Directional Boring Contractors in Archer County, TX
Trinity Boring Solutions is a directional boring contractor serving Archer County, Texas, installing water, sewer, gas, electric and fiber lines without an open trench in Holliday, Archer City, Lakeside City, Scotland, Windthorst and Megargel. The Trinity main office in Yukon, Oklahoma is about 169 road miles from Archer City, the county seat. Bores here most often pass under US 281 and US 82 and the North Fork Little Wichita River. Call (405) 409-7423 any time.
Free Bore Planner
Plan Your Bore in Archer County, Texas
Type the address of your job in Archer County. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
What Should You Know Before Boring in Archer County?
Archer County covers 903 square miles, has about 9,155 residents and sits in the TxDOT Wichita Falls District.
| County seat | Archer City |
|---|---|
| Population | 9,155 (2024 Census estimate), up 7.0% since 2020 |
| Land area | 903 square miles |
| Largest cities and towns | Holliday (1,712), Archer City (1,642), Lakeside City (1,306), Scotland (438) and Windthorst (340) |
| TxDOT district | TxDOT Wichita Falls District |
| 811 center | Texas811 (call 811), two working days of notice |
| Electric utilities | AEP Texas North, Oncor Electric Delivery Company, Texas-New Mexico Power and Tri-County Electric Cooperative |
| Interstate and US highways | US 281, US 82 and US 277 |
| State Highways | 16, 25, 79 and 114 |
| Rivers | North Fork Little Wichita River, Middle Fork Little Wichita River, South Fork Little Wichita River, West Fork Trinity River, Little Wichita River and South Fork Trinity River |
| Creeks and other streams | Onion Creek, Holliday Creek, Kickapoo Creek, Briar Creek, Lake Creek, Dogwood Creek, Mesquite Creek and South Side Canal |
| Lakes | Lake Kickapoo, Lake Diversion, Lake Wichita and Lake Arrowhead |
| Railroads | No main line track |
| Average precipitation | 30.0 inches a year (1991 to 2020) |
| New housing units permitted | 21 in 2025 |
| Road distance from Trinity main office | About 169 miles from Yukon, Oklahoma to Archer City |
| Trinity insurance | General liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability |
Sources: Census Bureau (2024 population, 2025 building permits, TIGER/Line roads and water), EIA Form 861 (2025), NOAA 1991 to 2020 precipitation, federal rail network map, TxDOT districts, OpenStreetMap routing. Checked November 2026.
What Does a Bore Have to Cross in Archer County?
A bore in Archer County most often has to cross a highway such as US 281, US 82 or US 277 and a stream such as the North Fork Little Wichita River, the Middle Fork Little Wichita River or Onion Creek. State Highways 16, 25, 79 and 114 also run through the county. The Census map names 25 larger streams in Archer County, led by the North Fork Little Wichita River, the Middle Fork Little Wichita River, the South Fork Little Wichita River, the West Fork Trinity River, Onion Creek and Holliday Creek. The rest are Kickapoo Creek, Little Wichita River, Briar Creek, Lake Creek, Dogwood Creek, Mesquite Creek, South Side Canal, Panther Creek, West Little Post Oak Creek, Slippery Creek, Sloop Creek, Bluff Creek, Long Creek, Little Onion Creek, Plum Creek, South Fork Trinity River, Waters Branch, Darnell Branch and Wagon Branch. Lake Kickapoo, Lake Diversion, Lake Wichita and Lake Arrowhead are the main mapped lakes. There is no main line railroad in Archer County.

What Is the Ground Like for Directional Boring in Archer County?
Clay is the main thing to plan for in Archer County: the federal soil survey records a clay rich layer in the top five feet on about 70 percent of the county and bedrock within five feet on about 35 percent. Clay in Archer County swells and sticks when wet, so the drilling fluid is mixed to keep cuttings moving. May is the wettest month in Archer County at 4.0 inches on average and January the driest at 1.4. Archer County averages 30.0 inches of precipitation a year, so rain delays are occasional.
- Most common soils: Kamay (11%), Bluegrove (11%) and Wheatwood (8%).
- Surface texture: most often fine sandy loam (23%) or silt loam (19%).
- Bedrock within 5 feet: about 35% of the county. Most of it is soft, weathered rock.
- Clay rich layer (35% clay or more) in the top 5 feet: about 70% of the county.
Source: USDA Natural Resources Conservation Service, Soil Survey Geographic Database, Archer County, Texas (survey area TX009, version 25, September 3, 2026), through Web Soil Survey. Percentages are shares of mapped county area.
Who Permits a Bore in Archer County?
The TxDOT Wichita Falls District permits bores under state highways in Archer County, the Archer County Commissioners Court handles county roads, and Holliday, Archer City and Lakeside City each handle their own streets.
- State highways. US 281, US 82, US 277, the other numbered state routes and the farm to market roads in Archer County are on the state system. The utility owner files a TxDOT utility permit in RULIS.
- Texas811 locates. Texas811 needs at least two working days of notice before digging (Texas811 FAQ; Texas Utilities Code, Section 251.151).
- Water crossings. A bore under the North Fork Little Wichita River, the Middle Fork Little Wichita River, Onion Creek or Lake Kickapoo is checked for U.S. Army Corps of Engineers jurisdiction while the path is planned.
Statewide rules are on the Directional Boring Texas page, and Trinity supplies the bore plan and profile for the permit package.
Which Electric Utilities Serve Archer County?
AEP Texas North, Oncor Electric Delivery Company, Texas-New Mexico Power and Tri-County Electric Cooperative serve Archer County, according to 2025 filings with the U.S. Energy Information Administration. AEP Texas North, Oncor Electric Delivery Company and Texas-New Mexico Power are investor owned utilities; Tri-County Electric Cooperative is a member owned cooperative. The owner of the line sets the conduit size, depth and inspection steps, so it is confirmed before a conduit bore in Archer County is planned. More on electric line boring for electric cooperatives.
How Much New Construction Is There in Archer County?
Archer County permitted 21 new housing units in 2025, 12 of them single family homes, according to the Census Bureau Building Permits Survey. The population of Archer County went from 8,554 in 2020 to 9,155 in 2024, a gain of 7.0 percent. In Archer County that means steady work on service lines, rural extensions and road crossings.
Which Cities and Towns in Archer County Does Trinity Serve?
Trinity takes directional boring work in all 6 incorporated places in Archer County and at sites outside city limits, and Holliday is the largest with about 1,712 residents.
| City or town | 2024 population |
|---|---|
| Holliday | 1,712 |
| Archer City | 1,642 |
| Lakeside City | 1,306 |
| Scotland | 438 |
| Windthorst | 340 |
| Megargel | 178 |
Source: U.S. Census Bureau 2024 estimates, counting only the part of each city inside Archer County.
Archer County borders Baylor County, Clay County, Jack County, Throckmorton County, Wichita County, Wilbarger County and Young County; every county is on the Directional Boring in All 254 Texas Counties page. The neighboring county seats are Seymour (Baylor), Henrietta (Clay), Jacksboro (Jack), Throckmorton (Throckmorton), Wichita Falls (Wichita), Vernon (Wilbarger) and Graham (Young).
Which Directional Boring Services Are Available in Archer County?
Every Trinity service is available in Archer County: horizontal directional drilling from 3/4 inch service lines to 48 inch casing, auger boring, hydrovac potholing, trenching and 24 hour emergency response, all listed under Underground Utility and Boring Services.
- Road, highway, railroad, creek and river bore crossings, including US 281, US 82 and the North Fork Little Wichita River
- Drinkable water line boring and sewer force mains in Holliday or Archer City and on rural water systems
- Underground conduit in AEP Texas North and Oncor Electric Delivery Company territory, see electric line boring
- Fiber optic boring for ISPs and broadband builders along US 281
- Municipal boring services for cities such as Holliday, Archer City and Lakeside City
The free Bore Planner sizes an Archer County job before you call.
Archer County Directional Boring FAQs: What Do Customers Ask?
Does Trinity Boring Solutions work in Archer City, Texas?
Yes. Trinity Boring Solutions takes work in Holliday, Archer City, Lakeside City, Scotland, Windthorst and Megargel and the rural parts of Archer County. Trinity works in Texas with its own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted.
Who approves a bore under US 281 in Archer County?
The TxDOT Wichita Falls District. The utility owner files the permit in the TxDOT RULIS system. County roads go through the Archer County Commissioners Court and city streets through the city.
Is there rock in Archer County?
Yes, in places. The federal soil survey records bedrock within five feet of the surface on about 35 percent of Archer County, most of it soft, weathered rock. Potholing confirms it on the actual bore path.
Can a line be bored under the North Fork Little Wichita River in Archer County?
Yes. A drill is steered below the bed of the North Fork Little Wichita River from a pit on each bank and the pipe is pulled back through, so the channel is not opened. Federal jurisdiction over the crossing is checked first.
Is Trinity insured for work in Archer County?
Yes. Trinity Boring Solutions carries general liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability. Ask for a certificate with the quote.
How much does directional boring cost in Archer County?
A general range comes from the footage and the pipe size. Depth, the crossings and the ground set the number, and heavy clay is a factor on many Archer County jobs.
How Do You Get a Bore Quote in Archer County?
Call (405) 409-7423 any time or send the address in Archer County, the utility, the length and what it crosses. Trinity has bored since 1965 and is family owned.