trinityboringsolutions.com

Los Nopalitos Texas Directional Boring: Moglia Clay, US 59, Yegua Sandstone

Quick Answer: Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), beneath US 59 in Los Nopalitos, Texas. From our Yukon, Oklahoma main office, the 636 road miles to Los Nopalitos matter for a bore near Camino Peru. The USDA soil survey maps clay across 60 percent of the area at about 40 inches, where sticky cuttings can load a reamer. Los Fresnos is 0.2 miles southwest, giving a nearby point of reference for the work.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Los Nopalitos bores at a glance

  • Unincorporated community in Webb County, Texas. Population 49 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 636 miles, about 12.5 hours of driving.
  • Ground: Moglia soil is mapped on 39 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 38 percent of the area.
  • Highways inside the boundary: US 59. State permit office: TxDOT Laredo District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring beneath US 59 in Los Nopalitos?

We take directional boring work in Los Nopalitos, an unincorporated community in Webb County, where the longest named streets are Los Nopalitos, Camino Peru and Camino Bolivar, 2.12 public road miles are mapped inside the community, and US 59 runs through it. The Census Bureau counted 49 people in 2020. We can bore water, sewer, gas, electric conduit and fiber routes along these roads or beneath US 59.

Our main office is in Yukon, Oklahoma, and Los Nopalitos work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our record includes no utility strike in over 25 years; in Webb County, we plan around the electric lines reported for AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric Cooperative rather than assume an owner at a specific address. The family business began in 1965 and has done directional boring since 1982.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show about Moglia in Los Nopalitos?

The USDA soil survey maps Moglia, Maverick and Catarina soils across Los Nopalitos, with Moglia clay loam covering 39 percent of the mapped community. At about 40 inches below the surface, the survey maps clay across 60 percent and loam across 39 percent; the average clay content there is 39 percent. We use mapped Moglia, Maverick, and Catarina patterns for planning, not as substitutes for test borings in Los Nopalitos. Sticky clay can gather on a reamer and grip pipe, so the bore plan needs to account for the local texture rather than assume an easy pull.

USDA soil survey, inside the Los Nopalitos mapped community boundaryWhat is mapped
Soil series mappedMoglia 39 percent, Maverick 38 percent and Catarina 23 percent
Texture at the surfaceclay 60 percent and clay loam 39 percent
Texture about 40 inches downclay 60 percent and loam 39 percent
Engineering class about 40 inches downfat clay (CH) 60 percent and lean clay (CL) 39 percent
Average clay content about 40 inches down39 percent
Bedrock mapped within 60 inches38 percent of the area (0 percent hard rock, 38 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel99 percent of the area

Weathered bedrock is mapped within 60 inches across 38 percent of Los Nopalitos, with a typical mapped depth of 25 inches; hard bedrock is not mapped within that depth. Along US 59, we treat seasonal water tables and flood prone soils as unmapped conditions during boring plans. High steel corrosion risk covers 99 percent of the area, so the line owner should consider casing and tracer wire materials. The Yegua Formation, of Bartonian age, includes sandstone and clay; weathered sandstone can slow drilling, while a soil to rock change may affect steering.

How do we bore through clay along US 59 in Los Nopalitos?

For Los Nopalitos, the USDA map of clay across 60 percent of the area at about 40 inches calls for controlled fluid and careful reaming. We adjust the sequence to the ground and keep the planned route clear of marked lines along streets such as Camino Peru.

  1. Because clay is mapped across 60 percent of Los Nopalitos at about 40 inches, we use thinner drilling fluid with polymer and ream in stages to manage sticky cuttings.
  2. For heavy clay mapped in Los Nopalitos, we watch fluid returns near pavement so pressure does not lift the surface along roads such as Camino Peru.
  3. The Yegua Formation includes sandstone and clay, so a bore that meets weathered sandstone may need slower progress and close checks of steering.
  4. Before drilling near a marked utility on Camino Bolivar, we hydrovac pothole to establish depth, then track the drill head and log its depth and pitch.
Rock bit on the drill rod at the front of a Vermeer D24x40 S3 with broken sandstone at the entry of a rock bore in Guthrie, OK
Rock bit on the drill rod with broken sandstone at the entry of a rock bore in Guthrie, Oklahoma.

What could a bore cross on Los Nopalitos streets?

US 59 is the mapped highway crossing to plan around in Los Nopalitos, with 0.3 roadway miles inside the mapped community boundary and no other highway mapped within 1.5 miles outside it. The public street network covers 2.12 miles. Los Nopalitos is the longest named street at 0.6 miles, followed by Camino Peru at 0.57 miles and Camino Bolivar at 0.25 miles; Camino Guanajuato adds another named route. A bore can pass beneath pavement rather than cut across these streets.

No railroad is mapped inside Los Nopalitos or within 1 mile outside the community, so no track route is identified for a crossing plan. No mapped street and rail crossing appears here. Streams and lakes or ponds are also not mapped inside or within 1 mile of the community, and no street crossing of a named stream is identified. That leaves US 59 and the named streets as the mapped crossing features to assess for a proposed route.

Who approves a Los Nopalitos bore near Webb County roads?

Los Nopalitos has no city government, so public streets such as Camino Bolivar fall to the county, while work on US 59 right of way requires TxDOT approval. For electric and communication lines crossing US 59, TxDOT rules call for 60 inches of cover below the lowest crossed grade; water lines and pressurized sewer lines also need 60 inches at crossings. The line owner files the utility permit through TxDOT’s RULIS system, and the TxDOT Laredo District reviews it. We prepare the bore plan and profile for the owner’s filing and work under its permit.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities should we check before boring in Webb County in Los Nopalitos?

The water provider for a specific Los Nopalitos address has to be confirmed with the county or local water district before a bore is planned. EPA drinking water records do not tie systems to towns, and no system carries this place’s name, so the provider could not be matched. AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric Cooperative report service in Webb County; the electric line owner for the address must be confirmed before conduit specifications are set.

Line ownerWhat it isSourceSize
AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric CooperativeElectric utilities reporting service in Webb CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Housing figures are not published for a place as small as Los Nopalitos, so the available records do not show whether a route is an older pipe replacement or a new service. Long service runs and lines along Camino Peru or Camino Bolivar may affect the route. Webb County averages 21.0 inches of precipitation a year, with September averaging 3.9 inches and January 0.9 inches. Before drilling near a marked line, we hydrovac pothole it to find its depth; paint alone does not show depth.

Trinity Boring Solutions technician hydrovac daylighting along a commercial curbline during utility locating in Oklahoma City
Hydrovac daylighting along a commercial curb line in Oklahoma City to find the utilities before a bore.

Where is Los Nopalitos in relation to Los Fresnos?

Los Nopalitos is in Webb County, with Los Fresnos just 0.2 miles southwest and Los Arcos 0.5 miles southwest. The mapped community covers 0.15 square miles, sits at 605 feet elevation and uses ZIP code 78043. Laredo, the county seat and nearest larger city, is 17.8 miles west. From our Yukon, Oklahoma main office, the route is 636 road miles and a 12.5 hour drive, which is part of planning crew mobilization for a project near US 59.

Places near Los Nopalitos

What boring work might come up near Camino Bolivar in Los Nopalitos?

  • Highway crossing: A bore beneath US 59 can keep the existing pavement intact, with its route and cover planned for TxDOT review.
  • Water service: A line along Camino Peru needs its address specific water provider confirmed before we plan the connection.
  • Fiber conduit: A conduit route along Los Nopalitos street can avoid open cutting pavement, with marked utilities exposed before drilling nearby.
  • Sewer bore: A pressurized sewer crossing beneath US 59 needs a plan that accounts for the highway grade and required cover.
  • Street connection: A service bore near Camino Bolivar needs a route checked for existing lines before the drill approaches the street.
  • Electric conduit: Near Camino Guanajuato, the electric line owner needs to confirm conduit specifications for the particular address.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near US 59 in Los Nopalitos?

For a route near US 59 or Camino Peru, start with the address or map pin. Tell us what needs to go underground, such as water pipe or fiber conduit, then give the pipe or conduit size and footage. A sketch or plans help show where the bore meets pavement, existing lines or a property boundary in Los Nopalitos.

Moglia clay and the mapped clay share matter first because sticky cuttings can build on a reamer and slow the pull. The number of utilities to expose and pavement near US 59 also shape the plan, along with bore length, pipe size, pits, excavator time and sand backfill. Mobilization is another factor: Los Nopalitos is 636 road miles from our Yukon yard. At 636 road miles from our Yukon main office, we add planning for high profile or emergency work in Los Nopalitos.

Questions people ask about boring in Los Nopalitos

Does Trinity take directional boring work in Webb County’s Los Nopalitos?

Yes, we take directional boring work in Los Nopalitos, Webb County, and staff it with our crews or vetted partner contractor crews working from satellite yards. The customer works with Trinity through the bore log, regardless of which crew is at the site. For a route along Camino Peru, we plan around the address and marked utilities.

What is Moglia soil like for a bore in Los Nopalitos?

The USDA soil survey maps Moglia clay loam across 39 percent of Los Nopalitos, alongside Maverick and Catarina soils. At about 40 inches, clay covers 60 percent of the mapped area and loam 39 percent. That clay can stick to the reamer, so we plan staged reaming and fluid suited to the ground near streets such as Camino Peru.

How much bedrock is mapped near the surface in Los Nopalitos?

Weathered bedrock is mapped within 60 inches across 38 percent of Los Nopalitos, with a typical mapped depth of 25 inches. Hard bedrock is not mapped within that depth, which does not rule out rock deeper down. The Yegua Formation includes sandstone and clay, so a bore meeting weathered sandstone may progress more slowly.

Who approves a utility bore under US 59 in Los Nopalitos?

TxDOT reviews a utility permit for work in the US 59 right of way through its Laredo District. The utility owner submits the application in RULIS, and we prepare the bore plan and profile for that filing. Cover requirements depend on the line type and crossing, so a proposed US 59 route needs review for its specific utility.

Which Webb County electric company should I call about a Los Nopalitos conduit bore?

AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric Cooperative report electric service in Webb County, but that does not identify the owner at every Los Nopalitos address. Confirm the line owner for the Camino Bolivar route before settling conduit specifications. The owner can verify the required conduit details for that location.

Who is responsible for Camino Bolivar in Los Nopalitos, and must it be cut?

Los Nopalitos is unincorporated, so it has no city government; public streets such as Camino Bolivar are a county matter. A directional bore can pass below pavement rather than cut through the street, with entry and exit pits placed in dirt. The marked utilities along the proposed route still need to be exposed before drilling nearby.

What bore sizes and lengths can you handle near Camino Guanajuato in Los Nopalitos?

We handle work from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. Those ranges can fit different scopes near Camino Guanajuato, but the actual route depends on the line, ground and access. A sketch helps show how the proposed bore fits the street.

What notice and mark checks apply to a Los Nopalitos street bore on Los Nopalitos?

For a bore near the Los Nopalitos street, submit the Texas811 locate request at least 48 hours before excavation begins, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. For a US 59 start in Los Nopalitos, we submit a new request if work slips more than 14 days past the original notice. On Camino Bolivar, we refresh worn or moved marks through Texas811 before continuing the bore.

What affects the cost of a bore near US 59 in Los Nopalitos?

The scope sets the price, with ground and crossings important near US 59. Los Nopalitos clay can affect reaming, while marked utilities, pavement, bore length and pipe size change the work. Pits, excavator time, sand backfill and any creek or drainage crossing can also matter. Mobilization is a factor because the community is 636 road miles from our Yukon yard.

Where the Los Nopalitos facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Los Nopalitos

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Los Nopalitos, Texas

Type the address of your job in Los Nopalitos. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Los Nopalitos

Same county: Rio Bravo · El Cenizo · Ranchos Penitas West · Pueblo Nuevo · Bruni · Mirando City · Oilton · La Presa · San Carlos I · Colorado Acres · Ranchitos Las Lomas · San Carlos II. All counties: Texas county list.