trinityboringsolutions.com

Lakeview Texas Directional Boring: Miles Fine Sandy Loam, Texas State Highway 256, Oaks Creek

Quick Answer: Texas State Highway 256 is the main highway crossing in Lakeview, and we do directional boring, also called horizontal directional drilling (HDD), in Texas. Lewis Street is part of the local route picture, and Lakeview is 232 road miles from our Yukon, Oklahoma main office. The USDA soil survey maps Miles fine sandy loam at the surface and sandy clay loam about 40 inches down. That lower texture calls for controlled fluid and staged reaming along Lakeview streets.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Lakeview bores at a glance

  • Incorporated city in Hall County, Texas. Population 60 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 232 miles, about 4.6 hours of driving.
  • Ground: Miles soil is mapped on 62 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Texas State Highway 256. State permit office: TxDOT Childress District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring near Oaks Creek in Lakeview?

We take directional boring work in Lakeview, Hall County, where the Census Bureau Vintage 2024 estimate puts the population at 60. For a route along Lewis Street or Davenport Street, we install water, sewer, gas, electric conduit and fiber lines by bore, with the route and line owner shaping the plan. Lakeview’s small street network makes the address and intended path useful from the first call.

Our main office is in Yukon, Oklahoma, and Lakeview work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. At 232 road miles from our Yukon main office, Lakeview travel factors into scheduling; our family business began in 1965, and we have done directional boring since 1982. That experience covers work from a small service line to larger casing, useful for planning a Lewis Street service or a Texas State Highway 256 crossing.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What do Miles soils indicate beneath Lakeview?

The USDA soil survey maps Miles soil across 62 percent of Lakeview and Altus across 38 percent. The mapped surface texture is fine sandy loam throughout the town. At about 40 inches below the surface, the survey maps sandy clay loam throughout, with average clay content of 27 percent. These are mapped patterns, not test borings, so a specific route near Lewis Street still needs field checks. The sandy clay loam can hold together more than loose sand, but clay can cling to tooling and grip a pipe during pullback.

USDA soil survey, inside the Lakeview city limitsWhat is mapped
Soil series mappedMiles 62 percent and Altus 38 percent
Texture at the surfacefine sandy loam 100 percent
Texture about 40 inches downsandy clay loam 100 percent
Engineering class about 40 inches downclayey sand (SC) 100 percent
Average clay content about 40 inches down27 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

Bedrock is not mapped in the top five feet of Lakeview, which does not rule out rock deeper down. The survey also maps no seasonal water table within 60 inches, no flood prone soils and no high steel corrosion risk. The geologic map shows the Lingos Formation, Cenozoic, with sand, gravel, clay and silt, and Guadalupian sedimentary rock of Permian age. A bore near Oaks Creek still needs route specific depth planning; mapped soil conditions do not establish what a drill will meet at every depth.

How do crews bore Lakeview’s sandy clay loam?

On a Lewis Street route, we first compare the plan with locates and access for the entry and exit pits. The sandy clay loam mapped below Lakeview’s surface texture guides fluid control and reaming choices.

  1. On a Lewis Street path, we compare the planned bore with utility marks first, then hydrovac expose each marked line before bringing the drill close.
  2. For the sandy clay loam mapped about 40 inches down, we keep fluid suited to the ground and ream in stages so clay does not build on the tooling.
  3. At Texas State Highway 256, we track the drill head from the surface and log depth and pitch as the bore advances beneath the roadway.
  4. If the route reaches Oaks Creek, we plan depth beneath the channel and check jurisdiction during planning; entry and exit pits stay on the bankside ground.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

What might a bore cross in Lakeview near Texas State Highway 256?

Texas State Highway 256 runs 0.6 mapped roadway miles inside Lakeview, so a route under its pavement needs a bore or tunnel rather than an open trench. The longer named local streets include Lewis Street at 0.44 miles, Davenport Street at 0.43 miles and Shoe Bar Street at 0.39 miles. Main Street is also mapped within town. These short street segments still need route planning around pavement, driveways and existing lines; a street bore can leave the surface uncut when the pits fit on each side.

CrossingTypeMapped extentWho has a say
Texas State Highway 256State highway0.6 roadway miles insideState highway office
Oaks CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Lakeview or within one mile outside its limits, so no local track crossing is identified. Oaks Creek runs along or touches the town boundary, but no named stream crossing by a street is mapped inside Lakeview. We have no mapped lakes or ponds within one mile of Lakeview, while nearby Oaks Creek is a water feature to account for in bore planning. If a proposed route reaches Oaks Creek, we check the crossing during planning for possible U.S. Army Corps of Engineers jurisdiction and set the bore path to suit the channel.

Who approves a Lakeview bore in Hall County?

Lakeview is incorporated, so Lewis Street, Davenport Street and other city streets are under city authority; the fact that a street is public does not by itself mean it must be cut for a bore. For work in the right of way of Texas State Highway 256, TxDOT’s Childress District reviews the utility permit through its RULIS system. The utility that owns the line submits the application, while we prepare the bore plan and profile and work under the owner’s permit. Oaks Creek routes are checked during planning for federal waterway jurisdiction. No railroad crossing is mapped locally.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns utility lines in Hall County near Lakeview?

The water provider for a specific Lakeview address has to be confirmed with the city, Hall County or the local water district before a bore is planned; available records do not match a provider to each address. Electric service reported in Hall County includes AEP Texas North, Southwestern Electric Power, Lighthouse Electric Cooperative and South Plains Electric Cooperative. Those reports do not identify the electric line owner on every street, so we confirm the owner before planning conduit and pothole marked lines along a Lewis Street route.

Line ownerWhat it isSourceSize
AEP Texas North, Southwestern Electric Power, Lighthouse Electric Cooperative and South Plains Electric CooperativeElectric utilities reporting service in Hall CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Lakeview’s median housing year at 1940; 79 percent of homes were built before 1960, and 21 percent from 1960 to 1999. An older Lewis Street service may be a replacement, while a new Davenport Street connection needs its own route check. We hydrovac pothole each marked utility on the planned path before drilling near it, since surface marks show position but not depth.

Trinity Boring Solutions technician hydrovac daylighting along a commercial curbline during utility locating in Oklahoma City
Hydrovac daylighting along a commercial curb line in Oklahoma City to find the utilities before a bore.

What places are near Lakeview and Hedley?

Lakeview is an incorporated town in Hall County at an elevation of 2,121 feet, covering 0.21 square miles. ZIP code 79239 serves the town. Memphis, the county seat, is 9.6 miles northeast; Hedley is 13.6 miles north, and Lelia Lake is 16.3 miles north. Estelline is 17.0 miles southeast, while Clarendon is 21.3 miles northwest. Childress, the nearest larger city, is 28.7 miles southeast. The Yukon yard is 232 road miles away, a 4.6 hour drive, which factors into mobilization for a Lewis Street project.

Places near Lakeview

What kinds of bores fit Lakeview routes near Davenport Street?

  • Highway crossing: A bore beneath Texas State Highway 256 can keep the existing roadway intact, with the utility owner handling the TxDOT permit.
  • Water service: A proposed Lewis Street water connection needs its address specific provider confirmed before we plan the bore and expose nearby marked lines.
  • Sewer replacement: Along Davenport Street, a replacement route can pass beneath pavement instead of opening a trench through the street.
  • Fiber conduit: A Shoe Bar Street conduit bore needs a checked route and potholes at marked utilities before the drill approaches them.
  • Creek crossing: If a Lakeview project crosses Oaks Creek, the route needs channel depth planning and a jurisdiction check during planning.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a Lakeview bore near Lewis Street?

For a Lewis Street quote, give us the address or map pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans help us see how the proposed path meets a driveway or other street. For a Texas State Highway 256 route, include the crossing limits so we can consider the right of way in the plan.

Price follows the route and scope, not just its length. The 232 road miles from Yukon affect mobilization, while Miles soil and the sandy clay loam mapped below it inform drilling and reaming. A Texas State Highway 256 crossing adds permit and bore planning. We also account for line exposure, pavement or concrete, creek or drainage crossings, pits, excavator time, sand backfill and whether the work is high profile or an emergency.

Questions people ask about boring in Lakeview

Does Trinity take directional boring work in Lakeview, Hall County, and who staffs it?

Yes. We take work in Lakeview and serve the town with our crews or from satellite yards operated by partner drilling contractors we have vetted. For a Lakeview crossing of Texas State Highway 256, we keep bore log details clear for any crew handling the work. A Lewis Street address and route sketch help us plan the work.

Which electric company serves my Lakeview address in Hall County, and who confirms conduit size?

County reports name AEP Texas North, Southwestern Electric Power, Lighthouse Electric Cooperative and South Plains Electric Cooperative, but they do not establish which one serves a particular Lakeview address. We confirm the line owner before planning conduit. For a route on Davenport Street, provide the conduit purpose and size so the owner can confirm specifications.

Who controls Lakeview streets such as Shoe Bar Street, and does a bore cut them?

Shoe Bar Street is a city street because Lakeview is incorporated. A bore can pass beneath pavement without opening a trench through the street, provided the route and pit locations suit the job. For a crossing of Texas State Highway 256, the state highway right of way has a separate TxDOT permit process.

Could old buried lines near Lakeview’s Davenport Street need replacement?

They may. The American Community Survey 2019 to 2023 estimates place Lakeview’s median housing year at 1940, with 79 percent of homes built before 1960. That age makes replacement work a practical possibility, but it does not date any particular buried line. We pothole marked utilities along Davenport Street before drilling near them.

What ground should I expect in Lakeview’s Miles soil?

The USDA soil survey maps Miles soil across 62 percent of Lakeview, with fine sandy loam at the surface and sandy clay loam about 40 inches down. The mapped clay content averages 27 percent at that depth. Clay in the mix can cling to tooling, so staged reaming and timely pipe pullback help manage the hole.

Will a Lakeview bore hit rock below the streets?

Bedrock is not mapped in Lakeview’s top five feet, but that does not rule out deeper rock. The geologic map shows the Cenozoic Lingos Formation and Permian Guadalupian sedimentary rock. A Lewis Street plan still needs field conditions and the required bore depth checked rather than assuming the mapped surface soils continue unchanged.

Does Trinity cover Lakeview, Memphis and rural sites between them?

We take work in Texas, including Lakeview and rural routes outside town limits. Memphis is 9.6 miles northeast of Lakeview, and a job there or along the connecting rural area is considered from its own route and scope. The Yukon yard is 232 road miles away, so distance is part of mobilization planning.

How early should I request locates for a Lakeview bore along Lewis Street?

Texas law requires a Texas811 locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If a Lewis Street start slips more than 14 days past the original notice, submit a new request. Along Lewis Street in Lakeview, we refresh worn or shifted marks through Texas811 before work resumes.

What affects the cost of a Lakeview bore under Texas State Highway 256?

The route, footage, pipe or conduit size, ground, utility crossings and access all affect the price. Texas State Highway 256 adds right of way planning, and Miles soil informs the drilling approach. The 232 road miles from Yukon affect mobilization; pavement, pits, creek crossings, excavator time and emergency timing can also change the work required.

Where the Lakeview facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Lakeview

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Lakeview, Texas

Type the address of your job in Lakeview. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Lakeview

County: Val Verde County directional boring. Same county: Turkey · Del Rio · Cienegas Terrace · Val Verde Park · Laughlin AFB · Amistad · Box Canyon. All counties: Texas county list.