Memphis Texas Directional Boring: Abilene Clay Loam, US 287, BNSF Railway

Quick Answer: Memphis is an incorporated county seat, so its city streets belong to the city; we use directional boring, also called horizontal directional drilling (HDD), to cross Boykin Drive without opening the street. US 287 is another route a bore may need to pass beneath. Our Yukon, Oklahoma main office is 222 road miles away, and BNSF Railway tracks add a separate crossing to plan. Abilene clay loam covers 65 percent of mapped soil, so sticky cuttings call for staged reaming. That ground can grip pipe if the open hole sits too long.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Memphis bores at a glance

  • County seat of Hall County, Texas. Population 2,041 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 222 miles, about 4.4 hours of driving.
  • Ground: Abilene soil is mapped on 65 percent of the area, with clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 16 percent of the area.
  • Highways inside the boundary: US 287, Texas State Highway 256, FM 2361, RM 2166 and FM 1547. State permit office: TxDOT Childress District.
  • Railroad track inside the boundary: BNSF Railway, with 6 mapped street and rail crossings.
  • Named streams inside the boundary: Parker Creek.
  • Public water: City of Memphis, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring near Boykin Drive in Memphis?

Memphis is an incorporated small city and the Hall County seat, so Boykin Drive and other city streets belong to the city. The Census Bureau Vintage 2024 estimate lists 2,041 residents. We install water and sewer lines, gas, electric conduit and fiber, routing them beneath or alongside named roads such as 9th Street according to the crossing plan.

Our main office is in Yukon, Oklahoma, and Memphis work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, and we have done directional boring since 1982, bringing that experience to Memphis planning. The 3/4 inch service line to 48 inch casing range covers utility work from a connection on Noel Street to a larger route near US 287.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What is the ground like for drilling in Memphis near Abilene soil?

The USDA soil survey maps Abilene soil across 65 percent of Memphis, chiefly Abilene clay loam on 0 to 1 percent slopes. At about 40 inches, clay loam makes up 88 percent of mapped texture, and average clay content there is 31 percent. Fine sandy loam appears at the surface in 18 percent of mapped area, while loam accounts for 16 percent. For Memphis planning, these are mapped patterns, not test borings, and should not be read as site specific results. The change from surface texture to clay loam at depth is a reason to check the actual route before setting fluid and reaming steps.

USDA soil survey, inside the Memphis city limitsWhat is mapped
Soil series mappedAbilene 65 percent, Veal 16 percent, Woodward 7 percent and Weymouth 7 percent
Texture at the surfaceclay loam 65 percent, fine sandy loam 18 percent and loam 16 percent
Texture about 40 inches downclay loam 88 percent and very fine sandy loam 7 percent
Engineering class about 40 inches downlean clay (CL) 92 percent and silt (ML) 3 percent
Average clay content about 40 inches down31 percent
Bedrock mapped within 60 inches16 percent of the area (0 percent hard rock, 16 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils1 percent of the area
High corrosion risk for uncoated steel65 percent of the area

The USDA soil survey maps bedrock within 40 inches across 16 percent of Memphis, with a typical depth of 26 inches in those mapped areas. Seasonal water table soils are not mapped, while flood prone soils account for 1 percent. High steel corrosion risk is mapped across 65 percent, so the line owner should consider casing and tracer wire materials; HDPE is not subject to that soil corrosion concern. The Cenozoic Lingos Formation includes sand, gravel, clay and silt, so ground can change along a bore. Guadalupian sedimentary rock is also mapped.

How do crews handle Memphis clay loam when drilling?

Memphis maps mostly Abilene clay loam, with Lingos Formation materials also recorded. We set fluid and reaming around the route, not just the map, and watch the drill path near US 287.

  1. In Abilene clay loam, use thinner fluid and staged reaming; sticky clay can gather on the reamer and grip pipe.
  2. With average clay content of 31 percent mapped at 40 inches, watch fluid returns and pull pipe the day the hole is opened.
  3. Where the Lingos Formation includes sand and gravel, stabilize the bore with fluid and staged reaming so loose material does not cave behind the bit.
  4. Near Parker Creek, hydrovac pothole every marked utility on the bore path before drilling near it; then track the head and log depth and pitch.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

Where might a line go under Parker Creek in Memphis?

US 287, Texas State Highway 256, FM 2361, RM 2166 and FM 1547 run within Memphis, so a route can involve state highway right of way as well as city streets. Boykin Drive is the longest named street at 2.61 miles in the city; 9th Street runs 1.99 miles and Noel Street 1.6 miles. Those road lengths do not define a bore route, but they show why the exact crossing point and available work area matter. A bore can keep pavement and driveways intact when the route and access allow it.

CrossingTypeMapped extentWho has a say
US 287US highway2.6 roadway miles insideState highway office
Texas State Highway 256State highway1.6 roadway miles insideState highway office
FM 2361State highway1 roadway miles insideState highway office
RM 2166State highway0.3 roadway miles insideState highway office
FM 1547State highway0.3 roadway miles insideState highway office
BNSF RailwayRailroad3.49 track miles insideThe railroad
Parker CreekStream0.08 channel miles insideChecked for Corps of Engineers jurisdiction
Berkley CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Jonah CreekStream nearby0.8 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

BNSF Railway has 3.49 track miles in Memphis, and public mapping shows 6 street and rail crossings in the city. A route near those tracks needs railroad coordination before the crossing plan is set. Parker Creek has 0.08 channel miles inside the city, but no street crossings of named streams are mapped. Berkley Creek runs along or touches the city boundary. No lakes or ponds are mapped within one mile, so the main water crossing question is the creek route.

Who handles permits for a Memphis bore under US 287?

For a crossing under US 287, electric and communication lines need at least 60 inches of cover below the lowest crossed grade; along the right of way, the minimum is 48 inches. Water lines need 60 inches at crossings and 36 inches along the right of way, while pressurized sewer crossings need 60 inches. TxDOT’s Childress District reviews the utility permit. The utility owner, not our crew, files through TxDOT’s online RULIS system, and we prepare the bore plan and profile for that filing. Existing highway pavement is bored or tunneled, with the bore extending beneath all travel lanes on rural highways. The permit may set a different depth.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Memphis and Hall County?

The City of Memphis public water system uses groundwater wells and has 1,022 service connections serving 2,290 people. A route from that system toward Boykin Drive may need to cross existing water or service lines. Electric utilities reporting service in Hall County are AEP Texas North, Southwestern Electric Power, Lighthouse Electric Cooperative and South Plains Electric Cooperative. We confirm the line owner for the specific address before planning an electric conduit bore, since the county list does not identify the provider at each property.

Line ownerWhat it isSourceSize
City of MemphisPublic water systemGroundwater wells1,022 connections, 2,290 people served
AEP Texas North, Southwestern Electric Power, Lighthouse Electric Cooperative and South Plains Electric CooperativeElectric utilities reporting service in Hall CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Memphis’s median housing year at 1955; 55 percent of units were built before 1960, 39 percent from 1960 to 1999 and 6 percent in 2000 or later. That mix can mean a replacement route near 9th Street differs from a new service connection. We hydrovac pothole each marked utility on the proposed path before drilling near it; paint shows position, not depth.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

Do you cover Memphis and nearby Hedley?

Memphis is the Hall County seat, at an elevation of 2,072 feet across 2.24 square miles, with ZIP code 79245. Lakeview is 9.6 miles southwest, Hedley is 11.8 miles northwest, Estelline is 13.7 miles southeast, Quail is 15.9 miles northeast and Lelia Lake is 17.6 miles northwest. Childress, the nearest larger city, is 25.0 miles southeast. Our Yukon, Oklahoma main office is 222 road miles away, a 4.4 hour drive; that distance is part of planning crew and equipment mobilization for a Memphis job.

Places near Memphis

What kinds of bores come up near 9th Street in Memphis?

  • Highway crossing: A bore under US 287 needs a route beneath the travel lanes, with cover and the utility owner’s TxDOT permit addressed in the plan.
  • Water service: A connection from the City of Memphis groundwater system may follow a property route off Noel Street and avoid cutting pavement.
  • Fiber conduit: A route along 9th Street can pass beneath driveways and pavement, with marked utilities exposed before drilling near them.
  • Creek crossing: A line near Parker Creek can be planned beneath the channel, with the water crossing checked for federal jurisdiction during planning.
  • Rail crossing: A route beneath BNSF Railway tracks requires an agreement with the track owner before casing, depth and flagging are set.
  • Electric conduit: Near Boykin Drive, confirm the address specific line owner before choosing the conduit route and arranging any highway right of way permit.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for work near BNSF Railway in Memphis?

For a Memphis quote, send the address or map pin, what will go underground, the pipe or conduit size and the footage; a sketch or plans help show the route near US 287 or BNSF Railway. That information lets us see where a crossing, work area or access point could change the plan before we price the scope.

A short service route in Abilene clay loam with no major crossings is simpler to plan than a longer run under US 287 or BNSF Railway. Length and pipe or conduit size matter, as do soil and rock, utilities that must be crossed and exposed, pavement, creek crossings and pit or excavator needs. Parker Creek may affect the crossing plan, while the 222 road miles from Yukon affect mobilization. In Memphis, high profile or emergency work can also change the scope of directional boring.

Questions people ask about boring in Memphis

Does Trinity take directional boring jobs in Hall County near Memphis, and who staffs them?

Yes. We take directional boring work in Memphis and across Texas, planning each project around its own underground conditions. Our crews handle the work, including jobs staffed from partner contractor satellite yards, and you work with Trinity from the first call through the bore log. The exact route, such as a crossing near Boykin Drive, guides the crew plan.

Can a line be bored under Parker Creek in Memphis?

A bore can be planned beneath Parker Creek, subject to the route and site conditions. The creek has 0.08 channel miles within Memphis, so the crossing location matters. During planning, the route is checked for U.S. Army Corps of Engineers jurisdiction, and the bore plan accounts for the channel.

Who runs Memphis’s public water system, and where does its water come from for underground work planning?

The City of Memphis owns the public water system, which draws from groundwater wells. Public records list 1,022 service connections serving 2,290 people. A bore connecting to that system near Noel Street still needs its route checked for existing water and other marked utilities.

Which electric utilities report service in Hall County near Memphis?

AEP Texas North, Southwestern Electric Power, Lighthouse Electric Cooperative and South Plains Electric Cooperative report electric service in Hall County. Those county records do not identify the provider at every Memphis address. We confirm the specific line owner before planning a conduit bore near a street such as 9th Street.

Who owns Noel Street in Memphis, and does a bore require cutting it?

Noel Street is a city street because Memphis is incorporated. Directional boring can pass beneath pavement without an open cut when the route and access support it. The crossing plan for Noel Street still depends on the utilities, road conditions and work space at the specific location.

How old are homes and buried lines near 9th Street in Memphis?

The American Community Survey 2019 to 2023 estimates give Memphis a median housing year of 1955, with 55 percent of units built before 1960. Older areas may involve replacement lines, while newer connections have different route needs. Near 9th Street, marked utilities must be exposed before the drill approaches.

How much Texas811 notice does a bore along Boykin Drive in Memphis need?

Request a Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If the start slips more than 14 days past the original notice for Boykin Drive, make a new request. Before work continues in Memphis, we have worn or moved marks refreshed through Texas811.

How far is Memphis from Yukon, and does being near Childress change the job?

We plan Memphis work around the 222 road miles and 4.4 hour drive from our Yukon, Oklahoma main office. Childress is 25.0 miles southeast and is the nearest larger city. The distance from Yukon can affect crew and equipment mobilization for work near a local route such as US 287.

What affects the cost of a directional bore beneath US 287 in Memphis?

The job scope sets the price: bore length, pipe or conduit size, Abilene clay loam, utilities to cross and expose, pavement, pits and equipment time all matter. A US 287 crossing adds highway planning, while a Parker Creek route can add water crossing considerations. Distance from Yukon also affects mobilization.

Where the Memphis facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Memphis

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Memphis, Texas

Type the address of your job in Memphis. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Memphis

Same county: Turkey. All counties: Texas county list.