Quick Answer: Can you get a line beneath Interstate 10 or the North Llano River without cutting across it? We do directional boring, also called horizontal directional drilling (HDD), in Junction, Texas, to carry lines across roads and waterways. The Yukon, Oklahoma main office is 439 road miles away, and Junction includes routes such as US 377. Nuvalde clay loam and heavy clay can stick to the reamer, so the drilling fluid and staged reaming matter. Our no utility strike record for over 25 years matters around lines serving the City of Junction water system.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Junction bores at a glance

  • County seat of Kimble County, Texas. Population 2,492 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 439 miles, about 8.6 hours of driving.
  • Ground: Nuvalde soil is mapped on 52 percent of the area, with silty clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 8 percent of the area.
  • Highways inside the boundary: Interstate 10, US 377, US 83, Loop 481 and FM 2169. State permit office: TxDOT San Angelo District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: North Llano River, Llano River and Lake Junction.
  • Public water: City of Junction, surface water.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can do directional boring in Junction, Kimble County?

Can you get a water, sewer, gas, electric conduit or fiber line beneath a Junction street without opening the pavement? We take those directional boring jobs in Kimble County, where the Census Bureau Vintage 2024 estimate puts the population at 2,492. A bore along Main Street or Llano Street can carry a new service while leaving the road surface intact.

Our main office is in Yukon, Oklahoma, and Junction work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Junction has lines serving the City of Junction water system and electric service reported in Kimble County. Our family business began in 1965, and we have done directional boring since 1982; we have had no utility strike in over 25 years.

Trinity Boring Solutions branded compact directional drilling unit positioned beside a tree on a red dirt jobsite
Our compact directional drill set up beside a tree on a tight site. Photos on this page are from our jobs in Oklahoma and Texas.

What ground does a Junction bore meet in Nuvalde soil?

The USDA soil survey maps Nuvalde clay loam across 52 percent of Junction and Frio silty clay loam across 33 percent. Surface textures are mostly clay loam, mapped across 53 percent, and silty clay loam, across 33 percent. About 40 inches down, 52 percent is mapped as silty clay loam and 33 percent as silty clay. Average clay content at that depth is 36 percent, and no sandy area is mapped there. Across Nuvalde, Frio, Real and Dev soils, we treat mapped patterns as planning context, not as a substitute for site borings. The sticky clay can collect on a reamer and grip the pipe.

USDA soil survey, inside the Junction city limitsWhat is mapped
Soil series mappedNuvalde 52 percent, Frio 33 percent, Real 6 percent and Dev 5 percent
Texture at the surfaceclay loam 53 percent, silty clay loam 33 percent and gravelly clay loam 6 percent
Texture about 40 inches downsilty clay loam 52 percent, silty clay 33 percent and bedrock 8 percent
Engineering class about 40 inches downlean clay (CL) 87 percent and clayey gravel (GC) 5 percent
Average clay content about 40 inches down36 percent
Bedrock mapped within 60 inches8 percent of the area (2 percent hard rock, 6 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils38 percent of the area
High corrosion risk for uncoated steel87 percent of the area

Bedrock is mapped within five feet in 8 percent of Junction; the mapped share is 2 percent hard bedrock and 6 percent weathered bedrock. Terrace deposits of Quaternary age include sand, silt, clay and gravel, while the map also shows Early Cretaceous sedimentary rock. The seasonal water table is not mapped within 60 inches, but flood prone soils cover 38 percent, so the North Llano River channel needs attention. High steel corrosion risk is mapped across 87 percent, a factor for casing and tracer wire material choices.

How do we plan a bore through silty clay loam in Junction near Main Street?

Junction’s clay rich mapped soils can hold a hole open, but sticky cuttings can build on a reamer. Along the North Llano River, we also plan the bore to stay below the channel.

  1. Nuvalde clay loam and the 36 percent average clay content at about 40 inches call for controlled fluid and staged reaming to manage sticky cuttings.
  2. We track the drill head from the surface and log depth and pitch as it passes beneath a route such as Llano Street.
  3. Before approaching marked lines near the City of Junction water system, we hydrovac pothole them because locate paint does not show depth.
  4. For a North Llano River crossing, we plan below the channel and check for Corps jurisdiction; flood prone soils cover 38 percent of Junction.
Walkover locator held over a flowing creek while tracking the drill head on a 385 foot rock bore in Guthrie, Oklahoma
Tracking the drill head with a walkover locator over a flowing creek on a 385 foot bore in Guthrie, Oklahoma.

Which roads and waterways can a Junction bore cross near North Llano River?

Interstate 10 has 1.6 mapped roadway miles inside Junction, alongside US 377, US 83, Loop 481, FM 2169 and RM 1674. TxDOT San Angelo District is the state district for Kimble County. Main Street is the longest named street at 2.7 miles; Llano Street runs 1.73 miles and College Street 1.66 miles. A bore plan can take a line beneath pavement rather than cut across those routes, subject to the applicable road approval.

CrossingTypeMapped extentWho has a say
Interstate 10Interstate1.6 roadway miles insideState highway office
US 377US highway3.1 roadway miles insideState highway office
US 83US highway1.1 roadway miles insideState highway office
Loop 481State highway2.5 roadway miles insideState highway office
FM 2169State highway0.6 roadway miles insideState highway office
RM 1674State highway0.1 roadway miles insideState highway office
North Llano RiverStream1.06 channel miles insideChecked for Corps of Engineers jurisdiction
Llano RiverStream0.1 channel miles insideChecked for Corps of Engineers jurisdiction
Lake JunctionStream0.07 channel miles insideChecked for Corps of Engineers jurisdiction
South Llano RiverStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Cedar CreekStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
The BogsStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Lake JunctionLake or pond38 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Junction or within one mile outside the limits, so there is no mapped track crossing to plan around. The North Llano River has 1.06 channel miles inside the city, and two mapped street crossings of named streams make waterway planning relevant. The Llano River and Lake Junction also appear within the limits. A river or lake bore is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Do I need a permit to bore beneath Interstate 10 in Junction?

For work in Interstate 10, US 377, US 83, Loop 481, FM 2169 or RM 1674 right of way, the line owner files the utility permit through TxDOT’s online RULIS system; the contractor does not file it. We provide the bore plan and profile for the owner’s application, and TxDOT San Angelo District reviews it. Under TxDOT rules, electric and communication lines need 60 inches of cover at a highway crossing, and water lines need 60 inches. The permit can specify another depth. For Interstate 10, we follow TxDOT’s requirement to bore or tunnel beneath existing highway pavement in Junction. City streets such as Main Street belong to the incorporated city. A North Llano River crossing is checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What lines are already in the ground near the City of Junction in Junction?

The City of Junction public water system uses surface water and reports 1,636 service connections serving 2,700 people. Electric service reported in Kimble County includes AEP Texas North, Central Texas Electric Cooperative and Pedernales Electric Cooperative; that list does not identify the provider at every address. Before planning an electric conduit bore near the water system or along US 377, we confirm the line owner for that location.

Line ownerWhat it isSourceSize
City of JunctionPublic water systemSurface water1,636 connections, 2,700 people served
AEP Texas North, Central Texas Electric Cooperative and Pedernales Electric CooperativeElectric utilities reporting service in Kimble CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Junction’s 1971 median housing year informs how we consider existing underground infrastructure when planning boring work in the city. We use Junction’s housing age profile, with 32 percent before 1960, 57 percent from 1960 to 1999 and 11 percent in 2000 or later, to plan utility coordination. That mix can mean an older service replacement as well as a newer connection. Near Main Street, marked utilities are exposed with hydrovac before the drill approaches; paint shows position, not depth.

Exposed underground utility line in a hand dug potholing pit before a directional bore in Oklahoma
An existing utility line exposed in a pothole before a directional bore in Oklahoma.

How far is Junction from Harper and other nearby places?

Junction is the Kimble County seat, at an elevation of 1,710 feet, and covers 2.3 square miles. In Kimble County, we use ZIP code 76849 to identify Junction when coordinating underground boring plans. Menard is 29.6 miles north, Harper is 33.6 miles southeast, and Mason is 36.9 miles northeast. The Yukon, Oklahoma main office is 439 road miles away, an 8.6 hour drive. That distance is part of planning a bore along Interstate 10 or a service route near the North Llano River.

Places near Junction

What kinds of bores come up on Llano Street in Junction?

  • Highway crossing: A line beneath Interstate 10 needs a bore plan for the TxDOT right of way and existing pavement.
  • Water service: A new connection near the City of Junction system needs a route that accounts for existing water lines.
  • Fiber conduit: A conduit along Main Street can pass beneath pavement without an open cut across the street.
  • Creek crossing: A route at the North Llano River needs channel depth planning and a jurisdiction check during planning.
  • Lake crossing: A line near Lake Junction needs a crossing plan that accounts for the mapped lake and its banks.
  • Street service: A bore along Llano Street can carry water, sewer or conduit while avoiding an open cut through the road.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Junction bore quote near 16th Street?

For a route near 16th Street, start with the address or map pin, then tell us what will go underground. Give us the pipe or conduit size and footage, such as a water service or fiber conduit along Main Street. A sketch or plans help show pits, pavement and the route you want.

For a crossing on US 377 in Junction, we set the price from the job scope and the boring conditions it requires. Ground conditions matter: Junction’s mapped Nuvalde clay loam and Frio silty clay loam affect drilling and reaming. Crossings matter too, including Interstate 10 pavement, a North Llano River channel, and marked utilities that need exposure. The route length, pipe or conduit size, pits, excavator time and backfill also shape the work. Mobilization reflects the 439 road miles from Yukon; high profile or emergency work can add planning demands.

Questions people ask about boring in Junction

Does Trinity Boring Solutions take directional boring work in Junction, Kimble County?

Yes. We take directional boring work in Junction and staff it with our own crews or crews from satellite yards run by partner contractors we have vetted. From the first call through the bore log, we guide planning for Loop 481 crossings near Junction. That service model applies to routes such as Main Street and crossings near Interstate 10.

What kind of ground will a Junction bore encounter in Nuvalde soil?

Junction is largely mapped as Nuvalde clay loam and Frio silty clay loam. At about 40 inches, the USDA soil survey maps 52 percent as silty clay loam and 33 percent as silty clay. The clay can cling to the reamer, so staged reaming and a suitable drilling fluid help manage the hole.

Is there bedrock near the surface on a Junction bore route?

Bedrock is mapped within five feet across 8 percent of Junction, with 2 percent hard bedrock and 6 percent weathered bedrock. That does not mean every route encounters it. Terrace deposits and Early Cretaceous sedimentary rock are mapped in the area, so the route near US 83 should be assessed for changing ground.

Who approves a Junction bore beneath Interstate 10?

For Interstate 10 right of way, the line owner submits the utility permit application in TxDOT’s RULIS system, and TxDOT San Angelo District reviews it. We prepare the bore plan and profile for the owner’s filing. TxDOT rules require boring or tunneling beneath existing highway pavement, with cover requirements set by line type.

Can you bore a line beneath the North Llano River in Junction?

A bore beneath the North Llano River can be planned, subject to the route and site review. The river has 1.06 channel miles inside Junction, and 38 percent of the city is mapped as flood prone soils. For a crossing near Cedar Creek, we check US Army Corps of Engineers jurisdiction during planning in Junction.

Who runs Junction’s water system in Kimble County, and where does its water come from?

The City of Junction owns the public water system, and its source is surface water. The Junction system reports 1,636 service connections serving 2,700 people, figures we consider when planning underground work in Kimble County. Before a bore near that system, we expose marked utilities on the route so the drill can avoid lines whose position or depth is not clear from surface marks.

Does Trinity cover Menard and rural sites outside Junction?

Yes. We take work in Junction, nearby Menard and rural Texas sites outside the city limits. Menard is 29.6 miles north of Junction. Our main office is in Yukon, and Junction work is staffed by our crews and vetted partner drilling contractors rather than a local office.

How early should I request Texas811 marks for a Junction bore near Main Street?

Count back at least two working days from the planned start near Main Street, excluding Saturdays, Sundays and legal holidays. The request cannot be made more than 14 days before excavation. If the start slips more than 14 days past the original notice, submit a new request; have worn or moved marks refreshed through Texas811 before work continues.

What affects the cost of a Junction directional bore near Interstate 10?

The route, length, pipe or conduit size, soil, crossings, pits and access all affect the job. In Junction, clay rich Nuvalde soil can change the drilling plan, Interstate 10 pavement can add crossing requirements, and the 439 road miles from Yukon affect mobilization. A North Llano River crossing or emergency timing can also change the work involved.

Where the Junction facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Junction

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Junction, Texas

Type the address of your job in Junction. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Junction

All counties: Texas county list.