not affected. The geologic map unit is Edwards limestone, undivided, of Albian age, with abundant chert.
What does it take to bore through bedrock in Hollywood Park?
Crawford stony clay over shallow Edwards limestone calls for a plan that can handle a change from soil to hard rock. On a route near Lorence Creek, we keep the bore controlled and the surface intact.
- Crawford stony clay can stick to a reamer, so we adjust the fluid and open the bore in stages before pulling line on a route near Fleetwood Drive.
- With hard Edwards limestone mapped from a typical depth of 33 inches, we may change to rock tooling and check steering carefully where soil meets rock.
- We hydrovac pothole every marked utility on the bore path before drilling near it; along Meadowbrook Drive, paint alone cannot show a line’s depth.
- At Lorence Creek, we plan the bore depth beneath the channel and track the drill head from the surface, logging depth and pitch as it advances.

Which roads, tracks or creeks matter for Hollywood Park bores near US 281?
US 281 runs 1.0 mapped roadway mile inside Hollywood Park, and Loop 1604 adds 0.4 miles. The town has 28.52 public road centerline miles, including Meadowbrook Drive at 1.39 miles, Fleetwood Drive at 1.23 miles and Donella Drive at 1.09 miles. Those street lengths help describe where a service route may run, but the exact address and access points shape the bore. Where a route follows pavement, directional boring can place the line without cutting across the street surface.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 281 | US highway | 1 roadway miles inside | State highway office |
| Loop 1604 | State highway | 0.4 roadway miles inside | State highway office |
| Lorence Creek | Stream | 1.04 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Panther Springs Creek | Stream | 0.54 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Mud Creek | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
| Panther Spring Creek | Stream nearby | 1 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Hollywood Park or within one mile of its limits, and no street and rail crossings are mapped. Lorence Creek runs 1.04 channel miles through town, while Panther Springs Creek runs 0.54 miles; four street crossings of named streams are mapped. No lakes or ponds are mapped within one mile. A creek route needs its own depth and access plan, even where the surrounding street is an ordinary residential road.
Who handles approvals for a bore in Bexar County near Hollywood Park?
Hollywood Park owns its town streets, while a bore in the right of way of US 281 or Loop 1604 needs a TxDOT utility permit reviewed by the TxDOT San Antonio District. The utility owner, not Trinity, submits the application through RULIS; we prepare the bore plan and profile and work under the permit issued to that owner. At a highway crossing, electric and communication lines need 60 inches of cover below the lowest crossed grade; water needs 60 inches, and pressurized sewer needs 60 inches. A creek crossing at Lorence Creek is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried in Bexar County near Hollywood Park?
The provider serving a specific Hollywood Park address is not identified from the available EPA drinking water records. Confirm that address with the town, Bexar County or the local water district before planning a bore near Meadowbrook Drive. Utilities reporting electric service in Bexar County include the City of San Antonio, Bandera Electric Cooperative, Guadalupe Valley Electric Cooperative, Karnes Electric Cooperative and Pedernales Electric Cooperative. The line owner for a particular address must be confirmed before conduit specifications are set.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of San Antonio, Bandera Electric Cooperative, Guadalupe Valley Electric Cooperative, Karnes Electric Cooperative and Pedernales Electric Cooperative | Electric utilities reporting service in Bexar County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Hollywood Park’s median housing year at 1972. Eighteen percent of homes were built before 1960, 68 percent from 1960 to 1999 and 14 percent in 2000 or later, so a project may involve either replacement lines or a newer service. Before drilling near any marked utility, we expose every marked line on the bore path with hydrovac potholing; paint shows position, not depth. For example, a marked line beneath Meadowbrook Drive needs to be exposed before the drill approaches.

What is near Hollywood Park and Timberwood Park?
Hollywood Park is an incorporated town in Bexar County, at an elevation of 948 feet and covering 1.45 square miles. Its ZIP code is 78232. Hill Country Village is 1.2 miles south, Shavano Park is 4.4 miles west, and Castle Hills is 5.5 miles south. Timberwood Park, the nearest larger city, is 7.0 miles north; San Antonio, the county seat, is 9.7 miles south. Our Yukon yard is 474 road miles away, a drive of 9.1 hours, so distance is part of planning mobilization for a Donella Drive project.
Places near Hollywood Park
- Hill Country Village: 1.2 miles south
- Directional boring in Shavano Park: 4.4 miles west
- Directional boring in Castle Hills: 5.5 miles south
- Directional boring in Timberwood Park: 7 miles north
- Directional boring in Alamo Heights: 8.1 miles south
What would we bore near Donella Drive in Hollywood Park?
- Highway crossing: A route under US 281 needs a bore plan that accounts for highway cover and avoids cutting through the existing pavement.
- Water service: A service along Meadowbrook Drive needs a confirmed route and address specific water provider before the bore is planned.
- Fiber conduit: A conduit run near Donella Drive can be bored beneath pavement while marked utilities on the route are exposed first.
- Creek crossing: A line beneath Lorence Creek needs a planned depth and a check for U.S. Army Corps of Engineers jurisdiction.
- Residential replacement: Older housing along Fleetwood Drive may call for a replacement route that avoids marked lines and existing pavement.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Hollywood Park quote near Meadowbrook Drive?
A map pin on Meadowbrook Drive matters because the exact route can change where a bore meets pavement, marked utilities or a drainage path. Include the address, what will go underground, the pipe or conduit size and the footage. A sketch or plans help us see the proposed line and access points before we scope the work.
The 474 road miles from Yukon to Hollywood Park put mobilization alongside the bore length for a Donella Drive job. Crawford stony clay and bedrock typically at 33 inches affect tooling and drilling time. Crossings at US 281 or Lorence Creek can add planning and setup, while marked utilities, concrete or pavement, pits and excavator time also shape the scope. High profile or emergency work can change the plan. The exact route and materials determine how these factors apply.
Questions people ask about boring in Hollywood Park
Does Trinity Boring Solutions take directional boring jobs in Bexar County’s Hollywood Park?
Yes. We take directional boring work in Hollywood Park, and the job is handled by our own crews or crews from partner drilling contractors we have vetted, based on the work location. You work with Trinity from the first call through the bore log, including for a route near Meadowbrook Drive.
What ground does a bore go through in Hollywood Park’s Crawford soil?
The USDA soil survey maps Crawford soil over 98 percent of Hollywood Park, with stony clay at the surface. At about 40 inches below ground, bedrock is mapped across the area rather than clay or sand. That clay and rock change can affect reaming and tooling along a route such as Donella Drive.
How much bedrock is mapped within five feet in Hollywood Park?
The USDA soil survey maps bedrock within 60 inches across 100 percent of Hollywood Park, and hard bedrock is mapped throughout that area. Typical depth is 33 inches. Edwards limestone, undivided, with abundant chert is the mapped geologic unit, so the bore plan may need rock tooling.
Who approves a bore under US 281 in Hollywood Park?
TxDOT reviews the utility permit for work in the US 281 right of way through its San Antonio District. The utility owner files in RULIS, while we provide the bore plan and profile and work under the owner’s permit. The required cover depends on the type of line crossing the highway.
Can a line be bored under Lorence Creek in Hollywood Park?
A bore can be planned beneath Lorence Creek, which runs 1.04 channel miles through Hollywood Park. The route needs a planned depth and an assessment for U.S. Army Corps of Engineers jurisdiction during planning. The exact crossing location and access points determine the bore layout.
Which electric company owns lines at a Hollywood Park address in Bexar County?
The owner for a particular address must be confirmed before conduit specifications are set. Utilities reporting electric service in Bexar County include the City of San Antonio and four cooperatives. For a conduit route near Meadowbrook Drive, we need the line owner’s requirements before planning around existing electric facilities.
How far is Hollywood Park from Yukon, and does Timberwood Park change the job?
Hollywood Park is 474 road miles and a 9.1 hour drive from our Yukon main office. Timberwood Park is 7.0 miles north of Hollywood Park, but the job’s distance from Yukon affects mobilization. The route, ground and access near a street such as Donella Drive also shape the work plan.
How much notice does Texas811 need for a bore on Meadowbrook Drive in Hollywood Park?
Paint on Meadowbrook Drive shows a utility’s position, not its depth. Texas811 needs the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If the start slips more than 14 days past the original notice, request a new ticket; refresh worn or moved marks before work continues.
What affects the cost of a directional bore near US 281 in Hollywood Park?
Cost depends on the job scope, including bore length, pipe or conduit size, Crawford soil and the hard bedrock mapped in Hollywood Park. A crossing near US 281 or Lorence Creek can add planning and setup. Marked utilities, pavement, pits, excavator time, emergency timing and mobilization from Yukon also affect the work.
Where the Hollywood Park facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Hollywood Park
- U.S. Census Bureau, TIGER/Line 2024: Hollywood Park boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Hollywood Park
- U.S. Census Bureau, American Community Survey 2019 to 2023: Hollywood Park housing units and year built
- Macrostrat geologic map compilation: map units under Hollywood Park
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Bexar County
- U.S. Geological Survey, Elevation Point Query Service: Hollywood Park elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Hollywood Park
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Hollywood Park
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Hollywood Park, Texas
Type the address of your job in Hollywood Park. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Hollywood Park
Same county: San Antonio · Converse · Universal City · Live Oak · Leon Valley · Helotes · Lackland AFB · Kirby · Selma · Fair Oaks Ranch · Schertz · Windcrest. All counties: Texas county list.
