trinityboringsolutions.com

Windthorst Texas Directional Boring: Kamay Soil, US 281 and West Little Post Oak Creek

Quick Answer: We take directional boring, also called horizontal directional drilling (HDD), work in Windthorst, where US 281 and FM 174 provide road corridors to cross. Hoff Road is among the longest local streets, and Windthorst is 167 road miles from our Yukon, Oklahoma yard. Kamay soil is widespread, and clay mapped about 40 inches down can grip the pipe and build up on the reamer. West Little Post Oak Creek is 0.5 miles from the town limits, so a route there needs site specific planning.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Windthorst bores at a glance

  • Incorporated city in Archer County and Clay County, Texas. Population 353 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 167 miles, about 3.4 hours of driving.
  • Ground: Kamay soil is mapped on 38 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 26 percent of the area.
  • Highways inside the boundary: US 281, FM 174 and Texas State Highway 25. State permit office: TxDOT Wichita Falls District.
  • Railroad track inside the boundary: none mapped.
  • Public water: Windthorst Water Supply Corporation, surface water.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring near Hoff Road in Windthorst?

We take directional boring work in Windthorst, an incorporated town in Archer and Clay counties. The Census Bureau Vintage 2024 estimate puts the population at 353. We install water, sewer, gas, electric conduit and fiber, with routes that can follow or cross streets such as Hoff Road, Zotz Road and US 281, depending on the project.

Our main office is in Yukon, Oklahoma, and Windthorst work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have had no utility strike in over 25 years, a record that matters around Windthorst Water Supply Corporation lines and county electric service. Our family business began in 1965, and we have done directional boring since 1982.

Aerial view of a bore pit with drill rig and conduit alongside a directional drill rig and conduit on a concrete lot
Our crew at a bore pit beside the directional drill on a conduit job, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What is Kamay soil like to bore in Windthorst?

The USDA soil survey maps Kamay soil across 38 percent of Windthorst, with Kamay silt loam on 1 to 3 percent slopes mapped across 37 percent. At about 40 inches below the surface, clay is mapped under 70 percent of the area, and average clay content there is 41 percent. Sandy area is not mapped at that depth. These figures describe mapped soil patterns, not test borings. In the clay, the hole can stay open, but sticky cuttings can collect on a reamer and the ground can grip pipe.

USDA soil survey, inside the Windthorst city limitsWhat is mapped
Soil series mappedKamay 38 percent, Bluegrove 15 percent, Wichita 9 percent, Winters 8 percent and Tillman 6 percent
Texture at the surfacesilt loam 40 percent, fine sandy loam 22 percent and clay loam 15 percent
Texture about 40 inches downclay 70 percent, bedrock 19 percent and sandy clay 8 percent
Engineering class about 40 inches downlean clay (CL) 66 percent and fat clay (CH) 13 percent
Average clay content about 40 inches down41 percent
Bedrock mapped within 60 inches26 percent of the area (0 percent hard rock, 26 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils2 percent of the area
High corrosion risk for uncoated steel93 percent of the area

The USDA soil survey maps bedrock within 60 inches across 26 percent of Windthorst, and that mapped bedrock is weathered rather than hard. The Archer City Formation is Permian and includes mudstone, sandstone, siltstone and conglomerate, so a route may slow where it meets rock. Seasonal water table soils are not mapped. Flood prone soils cover 2 percent, while high steel corrosion risk covers 93 percent, a concern for uncoated casing and tracer wire that the line owner should address.

How do we bore Windthorst clay?

Kamay soil and the clay mapped about 40 inches down call for controlled fluid and staged reaming. Along Windthorst streets such as Hoff Road, we expose marked utilities before the drill approaches and track the head from the surface.

  1. In Kamay clay, we use a thinner drilling fluid with polymer and open the hole in stages so sticky cuttings do not crowd the reamer.
  2. Because clay can grip the pipe, we prepare the pipe before the final ream and pull it through the Windthorst bore the same day the hole is opened.
  3. Near paved streets such as Hoff Road, we watch fluid returns and keep pressure controlled to reduce the risk of lifting pavement.
  4. For a route toward West Little Post Oak Creek, we plan depth around the channel and check whether the crossing needs a jurisdiction review.
Open bore pit in red Oklahoma dirt with white PVC conduit stub ups and an orange safety barrier
An open bore pit in red Oklahoma dirt with PVC conduit stubbed up and a safety barrier around it.

What might a new Windthorst line cross near West Little Post Oak Creek?

US 281, FM 174 and Texas State Highway 25 run inside Windthorst; no other highway is mapped within 1.5 miles outside the town limits. A bore may also need to pass under local streets, including Hoff Road, the longest named street at 1.84 miles, Zotz Road at 1.52 miles, or Trojan Road at 0.98 miles. The 18.38 public road miles inside town give several possible routes, but the exact crossing and pavement determine where pits can fit.

CrossingTypeMapped extentWho has a say
US 281US highway2.9 roadway miles insideState highway office
FM 174State highway2 roadway miles insideState highway office
Texas State Highway 25State highway1.1 roadway miles insideState highway office
West Little Post Oak CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Windthorst or within one mile outside it, and public records show no mapped street and rail crossings. No named stream crosses the town limits either. West Little Post Oak Creek is 0.5 miles away, and 4.44 miles of unnamed drainage are mapped in town; no street crossings of named streams are mapped. A creek route calls for checking possible federal jurisdiction during planning, while drainage paths still need a suitable bore alignment.

Who approves a bore under US 281 in Windthorst?

At US 281, TxDOT cover depths set how far below the road a bore must run: electric and communication crossings need 60 inches below the lowest crossed grade, and water crossings need 60 inches; pressurized sewer crossings also need 60 inches. TxDOT Wichita Falls District reviews the utility permit for work in highway right of way. The utility owner submits through RULIS, while we prepare the bore plan and profile for that filing. TxDOT rules call for boring or tunneling under existing highway pavement, with rural crossings extending beneath all travel lanes. Windthorst streets are city streets, and a route near West Little Post Oak Creek is checked for possible Corps jurisdiction.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines in Archer County near Windthorst?

Windthorst Water Supply Corporation uses surface water and reports 576 service connections serving 1,728 people, so its lines may matter when planning work near US 281 or a local street. Electric providers reporting service in Archer County are AEP Texas North, Oncor Electric Delivery Company, Texas-New Mexico Power and Tri-County Electric Cooperative. Because providers can vary by address, the line owner is confirmed before an electric conduit bore is planned.

Line ownerWhat it isSourceSize
Windthorst Water Supply CorporationPublic water systemSurface water576 connections, 1,728 people served
AEP Texas North, Oncor Electric Delivery Company, Texas-New Mexico Power and Tri-County Electric CooperativeElectric utilities reporting service in Archer County and Clay CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Windthorst’s median housing year at 1979; 24 percent of homes were built before 1960 and 9 percent in 2000 or later. That mix can mean a job replaces older service or adds a new connection near Zotz Road. We expose each marked utility with hydrovac before drilling near it, since surface marks show position but not depth. If a route runs beneath Zotz Road, that crossing is an example of where potholing checks the marked lines first.

Exposed underground utility line in a hand dug potholing pit before a directional bore in Oklahoma
An existing utility line exposed in a pothole before a directional bore in Oklahoma.

Where is Windthorst in relation to Wichita Falls?

Windthorst covers 2.5 square miles in Archer County and Clay County, with 90 percent of its area in Archer County, at an elevation of 1,023 feet. The ZIP code is 76389. Scotland is 5.2 miles north, Archer City is 11.1 miles west and the county seat, and Wichita Falls is 23.4 miles north. Windthorst is 167 road miles and a 3.4 hour drive from our Yukon, Oklahoma yard, which affects mobilization planning for work on US 281 or Hoff Road.

Places near Windthorst

Which jobs call for a bore near Hoff Road in Windthorst?

  • Highway crossing: A water line beneath US 281 needs a planned bore profile and TxDOT review when the route uses highway right of way.
  • Street service: A new connection near Hoff Road can pass beneath pavement without cutting the street, with pits set in the dirt on each side.
  • Water line: Work near Windthorst Water Supply Corporation lines starts with locating and exposing marked utilities before the drill reaches the route.
  • Creek approach: A proposed line toward West Little Post Oak Creek needs a channel depth plan and a jurisdiction check during planning.
  • Drainage crossing: A route near one of Windthorst’s unnamed drainage paths needs alignment and pit planning around the mapped drainage.
  • Fiber conduit: A conduit route along Zotz Road needs the line owner identified and existing marked utilities exposed before drilling.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for work near Zihlman Road in Windthorst?

To price a bore near Zihlman Road, give us the address or map pin, what will go in the ground, the pipe or conduit size and the footage; a sketch or plans help. Tell us if the route approaches US 281 or a drainage path, since those details help us assess access and the crossing plan.

Kamay clay is the first pricing question because it can cling to the reamer and grip pipe, affecting the reaming plan and time. Length and pipe size set the basic scope; soil or rock, marked utilities to expose, pavement and creek or drainage crossings add work. A US 281 route may need highway permit planning, and the 167 road miles from Yukon affect mobilization. Pits, excavator time, sand backfill and emergency timing can also change the job.

Questions people ask about boring in Windthorst

Does Trinity Boring Solutions take Windthorst jobs in Archer County, and who staffs them?

Yes. We take directional boring work in Windthorst and handle the job from the first call through the bore log. Our own crews do the work, with support from satellite yards operated by partner drilling contractors we have vetted. That model applies to routes near US 281 as well as streets such as Hoff Road.

What do Windthorst homes near Zotz Road mean for replacement bores?

The American Community Survey 2019 to 2023 five year estimates give Windthorst a median housing year of 1979; 24 percent of homes were built before 1960. A replacement service near Zotz Road may involve older buried lines, while newer housing can call for a new connection. We expose marked utilities before drilling near them.

Does Kamay soil in Windthorst corrode steel, and what pipe can be used?

The USDA soil survey maps high steel corrosion risk across 93 percent of Windthorst, so uncoated steel casing and tracer wire need attention from the line owner. HDPE is not affected by that soil corrosion concern. Near Kamay soil, the selected pipe and any protective measures depend on the line owner’s specifications.

What ground does a bore pass through in Windthorst near Kamay soil?

The USDA soil survey maps Kamay soil across 38 percent of Windthorst. At about 40 inches below the surface, clay is mapped under 70 percent of the area and average clay content is 41 percent. That clay can keep an open hole but may stick to the reamer, so staged reaming and fluid control matter.

Is there rock under Windthorst, and how much bedrock is mapped?

Bedrock is mapped within five feet across 26 percent of Windthorst, and the mapped bedrock is weathered rather than hard. The Permian Archer City Formation includes mudstone, sandstone, siltstone and conglomerate. A bore near US 281 may slow at a soil to rock contact, even though hard bedrock is not mapped in the survey.

Who approves a Windthorst bore under US 281?

TxDOT Wichita Falls District reviews a utility permit for work in the US 281 right of way. The utility owner files through TxDOT’s RULIS system, and we supply the bore plan and profile for the application. A crossing beneath the existing highway pavement is installed by boring or tunneling, with cover set by the line type.

How far is Windthorst from Yukon via Wichita Falls, and does it affect a job?

Windthorst is 167 road miles and a 3.4 hour drive from our Yukon, Oklahoma yard. Wichita Falls is 23.4 miles north of Windthorst, but the Yukon distance can still affect mobilization for a job on Hoff Road or US 281. The route, equipment needs and scope help determine the impact.

How much 811 notice does a bore near Hoff Road in Windthorst need?

Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If a Hoff Road start slips more than 14 days past the original notice, submit a new request. Worn or moved marks must be refreshed through Texas811 before work continues.

What affects the cost of directional boring in Windthorst near US 281?

The price depends on the job scope, led first by the length, pipe or conduit size and Kamay clay conditions. The number of marked utilities to expose, pavement, creek or drainage crossings, pits and equipment time also matter. A US 281 permit route and mobilization from Yukon can add planning or travel demands; emergency timing can change the scope too.

Where the Windthorst facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Windthorst

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Windthorst, Texas

Type the address of your job in Windthorst. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Windthorst

Same county: Holliday · Megargel. All counties: Texas county list.