Nash Texas Directional Boring: Eylau Sandy Clay Loam, Interstate 30, Wagner Creek
Quick Answer: Eylau soil and sandy clay loam shape work near Interstate 30. Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Nash, Texas, for crossings beneath its roads and tracks. Our Yukon, Oklahoma main office is 322 road miles from New Boston Road in Nash. At about 40 inches, sandy clay loam is mapped across 49 percent of the area, while clay can hold and grip the bore.
Nash bores at a glance
- Incorporated city in Bowie County, Texas. Population 4,208 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 322 miles, about 6.3 hours of driving.
- Ground: Eylau soil is mapped on 43 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Interstate 30, US 82, FM 989, FM 2148 and FM 2878. State permit office: TxDOT Atlanta District.
- Railroad track inside the boundary: Texas Northeastern Railroad and Dallas, Garland and Northeastern Railroad, with 6 mapped street and rail crossings.
- Named streams inside the boundary: Wagner Creek.
- Public water: City of Nash, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring in Nash, Bowie County?
Trinity Boring Solutions takes directional boring jobs in Nash, an incorporated city in Bowie County with a Census Bureau Vintage 2024 estimate of 4,208 people. Along New Boston Road or Alumax Drive, a bore can carry water, sewer, gas, electric conduit or fiber beneath pavement and driveways, avoiding an open cut across the surface.
Our main office is in Yukon, Oklahoma, and Nash work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. From a 3/4 inch service line near Nash Elementary School to casing up to 48 inches for a crossing near Interstate 30, our range covers small and large work. Trinity is a family business started in 1965, and we have done directional boring since 1982.

What does the USDA soil survey show about Eylau soil in Nash?
The USDA soil survey maps Eylau soil across 43 percent of Nash, with Eylau very fine sandy loam on 39 percent of the mapped area. Sawyer soil accounts for 29 percent, and Sacul for 11 percent. At about 40 inches below the surface, sandy clay loam is mapped under 49 percent of the area and clay under 40 percent. The average clay content at that depth is 33 percent. Clay can stay in the hole but may stick to the reamer and grip pipe, so staged reaming and fluid control matter.
| USDA soil survey, inside the Nash city limits | What is mapped |
|---|---|
| Soil series mapped | Eylau 43 percent, Sawyer 29 percent, Sacul 11 percent, Amy 4 percent and Adaton 4 percent |
| Texture at the surface | very fine sandy loam 43 percent, silt loam 38 percent and fine sandy loam 16 percent |
| Texture about 40 inches down | sandy clay loam 49 percent, clay 40 percent and loam 4 percent |
| Engineering class about 40 inches down | lean clay (CL) 50 percent, fat clay (CH) 40 percent and silt (ML) 6 percent |
| Average clay content about 40 inches down | 33 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 95 percent of the area |
| Flood prone soils | 8 percent of the area |
| High corrosion risk for uncoated steel | 92 percent of the area |
For Nash bores, the USDA survey does not map bedrock within the top five feet, though that does not rule out deeper rock. A seasonal water table is mapped within 40 inches across 95 percent of the area, so pits near Wagner Creek may need pumping. Flood prone soils cover 8 percent, calling for depth planning at creek crossings. High steel corrosion risk is mapped across 92 percent, a concern for uncoated casing and tracer wire. The mapped Midway Group, undivided, is Paleocene clay, silt and sand; changing materials can affect steering.
How do we drill Nash ground with sandy clay loam?
At Nash sites mapped with sandy clay loam and clay, we manage the hole so sticky cuttings do not load the reamer or grip the pipe. The USDA map guides planning, while the actual route and exposed utilities guide the work.
- On Eylau soil near New Boston Road, we use controlled fluid and staged reaming to manage clay that can cling to the reamer and pipe.
- Where Nash soil is mapped as heavy clay, we watch fluid returns near pavement so pressure does not lift slabs along Alumax Drive.
- With the seasonal water table mapped within 40 inches across 95 percent of Nash, we keep pits small and pump them if water collects.
- At Wagner Creek, we plan the bore below the channel and check the drill path with a walkover locator, logging depth and pitch.

Which roads, tracks or creeks can a Nash bore cross near Texas Northeastern Railroad?
Interstate 30 has 1.1 mapped roadway miles inside Nash, while US 82 has 3.0. FM 989, FM 2148 and FM 2878 also run within the city limits. US 59 and US 67 lie just outside the limits, so a route toward them may involve a different road authority. New Boston Road is the longest named street in Nash at 2.5 miles, followed by Alumax Drive at 1.73 miles and Farm Road 2148 at 1.61 miles. A bore can pass beneath pavement and driveways rather than cutting through them.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 30 | Interstate | 1.1 roadway miles inside | State highway office |
| US 82 | US highway | 3 roadway miles inside | State highway office |
| FM 989 | State highway | 1.6 roadway miles inside | State highway office |
| FM 2148 | State highway | 1.6 roadway miles inside | State highway office |
| FM 2878 | State highway | 0.7 roadway miles inside | State highway office |
| US 59 | Highway nearby | 0.4 miles outside | State highway office |
| US 67 | Highway nearby | 0.7 miles outside | State highway office |
| Texas Northeastern Railroad | Railroad | 2.98 track miles inside | The railroad |
| Dallas, Garland and Northeastern Railroad | Railroad | 0.58 track miles inside | The railroad |
| Wagner Creek | Stream | 1.35 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Wagoner Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Howard Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| Waggoner Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
The Texas Northeastern Railroad has 2.98 track miles in Nash, and the Dallas, Garland and Northeastern Railroad has 0.58. Public mapping shows 6 street and rail crossings in the city. Each railroad crossing needs an agreement from the railroad that owns that track. Wagner Creek runs for 1.35 channel miles inside Nash, and one mapped street crossing intersects a named stream. A creek route needs depth planning, and its jurisdiction is checked during planning.
Who has to sign off on a Nash bore near Interstate 30?
Interstate 30, US 82, FM 989, FM 2148 and FM 2878 are state routes in Nash. Work in their right of way needs a TxDOT utility permit reviewed by the TxDOT Atlanta District. The utility owner, not the drilling contractor, files through RULIS; we provide the bore plan and profile and work under the utility owner’s permit. For a line crossing the Texas Northeastern Railroad, the railroad that owns the track sets terms through its crossing agreement. A Wagner Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. City streets such as New Boston Road belong to Nash because the city is incorporated.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried near the City of Nash water system?
The City of Nash public water system serves 3,818 people through 1,976 service connections and uses purchased surface water. For conduit work along Alumax Drive, the line owner needs to be confirmed before the bore is planned. Utilities reporting electric service in Bowie County include Southwestern Electric Power, Bowie-Cass Electric Cooperative and Southwest Arkansas Electric Cooperative. The specific electric line owner can vary by address, so we confirm ownership before a conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Nash | Public water system | Surface water bought from another system | 1,976 connections, 3,818 people served |
| Southwestern Electric Power, Bowie-Cass Electric Cooperative and Southwest Arkansas Electric Cooperative | Electric utilities reporting service in Bowie County | EIA Form 861 | Confirm the line owner by address |
With Nash’s median housing year at 1992 in American Community Survey 2019 to 2023 five year estimates, we consider existing homes in underground work planning. The survey estimates 10 percent of housing was built before 1960 and 37 percent in 2000 or later. That mix can mean replacement lines near older homes as well as new services along Alumax Drive. Before drilling near either, we hydrovac marked utilities to expose their depth; paint alone does not show how deep a line sits.

Where is Nash in relation to Texarkana and our Yukon office?
Nash is an incorporated city in Bowie County, at an elevation of 342 feet and covering 4.47 square miles. Across Nash ZIP codes 75501 and 75569, we consider the local area when planning underground work. Wake Village is 1.7 miles south, Texarkana is 2.9 miles east, and Red Lick is 3.0 miles northwest. Texarkana is the nearest larger city, while New Boston, the county seat, is 16.4 miles west. From our Yukon, Oklahoma yard, Nash is 322 road miles away and a 6.3 hour drive, which can affect mobilization for work near Interstate 30.
Places near Nash
- Directional boring in Wake Village: 1.7 miles south
- Directional boring in Texarkana: 2.9 miles east
- Directional boring in Red Lick: 3 miles northwest
- Directional boring in Leary: 4.6 miles west
- Directional boring in Hooks: 8.9 miles west
What kinds of bores come up near Farm Road 2148 in Nash?
- Highway crossing: A bore beneath Interstate 30 can carry water or conduit without an open cut through the paved travel lanes.
- Water service: A connection near the City of Nash system can run beneath a driveway along New Boston Road.
- Fiber route: Fiber conduit along Farm Road 2148 can pass beneath pavement and marked utilities after those lines are exposed.
- Creek crossing: A Wagner Creek bore needs a route planned below the channel and a check for federal waterway jurisdiction.
- Rail crossing: A route beneath the Texas Northeastern Railroad needs an agreement with that track owner before the crossing is built.
- Electric conduit: Near Alumax Drive, we confirm the electric line owner and expose marked utilities before drilling close to them.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near New Boston Road in Nash?
For a New Boston Road job, send the address or a map pin to show where the bore starts. Tell us what will go in the ground, such as water line or fiber conduit, then give the pipe or conduit size and footage. A sketch or plans help us see nearby streets, driveways and crossings.
Nash pricing starts with the ground and route: sandy clay loam, sticky clay and the number of utilities to expose shape the drilling plan. Pavement near Interstate 30, a Texas Northeastern Railroad crossing or Wagner Creek adds crossing work. Pipe size, bore length, pits, excavator time and sand backfill also affect the scope. Mobilization matters because Nash is 322 road miles from Yukon. Emergency or high profile work can change the plan too.
Questions people ask about boring in Nash
Does Trinity Boring Solutions take directional boring work in Nash, Bowie County, and who staffs it?
Yes. We take directional boring work in Nash, Bowie County, using our own crews or crews from partner contractors we have vetted. The Yukon office remains the point of contact from the first call through the bore log, including work along New Boston Road or near the Texas Northeastern Railroad.
Can a line be bored beneath Wagner Creek in Nash?
A bore can be planned beneath Wagner Creek, subject to the route and ground conditions. The creek has 1.35 channel miles inside Nash, so depth must stay beneath the channel. During planning, the crossing is checked for U.S. Army Corps of Engineers jurisdiction, and the route is reviewed for marked utilities.
As we plan underground work in Nash, who owns its public water system, and where does its purchased surface water come from?
Because the City of Nash owns the system and uses purchased surface water, we account for that utility context when planning underground work. Serving 3,818 people through 1,976 service connections, Nash’s public water system is a factor we consider when planning underground work. For a water line bore near New Boston Road, we still need the proposed route and line size to plan around existing buried utilities.
Which electric utility owns a Nash line in Bowie County, and who confirms conduit specs?
Electric service reported in Bowie County includes Southwestern Electric Power, Bowie-Cass Electric Cooperative and Southwest Arkansas Electric Cooperative. The owner at a particular Nash address must be confirmed before planning a conduit bore. We use the confirmed line owner’s specifications for conduit work near Alumax Drive.
Who controls Farm Road 2148 in Nash, and does a bore require cutting the street?
Since Nash is incorporated and its streets belong to the city, we account for city street ownership when considering underground work. Farm Road 2148 is a state route, and work in its right of way needs a TxDOT utility permit. Directional boring can pass beneath the road without cutting the pavement; the permit and bore plan govern the crossing.
How old are homes and buried lines near Alumax Drive in Nash, and what does that mean for replacement bores?
Nash’s median housing year is 1992, according to the American Community Survey 2019 to 2023 five year estimates. That does not establish the age of each buried line, but older properties near Alumax Drive may need replacement work. We expose marked utilities before the drill approaches them.
How much notice does Texas811 need for a Nash bore near New Boston Road, and what if marks fade?
For a New Boston Road bore, submit the Texas811 locate request at least 48 hours, or two working days, before excavation, excluding Saturdays, Sundays and legal holidays. Do not submit it earlier than 14 days before the start. If the start slips more than 14 days past the original notice, request another ticket; worn or moved marks must be refreshed before work continues.
How far is Nash from Trinity’s Yukon office, and does Texarkana change the job plan?
Nash is 322 road miles and a 6.3 hour drive from our Yukon, Oklahoma main office. Texarkana is 2.9 miles east of Nash, but that does not change the distance for crew mobilization. We consider travel alongside the route, soil and crossings when scoping work near Interstate 30.
What affects the cost of a directional bore near Interstate 30 in Nash?
The route and ground lead the estimate: clay, sandy clay loam, utility exposures and pavement near Interstate 30 affect the work. A Texas Northeastern Railroad or Wagner Creek crossing can add planning and crossing requirements. Pipe size, footage, pits, excavator time, backfill and mobilization from Yukon also shape the job scope.
Where the Nash facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Nash
- U.S. Census Bureau, TIGER/Line 2024: Nash boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Nash
- U.S. Census Bureau, American Community Survey 2019 to 2023: Nash housing units and year built
- Macrostrat geologic map compilation: map units under Nash
- U.S. EPA Safe Drinking Water Information System: public water systems serving Nash
- U.S. Department of Transportation, North American Rail Network: track owners in Bowie County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Bowie County
- U.S. Geological Survey, Elevation Point Query Service: Nash elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Nash
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Nash
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Nash, Texas
Type the address of your job in Nash. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Nash
Same county: New Boston · De Kalb · Maud · Redwater. All counties: Texas county list.
