Kyle Texas Directional Boring: Heiden Soil, Interstate 35 and Plum Creek
Quick Answer: Heiden soil is clay rich and can grip a drill pipe, so a bore beneath Interstate 35 needs careful fluid control. Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Kyle, Texas, including routes beneath Interstate 35. Kyle is 422 road miles from our Yukon, Oklahoma main office, with Plum Creek among the local crossing points. The USDA soil survey maps clay across 53 percent of Kyle, where sticky cuttings call for staged reaming.
Kyle bores at a glance
- Incorporated city in Hays County, Texas. Population 65,833 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 422 miles, about 8.1 hours of driving.
- Ground: Heiden soil is mapped on 14 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 40 percent of the area.
- Highways inside the boundary: Interstate 35, RM 150, FM 1626, FM 2770 and Texas State Highway 21. State permit office: TxDOT Austin District.
- Railroad track inside the boundary: Union Pacific, with 8 mapped street and rail crossings.
- Named streams inside the boundary: Plum Creek, Blanco River, Bunton Branch and Clear Fork Plum Creek.
- Public water: City of Kyle, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near Plum Creek in Kyle?
We take directional boring work in Kyle, in Hays County, where the Census Bureau Vintage 2024 estimate puts the population at 65,833. Along streets such as Kohlers Crossing, our crews can install water, sewer, gas, electric conduit and fiber lines by bore. The route and size determine the setup, whether the line serves a property or continues beneath a road.
Our main office is in Yukon, Oklahoma, and Kyle work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, and we have done directional boring since 1982. Our 3/4 inch service line to 48 inch casing range can suit new development along Dacy Lane or replacement work near Plum Creek.

What kind of ground does Heiden soil mean for a Kyle bore?
The USDA soil survey maps Heiden across 14 percent of Kyle. It also maps clay at the surface across 53 percent of the city and silty clay across 17 percent. About 40 inches down, clay makes up 50 percent of mapped texture, and average clay content is 48 percent. We treat Kyle’s mapped patterns as planning context, not test borings, when considering a bore route. Clay can hold an open hole but stick to the reamer and grip pipe as it swells. A bore near Plum Creek still needs its route checked at the actual site.
| USDA soil survey, inside the Kyle city limits | What is mapped |
|---|---|
| Soil series mapped | Heiden 14 percent, Houston Black 14 percent, Real 10 percent, Austin 10 percent and Branyon 9 percent |
| Texture at the surface | clay 53 percent, silty clay 17 percent and gravelly loam 10 percent |
| Texture about 40 inches down | clay 50 percent, bedrock 39 percent and silty clay 5 percent |
| Engineering class about 40 inches down | fat clay (CH) 52 percent and lean clay (CL) 3 percent |
| Average clay content about 40 inches down | 48 percent |
| Bedrock mapped within 60 inches | 40 percent of the area (14 percent hard rock, 26 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 4 percent of the area |
| High corrosion risk for uncoated steel | 84 percent of the area |
Bedrock is mapped within 60 inches across 40 percent of Kyle, with typical depth at 20 inches; the map includes hard and weathered rock, so the drill plan may need to account for changing resistance. None is mapped for a seasonal water table within 60 inches, while flood prone soils cover 4 percent. High steel corrosion risk is mapped across 84 percent, a concern for casing and tracer wire that the line owner should address. The Cenozoic silty clay decomposition residuum and Late Cretaceous Austin Chalk map units point to clay and chalk conditions that can slow or redirect a bore.
What do we need to bore Kyle clay across the mapped patterns?
Kyle’s mapped clay can cling to the reamer and tighten around pipe. On a route near Heiden soil or Plum Creek, we adjust the fluid and reaming plan to the ground found along the bore.
- For Heiden soil and other clay mapped in Kyle, we use thinner fluid with polymer and ream in stages to limit sticky cuttings around the tool.
- On heavy clay routes near Plum Creek, we watch fluid returns closely so pressure does not lift pavement or disturb the surface.
- Before the drill approaches marked lines along Dacy Lane, we hydrovac pothole each utility; locate paint shows position but not burial depth.
- At a Kyle bore, a walkover locator follows the head from the surface while we record depth and pitch through each rod.

Where does a line have to go under Interstate 35 in Kyle?
Interstate 35 runs 14.0 mapped roadway miles inside Kyle, and RM 150, FM 1626 and FM 2770 add other state road routes to plan around. Dacy Lane is the longest named street at 3.16 miles in the city, followed by Old Stagecoach Road at 2.99 miles and Kohlers Crossing at 2.32 miles. A bore can pass below pavement instead of opening a cut across these routes, but the site plan must account for the road and its right of way.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 35 | Interstate | 14 roadway miles inside | State highway office |
| RM 150 | State highway | 7.8 roadway miles inside | State highway office |
| FM 1626 | State highway | 5.7 roadway miles inside | State highway office |
| FM 2770 | State highway | 2 roadway miles inside | State highway office |
| Texas State Highway 21 | State highway | 1 roadway miles inside | State highway office |
| FM 2001 | State highway | 0.2 roadway miles inside | State highway office |
| RM 967 | State highway | 0.2 roadway miles inside | State highway office |
| Union Pacific | Railroad | 7.89 track miles inside | The railroad |
| Plum Creek | Stream | 6.11 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Blanco River | Stream | 5.8 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Bunton Branch | Stream | 4.49 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Clear Fork Plum Creek | Stream | 0.14 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Porter Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Halifax Creek | Stream nearby | 0.1 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific has 7.89 track miles in Kyle, with 8 mapped street and rail crossings; a crossing of its track calls for an agreement with the railroad owner. Plum Creek runs 6.11 channel miles in the city, and the Blanco River runs 5.8. Kyle has 18 mapped street crossings of named streams. Those creek routes need planning for channel depth and a check for federal water jurisdiction.
Who approves a Kyle bore near Union Pacific track?
For a bore along Interstate 35, RM 150 or FM 1626, the line owner, not Trinity, applies for the TxDOT utility permit through RULIS. We give the owner a bore plan and profile, and the TxDOT Austin District reviews the application. TxDOT rules call for at least 60 inches of cover for electric and communication lines at highway crossings, and 60 inches for water lines; the permit may set another depth. A Union Pacific crossing needs an agreement with the railroad owner, while Plum Creek is checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Kyle system?
The City of Kyle public water system uses purchased surface water and reports 17,860 service connections serving 52,000 people. That network is a key nearby utility to locate before a bore along Dacy Lane or Kohlers Crossing. Hays County electric service reporting names City of San Marcos, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative. We confirm the line owner for the specific address before planning an electric conduit bore, since providers can vary by location.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Kyle | Public water system | Surface water bought from another system | 17,860 connections, 52,000 people served |
| City of San Marcos, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative | Electric utilities reporting service in Hays County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Kyle’s median housing year at 2009; 86 percent of units were built in 2000 or later, and 1 percent before 1960. Replacement bores can follow older buried routes, while newer services may extend along streets such as Old Stagecoach Road. At each marked crossing, we use hydrovac potholing to expose the line before drilling near it; paint shows position, not depth.

How far is Kyle from Austin and our Yukon office?
Kyle is an incorporated city in Hays County, at an elevation of 765 feet and covering 32.52 square miles. Across ZIP codes 78640, 78666 and 78610, we check the address before planning a boring route. Mountain City lies 3.2 miles north, Uhland 6.0 miles east, and Buda 6.2 miles north. San Marcos, the county seat, is 8.9 miles south; Austin is 22.4 miles north. Our Yukon, Oklahoma main office is 422 road miles away, an 8.1 hour drive, so distance can affect mobilization for work near Plum Creek.
Places near Kyle
- Directional boring in Mountain City: 3.2 miles north
- Directional boring in Uhland: 6 miles east
- Directional boring in Buda: 6.2 miles north
- Directional boring in Niederwald: 6.4 miles east
- Directional boring in Hays: 8.8 miles north
- Directional boring in Austin: 22.4 miles north
What boring work comes up along Dacy Lane in Kyle?
- Highway crossing: A route beneath Interstate 35 can keep pavement intact, with the bore plan accounting for highway right of way.
- Water service: A connection near Dacy Lane may tie into the City of Kyle system, so the existing line needs exposure before the drill approaches.
- Fiber route: Kohlers Crossing offers a named street corridor where conduit can pass below pavement rather than cut across it.
- Creek crossing: A route beneath Plum Creek needs depth planning and a jurisdiction check before work is laid out.
- Rail crossing: A bore beneath Union Pacific track needs the railroad owner’s agreement and its crossing conditions.
- Replacement bore: Near Old Stagecoach Road, a new route can replace a buried line without opening a trench across the street.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Kyle bore near Bebee Road?
A map pin near Bebee Road matters because a small route shift can change which utilities, pavement or drainage a bore encounters. For a Kyle estimate, send the address or pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans help us assess access and the route.
The job details shape the price. In Kyle, clay and possible chalk affect drilling time; the number of utilities to expose, pits, pavement and creek crossings affect the work plan. A route under Interstate 35 or Union Pacific track brings crossing requirements into the scope. Excavator time, sand backfill, emergency timing and the 422 road miles from Yukon also affect mobilization and logistics.
Questions people ask about boring in Kyle
Does Trinity take directional boring jobs in Kyle, Hays County?
Yes. We take directional boring work in Kyle and across Texas, including routes near Plum Creek and Interstate 35. Our own crews handle the work, and partner drilling contractors Trinity has vetted operate satellite yards when needed. From the first call through the bore log, we work with Trinity around Kyle city streets, regardless of the crew on site.
Who owns electric lines in Kyle, Hays County, and who confirms conduit specs?
Hays County electric service reporting lists City of San Marcos, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative. Even within 78640, we do not treat the ZIP code as identifying the provider at every Kyle address. The line owner confirms the conduit requirements for the specific route, such as one near Dacy Lane, before a conduit bore is planned.
Does Kyle control Kohlers Crossing, and can a bore avoid cutting the street?
Because Kyle is incorporated, we plan around its city streets, which belong to the city itself. A bore can pass beneath Kohlers Crossing without opening the pavement along the route. The exact method depends on the utilities and site conditions, which we check before drilling.
Are buried lines near Old Stagecoach Road old enough to need replacement bores in Kyle?
Some may be, but housing age does not establish the age of a buried line. The American Community Survey 2019 to 2023 estimates put the median Kyle housing year at 2009, with 1 percent of units built before 1960. A replacement route near Old Stagecoach Road needs utility locations and potholing before drilling.
Does Heiden soil in Kyle corrode steel, and what pipe should we use?
The USDA soil survey maps high steel corrosion risk across 84 percent of Kyle, so the line owner should consider casing and tracer wire materials. With Kyle clay, we recognize the soil corrosion concern, while HDPE remains unaffected by it. The owner selects any protective coating for steel, based on the line and site near Heiden soil.
What ground might a Kyle bore pass through near Heiden soil?
The USDA soil survey maps Heiden across 14 percent of Kyle and clay across 50 percent of mapped texture about 40 inches down. At that depth, bedrock is also mapped across 39 percent of the city. Those area patterns are not test borings, so the actual route near Heiden soil may need site specific planning.
How much Texas811 notice is needed for a bore near Dacy Lane in Kyle?
Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. Texas811 describes this as at least two working days. If a Dacy Lane start slips more than 14 days past the notice, make a new request; have worn or moved marks refreshed through Texas811 before work resumes.
How far is Kyle from the Yukon office, and does Austin make mobilization easier?
Kyle is 422 road miles and an 8.1 hour drive from our Yukon, Oklahoma main office. Austin is 22.4 miles north of Kyle, but that does not change the stated Yukon distance for mobilization. A job near Austin or Plum Creek is assessed by its route, access and equipment needs.
What affects the price of a directional bore near Interstate 35 in Kyle?
The route length, pipe or conduit size, clay or chalk, and utilities that need exposure all affect the scope. Pavement and Interstate 35 crossing conditions can add planning, as can Plum Creek drainage work, pits and excavator time. Mobilization from Yukon and any emergency or high profile requirements also factor into the job.
Where the Kyle facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Kyle
- U.S. Census Bureau, TIGER/Line 2024: Kyle boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Kyle
- U.S. Census Bureau, American Community Survey 2019 to 2023: Kyle housing units and year built
- Macrostrat geologic map compilation: map units under Kyle
- U.S. EPA Safe Drinking Water Information System: public water systems serving Kyle
- U.S. Department of Transportation, North American Rail Network: track owners in Hays County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Hays County
- U.S. Geological Survey, Elevation Point Query Service: Kyle elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Kyle
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Kyle
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Kyle, Texas
Type the address of your job in Kyle. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Kyle
Same county: San Marcos · Dripping Springs · Wimberley · Woodcreek · Bear Creek · Driftwood · Creedmoor · Belterra. All counties: Texas county list.