trinityboringsolutions.com

Kermit Texas Directional Boring: Wickett Soil, Highway 18 and Railway Track

Quick Answer: A utility route in Kermit may have to clear the Texas and New Mexico Railway track; Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Texas. Our Yukon, Oklahoma main office is 494 road miles away, so work near Texas State Highway 18 affects mobilization planning. The USDA soil survey maps Wickett soil across 93 percent of Kermit. Loamy fine sand can cave behind the drill, so crews manage the hole as they ream.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Kermit bores at a glance

  • County seat of Winkler County, Texas. Population 5,909 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 494 miles, about 9.8 hours of driving.
  • Ground: Wickett soil is mapped on 93 percent of the area, with cemented material about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Texas State Highway 18, Texas State Highway 302 and Texas State Highway 115. State permit office: TxDOT Odessa District.
  • Railroad track inside the boundary: Texas and New Mexico Railway, with 2 mapped street and rail crossings.
  • Public water: City of Kermit, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Does anyone do directional boring in Kermit near the Texas and New Mexico Railway?

Trinity Boring Solutions takes directional boring work in Kermit, Texas, for water, sewer, gas, electric conduit and fiber routes along streets such as Dallas Avenue. The Texas and New Mexico Railway track is a crossing to plan around. The Census Bureau Vintage 2024 estimate puts Kermit at 5,909 people, all within Winkler County.

Our main office is in Yukon, Oklahoma, and Kermit work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our range runs from 3/4 inch service lines to 48 inch casing, fitting a small service near Poplar Street or a long casing bore. We are a family business started 1965, with directional boring since 1982.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

How does Wickett soil affect a directional bore in Kermit?

Kermit’s mapped ground is predominantly Wickett soil, and that sandy profile calls for keeping the bore open as the pipe is readied. The USDA soil survey maps Wickett series across 93 percent of the city, with loamy fine sand at the surface across 93 percent. At about 40 inches below the surface, cemented material is mapped across 93 percent, while fine sandy loam accounts for 7 percent. Average clay content at that depth is 13 percent, and sandy texture is mapped across 7 percent. For Kermit planning, we treat mapped soil patterns as planning context, not as test borings.

USDA soil survey, inside the Kermit city limitsWhat is mapped
Soil series mappedWickett 93 percent, Pyote 4 percent and Kinco 3 percent
Texture at the surfaceloamy fine sand 93 percent, fine sand 4 percent and fine sandy loam 3 percent
Texture about 40 inches downcemented material 93 percent and fine sandy loam 7 percent
Engineering class about 40 inches downsilty sand (SM) 4 percent and silty clayey sand (SC SM) 3 percent
Average clay content about 40 inches down13 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

Bedrock is not mapped within the top five feet of Kermit, though that does not rule out rock deeper down. Seasonal water tables, flood prone soils and high steel corrosion risk are not mapped, which gives no mapped signal for wet pits, channel flooding or a steel corrosion concern. The USDA geology map shows Holocene Sand sheet deposits and Paleocene Cenozoic sedimentary rocks. The surface sand can cave behind the bit, so staged reaming and a ready pipe help limit the time an open hole sits.

How do crews handle cemented material in Kermit?

We plan a Kermit bore for the mapped Wickett sand and cemented material by tracking the drill, managing the hole and checking the route before pulling pipe. Dallas Avenue or another marked route still needs individual utility checks.

  1. Expose each marked utility on the proposed Kermit bore path with hydrovac before drilling near it; a locate mark near Dallas Avenue shows position, not depth.
  2. In Wickett’s loamy fine sand, build support in the bore and ream in stages because loose sand can fall in behind the drill head.
  3. With cemented material mapped at about 40 inches across most of Kermit, track depth and pitch through each rod rather than assuming the layer is uniform.
  4. Keep the pipe ready before the final ream on a Poplar Street route, then pull it while the bore remains open and stable.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

What is in the way of a new line in Kermit near Dallas Avenue?

Kermit has three state highways inside its limits: Texas State Highway 18, Texas State Highway 302 and Texas State Highway 115, with no other listed highway within 1.5 miles outside the city. A bore beside or across one of those routes needs a plan that accounts for the state highway right of way. Dallas Avenue is the longest named street at 1.84 miles in the city, followed by Poplar Street at 1.82 miles and Jim Sharp Boulevard at 1.55 miles. Those streets offer routes where locating and exposing existing lines matters before drilling.

CrossingTypeMapped extentWho has a say
Texas State Highway 18State highway3.9 roadway miles insideState highway office
Texas State Highway 302State highway2.5 roadway miles insideState highway office
Texas State Highway 115State highway2.1 roadway miles insideState highway office
Texas and New Mexico RailwayRailroad1.1 track miles insideThe railroad
Swipe the table sideways to see every column.

The Texas and New Mexico Railway has 1.1 track miles inside Kermit, and public mapping shows 2 street and rail crossings in the city. A route across that track needs coordination with its owner. No streams are mapped inside Kermit or within 1 mile outside its limits, and no lakes or ponds are mapped within 1 mile. With no mapped stream crossing to plan around, attention turns to the railroad and buried street utilities.

Who approves a Kermit bore in Winkler County?

For work in the right of way of Texas State Highway 18, 302 or 115, the line owner applies for the TxDOT utility permit through RULIS, and the TxDOT Odessa District reviews it. For utility work in Kermit, we prepare the bore plan and profile for the utility owner and work under its permit. Texas State Highway crossings beneath existing pavement use boring or tunneling, with casing and the required cover set by the applicable line type and permit. A crossing of the Texas and New Mexico Railway requires an agreement with the railroad owner; its terms set the crossing conditions. Kermit’s mapped record shows no stream crossings to plan for.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the Kermit water system and what about the City of Kermit?

The City of Kermit public water system is locally owned and draws from groundwater wells. Public records list 3,108 service connections serving 5,708 people, so a proposed water bore near Dallas Avenue should be checked against existing system lines. No city owned municipal electric system is identified. Oncor Electric Delivery Company and Texas-New Mexico Power report electric service in Winkler County; confirm the line owner for the specific address before planning a conduit bore.

Line ownerWhat it isSourceSize
City of KermitPublic water systemGroundwater wells3,108 connections, 5,708 people served
Oncor Electric Delivery Company and Texas-New Mexico PowerElectric utilities reporting service in Winkler CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

In Kermit, we use the American Community Survey 2019 to 2023 five year estimates: the median housing year was 1967, a planning consideration for underground work. For Kermit underground planning, we consider its housing age mix: 31 percent of homes were built before 1960, 56 percent from 1960 to 1999 and 13 percent in 2000 or later. That mix can mean either replacement work or a new service near Poplar Street. Along a Kermit bore path, we hydrovac pothole every marked utility before drilling near it; paint shows position, not depth.

Exposed underground utility line in a hand dug potholing pit before a directional bore in Oklahoma
An existing utility line exposed in a pothole before a directional bore in Oklahoma.

Do you cover Kermit and nearby Wink?

Kermit is the Winkler County seat, at 2,858 feet elevation, with 2.53 square miles of land and ZIP code 79745. Wink is 7.8 miles southwest; Monahans is 13.7 miles south; Wickett is 20.4 miles south; Thorntonville is 21.5 miles southeast; and Pyote is 21.9 miles south. West Odessa, the nearest larger city, is 34.8 miles east. From our Yukon, Oklahoma main office, Kermit is 494 road miles and a 9.8 hour drive, so distance affects mobilization and planning for local routes.

Places near Kermit

What would we bore near Poplar Street in Kermit?

  • Highway crossing: A route beneath Texas State Highway 18 is bored or tunneled, with the utility owner handling the TxDOT permit process.
  • Water service: A new service near the City of Kermit system needs a route checked against groundwater well lines and existing connections.
  • Fiber conduit: A run along Dallas Avenue can avoid cutting pavement when the route and existing utilities allow a bore.
  • Rail crossing: A utility route across the Texas and New Mexico Railway needs an agreement with the track owner before crossing work is planned.
  • Street replacement: A new water or sewer line near Poplar Street can follow a bore route that limits cuts through the street surface.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote work near Texas State Highway 18 in Kermit?

For a Kermit quote, start with the address or map pin, such as a point near Texas State Highway 18. Tell us what is going in the ground, such as water or fiber, then give the pipe or conduit size and footage. A sketch or plans help show the route, nearby streets and crossings before we scope the work.

A clear route on a Kermit street with few marked utilities is simpler to plan than a bore with several exposed lines. Length, pipe or conduit size, soil, crossings and pavement all affect the work. Wickett sand may need careful staged reaming; a Texas State Highway crossing adds permit planning, and the Texas and New Mexico Railway adds a separate crossing agreement. Pit work, excavator time, sand backfill, emergency scope and mobilization from Yukon also shape the job.

Questions people ask about boring in Kermit

Does Trinity take directional boring jobs in Kermit and Winkler County?

Yes, Trinity Boring Solutions takes directional boring work in Kermit and across Texas. Our crews are company crews, and work can also be supported from satellite yards run by drilling partners Trinity has vetted. You work with Trinity from the first call through the bore log, whether the site is near Dallas Avenue or elsewhere in Winkler County.

Who supplies electric service in Kermit and Winkler County, and who confirms conduit specs?

Oncor Electric Delivery Company and Texas-New Mexico Power report electric service in Winkler County, but that does not identify the provider at every Kermit address. Confirm the specific line owner before planning a conduit bore, and check the conduit requirements with that owner. For a route near Jim Sharp Boulevard, locate and expose existing lines before drilling.

Does the city or county control Jim Sharp Boulevard in Kermit, and must we cut it?

Jim Sharp Boulevard is a city street because Kermit is incorporated. A bore can pass beneath a street without cutting its surface, subject to the route and utility clearances. We expose marked utilities before drilling near them, so a proposed crossing on Jim Sharp Boulevard needs potholes where the bore path meets those marks.

How do Kermit’s older homes near Poplar Street affect replacement bores?

Kermit’s median housing year is 1967, and 31 percent of homes were built before 1960, according to American Community Survey 2019 to 2023 estimates. Older homes can mean replacement lines as well as new services, but the actual buried line must be located. Near Poplar Street, potholing helps confirm marked utilities before the drill approaches.

What ground does a Kermit bore pass through in Wickett soil?

The USDA soil survey maps Wickett soil across 93 percent of Kermit, with loamy fine sand mapped at the surface over the same share. At about 40 inches, cemented material is mapped across 93 percent. Loose sand can cave behind a bit, so staged reaming and a supported bore help crews prepare for pipe installation.

Will a Kermit bore hit rock below the mapped soil?

Bedrock is not mapped within the top five feet of Kermit, but that does not rule out deeper rock. The geology map shows Holocene Sand sheet deposits and Paleocene Cenozoic sedimentary rocks. A site specific bore plan still needs to account for what the drill encounters, rather than treating the map as a test boring.

How much 811 notice does a Kermit bore near Dallas Avenue need?

For a bore near Dallas Avenue, Texas811 needs the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. In Kermit, we plan around Texas811’s description of at least two working days. If work moves more than 14 days past the original notice, make a new request; refresh worn or moved marks through Texas811 before work continues.

How far is Kermit from Yukon, and does West Odessa change the job plan?

Kermit is 494 road miles and a 9.8 hour drive from our Yukon, Oklahoma main office; West Odessa is 34.8 miles east of Kermit. The Yukon distance affects mobilization planning, while West Odessa is a nearby larger place, not the work base. A route on Texas State Highway 302 still needs its own site and crossing review.

What affects the cost of a directional bore under Texas State Highway 18 in Kermit?

For Kermit boring, we base the price on the job scope, not footage alone. Length and pipe size matter, as do Wickett soil, marked utilities to expose, pavement, pits and any highway permit work. A Texas State Highway 18 crossing requires added planning, and a route far from Yukon affects mobilization. For Kermit projects, we allow high profile or emergency work to change the scope.

Where the Kermit facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Kermit

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Kermit, Texas

Type the address of your job in Kermit. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Kermit

All counties: Texas county list.