trinityboringsolutions.com

Nash Texas Directional Boring: Eylau Sandy Clay Loam, Interstate 30, Wagner Creek

Quick Answer: Eylau soil and sandy clay loam shape work near Interstate 30. Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Nash, Texas, for crossings beneath its roads and tracks. Our Yukon, Oklahoma main office is 322 road miles from New Boston Road in Nash. At about 40 inches, sandy clay loam is mapped across 49 percent of the area, while clay can hold and grip the bore.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Nash bores at a glance

  • Incorporated city in Bowie County, Texas. Population 4,208 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 322 miles, about 6.3 hours of driving.
  • Ground: Eylau soil is mapped on 43 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Interstate 30, US 82, FM 989, FM 2148 and FM 2878. State permit office: TxDOT Atlanta District.
  • Railroad track inside the boundary: Texas Northeastern Railroad and Dallas, Garland and Northeastern Railroad, with 6 mapped street and rail crossings.
  • Named streams inside the boundary: Wagner Creek.
  • Public water: City of Nash, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring in Nash, Bowie County?

Trinity Boring Solutions takes directional boring jobs in Nash, an incorporated city in Bowie County with a Census Bureau Vintage 2024 estimate of 4,208 people. Along New Boston Road or Alumax Drive, a bore can carry water, sewer, gas, electric conduit or fiber beneath pavement and driveways, avoiding an open cut across the surface.

Our main office is in Yukon, Oklahoma, and Nash work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. From a 3/4 inch service line near Nash Elementary School to casing up to 48 inches for a crossing near Interstate 30, our range covers small and large work. Trinity is a family business started in 1965, and we have done directional boring since 1982.

Directional drill rig and crew working on a street beside a brick commercial building
Our drill and crew set up on a street beside a brick commercial building. Photos on this page are from our jobs in Oklahoma and Texas.

What does the USDA soil survey show about Eylau soil in Nash?

The USDA soil survey maps Eylau soil across 43 percent of Nash, with Eylau very fine sandy loam on 39 percent of the mapped area. Sawyer soil accounts for 29 percent, and Sacul for 11 percent. At about 40 inches below the surface, sandy clay loam is mapped under 49 percent of the area and clay under 40 percent. The average clay content at that depth is 33 percent. Clay can stay in the hole but may stick to the reamer and grip pipe, so staged reaming and fluid control matter.

USDA soil survey, inside the Nash city limitsWhat is mapped
Soil series mappedEylau 43 percent, Sawyer 29 percent, Sacul 11 percent, Amy 4 percent and Adaton 4 percent
Texture at the surfacevery fine sandy loam 43 percent, silt loam 38 percent and fine sandy loam 16 percent
Texture about 40 inches downsandy clay loam 49 percent, clay 40 percent and loam 4 percent
Engineering class about 40 inches downlean clay (CL) 50 percent, fat clay (CH) 40 percent and silt (ML) 6 percent
Average clay content about 40 inches down33 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches95 percent of the area
Flood prone soils8 percent of the area
High corrosion risk for uncoated steel92 percent of the area

For Nash bores, the USDA survey does not map bedrock within the top five feet, though that does not rule out deeper rock. A seasonal water table is mapped within 40 inches across 95 percent of the area, so pits near Wagner Creek may need pumping. Flood prone soils cover 8 percent, calling for depth planning at creek crossings. High steel corrosion risk is mapped across 92 percent, a concern for uncoated casing and tracer wire. The mapped Midway Group, undivided, is Paleocene clay, silt and sand; changing materials can affect steering.

How do we drill Nash ground with sandy clay loam?

At Nash sites mapped with sandy clay loam and clay, we manage the hole so sticky cuttings do not load the reamer or grip the pipe. The USDA map guides planning, while the actual route and exposed utilities guide the work.

  1. On Eylau soil near New Boston Road, we use controlled fluid and staged reaming to manage clay that can cling to the reamer and pipe.
  2. Where Nash soil is mapped as heavy clay, we watch fluid returns near pavement so pressure does not lift slabs along Alumax Drive.
  3. With the seasonal water table mapped within 40 inches across 95 percent of Nash, we keep pits small and pump them if water collects.
  4. At Wagner Creek, we plan the bore below the channel and check the drill path with a walkover locator, logging depth and pitch.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

Which roads, tracks or creeks can a Nash bore cross near Texas Northeastern Railroad?

Interstate 30 has 1.1 mapped roadway miles inside Nash, while US 82 has 3.0. FM 989, FM 2148 and FM 2878 also run within the city limits. US 59 and US 67 lie just outside the limits, so a route toward them may involve a different road authority. New Boston Road is the longest named street in Nash at 2.5 miles, followed by Alumax Drive at 1.73 miles and Farm Road 2148 at 1.61 miles. A bore can pass beneath pavement and driveways rather than cutting through them.

CrossingTypeMapped extentWho has a say
Interstate 30Interstate1.1 roadway miles insideState highway office
US 82US highway3 roadway miles insideState highway office
FM 989State highway1.6 roadway miles insideState highway office
FM 2148State highway1.6 roadway miles insideState highway office
FM 2878State highway0.7 roadway miles insideState highway office
US 59Highway nearby0.4 miles outsideState highway office
US 67Highway nearby0.7 miles outsideState highway office
Texas Northeastern RailroadRailroad2.98 track miles insideThe railroad
Dallas, Garland and Northeastern RailroadRailroad0.58 track miles insideThe railroad
Wagner CreekStream1.35 channel miles insideChecked for Corps of Engineers jurisdiction
Wagoner CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Howard CreekStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Waggoner CreekStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

The Texas Northeastern Railroad has 2.98 track miles in Nash, and the Dallas, Garland and Northeastern Railroad has 0.58. Public mapping shows 6 street and rail crossings in the city. Each railroad crossing needs an agreement from the railroad that owns that track. Wagner Creek runs for 1.35 channel miles inside Nash, and one mapped street crossing intersects a named stream. A creek route needs depth planning, and its jurisdiction is checked during planning.

Who has to sign off on a Nash bore near Interstate 30?

Interstate 30, US 82, FM 989, FM 2148 and FM 2878 are state routes in Nash. Work in their right of way needs a TxDOT utility permit reviewed by the TxDOT Atlanta District. The utility owner, not the drilling contractor, files through RULIS; we provide the bore plan and profile and work under the utility owner’s permit. For a line crossing the Texas Northeastern Railroad, the railroad that owns the track sets terms through its crossing agreement. A Wagner Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. City streets such as New Boston Road belong to Nash because the city is incorporated.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried near the City of Nash water system?

The City of Nash public water system serves 3,818 people through 1,976 service connections and uses purchased surface water. For conduit work along Alumax Drive, the line owner needs to be confirmed before the bore is planned. Utilities reporting electric service in Bowie County include Southwestern Electric Power, Bowie-Cass Electric Cooperative and Southwest Arkansas Electric Cooperative. The specific electric line owner can vary by address, so we confirm ownership before a conduit bore.

Line ownerWhat it isSourceSize
City of NashPublic water systemSurface water bought from another system1,976 connections, 3,818 people served
Southwestern Electric Power, Bowie-Cass Electric Cooperative and Southwest Arkansas Electric CooperativeElectric utilities reporting service in Bowie CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

With Nash’s median housing year at 1992 in American Community Survey 2019 to 2023 five year estimates, we consider existing homes in underground work planning. The survey estimates 10 percent of housing was built before 1960 and 37 percent in 2000 or later. That mix can mean replacement lines near older homes as well as new services along Alumax Drive. Before drilling near either, we hydrovac marked utilities to expose their depth; paint alone does not show how deep a line sits.

Exposed underground utility line in a hand dug potholing pit before a directional bore in Oklahoma
An existing utility line exposed in a pothole before a directional bore in Oklahoma.

Where is Nash in relation to Texarkana and our Yukon office?

Nash is an incorporated city in Bowie County, at an elevation of 342 feet and covering 4.47 square miles. Across Nash ZIP codes 75501 and 75569, we consider the local area when planning underground work. Wake Village is 1.7 miles south, Texarkana is 2.9 miles east, and Red Lick is 3.0 miles northwest. Texarkana is the nearest larger city, while New Boston, the county seat, is 16.4 miles west. From our Yukon, Oklahoma yard, Nash is 322 road miles away and a 6.3 hour drive, which can affect mobilization for work near Interstate 30.

Places near Nash

What kinds of bores come up near Farm Road 2148 in Nash?

  • Highway crossing: A bore beneath Interstate 30 can carry water or conduit without an open cut through the paved travel lanes.
  • Water service: A connection near the City of Nash system can run beneath a driveway along New Boston Road.
  • Fiber route: Fiber conduit along Farm Road 2148 can pass beneath pavement and marked utilities after those lines are exposed.
  • Creek crossing: A Wagner Creek bore needs a route planned below the channel and a check for federal waterway jurisdiction.
  • Rail crossing: A route beneath the Texas Northeastern Railroad needs an agreement with that track owner before the crossing is built.
  • Electric conduit: Near Alumax Drive, we confirm the electric line owner and expose marked utilities before drilling close to them.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near New Boston Road in Nash?

For a New Boston Road job, send the address or a map pin to show where the bore starts. Tell us what will go in the ground, such as water line or fiber conduit, then give the pipe or conduit size and footage. A sketch or plans help us see nearby streets, driveways and crossings.

Nash pricing starts with the ground and route: sandy clay loam, sticky clay and the number of utilities to expose shape the drilling plan. Pavement near Interstate 30, a Texas Northeastern Railroad crossing or Wagner Creek adds crossing work. Pipe size, bore length, pits, excavator time and sand backfill also affect the scope. Mobilization matters because Nash is 322 road miles from Yukon. Emergency or high profile work can change the plan too.

Questions people ask about boring in Nash

Does Trinity Boring Solutions take directional boring work in Nash, Bowie County, and who staffs it?

Yes. We take directional boring work in Nash, Bowie County, using our own crews or crews from partner contractors we have vetted. The Yukon office remains the point of contact from the first call through the bore log, including work along New Boston Road or near the Texas Northeastern Railroad.

Can a line be bored beneath Wagner Creek in Nash?

A bore can be planned beneath Wagner Creek, subject to the route and ground conditions. The creek has 1.35 channel miles inside Nash, so depth must stay beneath the channel. During planning, the crossing is checked for U.S. Army Corps of Engineers jurisdiction, and the route is reviewed for marked utilities.

As we plan underground work in Nash, who owns its public water system, and where does its purchased surface water come from?

Because the City of Nash owns the system and uses purchased surface water, we account for that utility context when planning underground work. Serving 3,818 people through 1,976 service connections, Nash’s public water system is a factor we consider when planning underground work. For a water line bore near New Boston Road, we still need the proposed route and line size to plan around existing buried utilities.

Which electric utility owns a Nash line in Bowie County, and who confirms conduit specs?

Electric service reported in Bowie County includes Southwestern Electric Power, Bowie-Cass Electric Cooperative and Southwest Arkansas Electric Cooperative. The owner at a particular Nash address must be confirmed before planning a conduit bore. We use the confirmed line owner’s specifications for conduit work near Alumax Drive.

Who controls Farm Road 2148 in Nash, and does a bore require cutting the street?

Since Nash is incorporated and its streets belong to the city, we account for city street ownership when considering underground work. Farm Road 2148 is a state route, and work in its right of way needs a TxDOT utility permit. Directional boring can pass beneath the road without cutting the pavement; the permit and bore plan govern the crossing.

How old are homes and buried lines near Alumax Drive in Nash, and what does that mean for replacement bores?

Nash’s median housing year is 1992, according to the American Community Survey 2019 to 2023 five year estimates. That does not establish the age of each buried line, but older properties near Alumax Drive may need replacement work. We expose marked utilities before the drill approaches them.

How much notice does Texas811 need for a Nash bore near New Boston Road, and what if marks fade?

For a New Boston Road bore, submit the Texas811 locate request at least 48 hours, or two working days, before excavation, excluding Saturdays, Sundays and legal holidays. Do not submit it earlier than 14 days before the start. If the start slips more than 14 days past the original notice, request another ticket; worn or moved marks must be refreshed before work continues.

How far is Nash from Trinity’s Yukon office, and does Texarkana change the job plan?

Nash is 322 road miles and a 6.3 hour drive from our Yukon, Oklahoma main office. Texarkana is 2.9 miles east of Nash, but that does not change the distance for crew mobilization. We consider travel alongside the route, soil and crossings when scoping work near Interstate 30.

What affects the cost of a directional bore near Interstate 30 in Nash?

The route and ground lead the estimate: clay, sandy clay loam, utility exposures and pavement near Interstate 30 affect the work. A Texas Northeastern Railroad or Wagner Creek crossing can add planning and crossing requirements. Pipe size, footage, pits, excavator time, backfill and mobilization from Yukon also shape the job scope.

Where the Nash facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Nash

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Nash, Texas

Type the address of your job in Nash. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Nash

Same county: New Boston · De Kalb · Maud · Redwater. All counties: Texas county list.