Red Lick Texas Directional Boring: Ruston Fine Sandy Loam, FM 2148 and Rain Creek
Quick Answer: At FM 2148, what does the soil survey show in the top five feet, and what lies below? We do directional boring, also called horizontal directional drilling (HDD), for crossings along FM 2148 in Red Lick. The city is 321 road miles from our Yukon, Oklahoma main office, with Rain Creek among the local crossing considerations. Ruston soil and sandy clay loam below the surface can make the hole sticky, so drilling fluid and staged reaming matter.
Red Lick bores at a glance
- Incorporated city in Bowie County, Texas. Population 930 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 321 miles, about 6.4 hours of driving.
- Ground: Ruston soil is mapped on 40 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: FM 2148 and FM 3419. State permit office: TxDOT Atlanta District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Rain Creek and Waggoner Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring along Farm Road 2148 in Red Lick?
At Farm Road 2148, what does the soil survey show in the top five feet, and what lies below? Red Lick has fine sandy loam at the surface and sandy clay loam mapped below, while bedrock is not mapped in the top five feet. The Census Bureau Vintage 2024 estimate puts the population at 930. We install water, sewer, gas, electric conduit and fiber along streets such as Farm Road 2148.
Our main office is in Yukon, Oklahoma, and Red Lick work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For a small service run on Farm Road 2148, our work ranges down to 3/4 inch lines; a larger project can involve 48 inch casing. We are a family business that began in 1965, and directional boring has been part of our work since 1982, including work in Texas.

How does Ruston soil affect drilling in Red Lick?
The USDA soil survey maps Ruston soil across 40 percent of Red Lick and Eylau across 34 percent. Ruston fine sandy loam, on 3 to 8 percent slopes, covers 37 percent of the mapped area. At the surface, fine sandy loam accounts for 44 percent and very fine sandy loam for 34 percent. About 40 inches down, sandy clay loam is mapped under 76 percent of the area, with clay under 15 percent. Those textures can change how the bore holds and how fluid returns.
| USDA soil survey, inside the Red Lick city limits | What is mapped |
|---|---|
| Soil series mapped | Ruston 40 percent, Eylau 34 percent, Sawyer 7 percent, McKamie 6 percent and Thenas 3 percent |
| Texture at the surface | fine sandy loam 44 percent, very fine sandy loam 34 percent and silt loam 9 percent |
| Texture about 40 inches down | sandy clay loam 76 percent and clay 15 percent |
| Engineering class about 40 inches down | clayey sand (SC) 40 percent, lean clay (CL) 39 percent and fat clay (CH) 15 percent |
| Average clay content about 40 inches down | 29 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 49 percent of the area |
| Flood prone soils | 3 percent of the area |
| High corrosion risk for uncoated steel | 46 percent of the area |
Bedrock is not mapped in the top five feet of Red Lick, though that does not rule out rock deeper down. A seasonal water table is mapped within 60 inches in 49 percent of the area, so pits near Rain Creek may need pumping. Flood prone soils cover 3 percent, calling for care with channel depth and creek planning. High steel corrosion risk is mapped in 46 percent. The geologic map identifies the Midway Group, undivided, of Paleocene age; soil survey patterns are not test borings.
How do we bore through sandy clay loam in Red Lick?
The USDA survey maps sandy clay loam below much of Red Lick, including ground near FM 2148. We match fluid, reaming and pit plans to the ground and the crossing, rather than treating every stretch alike.
- Where sandy clay loam is mapped about 40 inches down in Red Lick, we use a thinner fluid mix and staged reaming to limit sticky buildup on the reamer.
- With seasonal water tables mapped within 60 inches across 49 percent of Red Lick, we plan compact pits and pumping, especially near Rain Creek.
- Before drilling near a marked utility along Farm Road 2148, we hydrovac pothole to expose it; paint shows position, not depth.
- On a bore near Farren Road, we track the drill head from the surface and log its depth and pitch as it advances.

What is in the way of a new line along FM 2148 in Red Lick?
FM 2148 runs 2.6 mapped roadway miles inside Red Lick, and FM 3419 adds 0.1 mile. Interstate 30 runs along or touches the city limits, while US 82 is 0.8 miles away. Farm Road 2148 is the longest named street inside the city at 1.68 miles. Farren Road runs 0.8 miles, Quail Hollow 0.79 miles and Myrtle Springs Road 0.74 miles. A bore route can use these names to locate the proposed line and identify which road authority may be involved.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 2148 | State highway | 2.6 roadway miles inside | State highway office |
| FM 3419 | State highway | 0.1 roadway miles inside | State highway office |
| Interstate 30 | Highway nearby | Runs along or touches the city limits | State highway office |
| US 82 | Highway nearby | 0.8 miles outside | State highway office |
| Texas Northeastern Railroad | Railroad nearby | 0.8 miles outside | The railroad |
| Rain Creek | Stream | 0.37 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Waggoner Creek | Stream | 0.17 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Barkman Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| Jones Creek | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Red Lick, but the Texas Northeastern Railroad is 0.8 miles outside the city limits; no street and rail crossings are mapped in the city. Rain Creek runs 0.37 channel miles inside Red Lick and Waggoner Creek runs 0.17 miles. One mapped street crossing of a named stream is present. Barkman Creek is 0.2 miles outside the limits. No lakes or ponds are mapped within one mile, so creek and drainage conditions matter more than lake crossings here.
Who approves a bore near Red Lick in Bowie County?
Red Lick is incorporated, so its city streets belong to the city itself. For work in the right of way of FM 2148, FM 3419, Interstate 30 or US 82, the line owner, not our drilling crew, submits the utility permit through TxDOT’s RULIS system. The TxDOT Atlanta District reviews it, and we provide the bore plan and profile for the utility owner’s filing. TxDOT’s cover rules set highway crossing depths of 60 inches for electric and communication lines and water lines, and for pressurized sewer lines. A different depth may be set in the permit. A crossing near the Texas Northeastern Railroad needs an agreement with the railroad owner; Rain Creek is checked for federal jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already in the ground in Red Lick, Bowie County?
The water provider for an address near Farm Road 2148 has to be confirmed with the city, Bowie County or the local water district before a bore is planned. EPA drinking water records for Texas do not tie systems to towns, and no system could be matched to Red Lick by name. Southwestern Electric Power, Bowie-Cass Electric Cooperative and Southwest Arkansas Electric Cooperative report service in Bowie County. We confirm the electric line owner before planning a conduit bore near FM 2148.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Southwestern Electric Power, Bowie-Cass Electric Cooperative and Southwest Arkansas Electric Cooperative | Electric utilities reporting service in Bowie County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Red Lick’s median housing year at 1991. It estimates 4 percent of homes were built before 1960, 78 percent from 1960 to 1999, and 18 percent in 2000 or later. Along Farren Road, that mix can mean planning for either replacement lines or new services. We hydrovac pothole every marked utility on the bore path before drilling near it, including a marked line crossing beneath Farm Road 2148.

Do you cover Red Lick and nearby Wake Village?
Red Lick is an incorporated city in Bowie County, at an elevation of 341 feet and covering 1.82 square miles. Its ZIP code is 75503. Nash is 3.0 miles southeast, and Leary is 3.1 miles southwest. Wake Village, the nearest larger city, is 4.7 miles southeast; Texarkana is 5.1 miles southeast and Hooks is 7.3 miles west. New Boston, the county seat, is 14.9 miles west. From our Yukon, Oklahoma main office, Red Lick is 321 road miles and a 6.4 hour drive, which affects mobilization planning for work near Rain Creek.
Places near Red Lick
- Directional boring in Nash: 3 miles southeast
- Directional boring in Leary: 3.1 miles southwest
- Directional boring in Wake Village: 4.7 miles southeast
- Directional boring in Texarkana: 5.1 miles southeast
- Directional boring in Hooks: 7.3 miles west
Which jobs call for a bore near Farren Road in Red Lick?
- Highway crossing: A line beneath FM 2148 is planned as a bore, with the utility owner handling the TxDOT permit for right of way work.
- Water service: A service route along Farm Road 2148 needs the address specific water provider confirmed before the bore is planned.
- Fiber conduit: A fiber run near Farren Road can be laid without opening the pavement, with marked utilities exposed along the route first.
- Creek crossing: A route beneath Rain Creek needs channel depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
- Rail crossing: If a route reaches the Texas Northeastern Railroad outside Red Lick, the railroad owner must agree to the crossing details.
- Drainage crossing: Unnamed drainage in Red Lick totals 1.76 miles, so a route near a low area needs a site specific path review.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Red Lick bore near Rain Creek?
For a bore along FM 2148, start with the address or map pin so we can locate the route. Tell us what will go in the ground, such as a water line or fiber conduit, then give the pipe or conduit size and footage. A sketch or plans showing the path toward Rain Creek help us identify crossings and prepare the scope.
A short, clear route near Farren Road with few marked lines is simpler to plan than a crossing of FM 2148 or Rain Creek. Price reflects length, pipe or conduit size, Ruston soil conditions, utilities that must be crossed and exposed, pavement, drainage crossings, pits, excavation and backfill. A route near the Texas Northeastern Railroad can add coordination needs. Red Lick’s 321 road miles from Yukon also affect mobilization, as can emergency or high profile work.
Questions people ask about boring in Red Lick
Does Trinity Boring Solutions take directional boring work in Red Lick, Bowie County?
Yes. We take directional boring work in Red Lick, including routes along Farm Road 2148. Our own crews and crews from satellite yards operated by drilling contractors Trinity has vetted handle the work. You work with Trinity from the first call through the bore log, whichever crew is on site.
Will a Red Lick bore hit rock below Ruston soil?
The USDA soil survey does not map bedrock in Red Lick’s top five feet, but that does not rule out rock at greater depth. The geologic map identifies the Midway Group, undivided, of Paleocene age. A site specific bore plan near Farren Road still needs to account for conditions below the mapped soil.
Who approves a Red Lick bore under FM 2148?
The line owner applies for a permit through TxDOT’s RULIS system when work uses FM 2148 right of way. The TxDOT Atlanta District reviews the application. We prepare the bore plan and profile for the utility owner, and the permit sets the approved conditions for the crossing.
What does a Red Lick bore under the Texas Northeastern Railroad require?
A crossing near the Texas Northeastern Railroad requires an agreement with the railroad that owns the track. The agreement sets the crossing conditions, including casing, depth and flagging. The track is mapped 0.8 miles outside Red Lick’s limits, so the proposed route needs to establish whether railroad property is involved.
Can a line be bored under Rain Creek in Red Lick?
A bore under Rain Creek can be planned, but the route and depth must account for the creek channel. Planning also checks whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. Rain Creek runs 0.37 channel miles inside Red Lick, so the crossing location matters.
Who owns electric lines in Red Lick, Bowie County, and who confirms conduit specs?
Southwestern Electric Power, Bowie-Cass Electric Cooperative and Southwest Arkansas Electric Cooperative report service in Bowie County, but that does not identify the provider for every address in Red Lick. The line owner for a location near FM 2148 must be confirmed before conduit specifications and a bore plan are set.
How much 811 notice does a Red Lick bore along Farm Road 2148 need?
For a bore along Farm Road 2148, submit the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. The ticket has a 20 day life. If the start slips more than 14 days past the original notice, submit a new request; have worn or moved marks refreshed before work continues.
Does Wake Village’s distance from Red Lick affect a bore from Trinity’s Yukon office?
Red Lick is 321 road miles and a 6.4 hour drive from our Yukon, Oklahoma main office. Wake Village is 4.7 miles southeast of Red Lick. The distance from Yukon can affect mobilization planning for a job on Farm Road 2148, along with the route length and site conditions.
What affects the cost of directional boring near FM 2148 in Red Lick?
The price depends on the route and scope near FM 2148, not one standard rate. Length, pipe or conduit size, Ruston soil conditions, pavement, utilities to expose and crossings all matter. A Rain Creek drainage crossing, pits and excavation can add work, and mobilization from Yukon is part of planning for this 321 road mile trip.
Where the Red Lick facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Red Lick
- U.S. Census Bureau, TIGER/Line 2024: Red Lick boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Red Lick
- U.S. Census Bureau, American Community Survey 2019 to 2023: Red Lick housing units and year built
- Macrostrat geologic map compilation: map units under Red Lick
- U.S. Department of Transportation, North American Rail Network: track owners in Bowie County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Bowie County
- U.S. Geological Survey, Elevation Point Query Service: Red Lick elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Red Lick
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Red Lick
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Red Lick, Texas
Type the address of your job in Red Lick. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Red Lick
Same county: New Boston · De Kalb · Maud · Redwater. All counties: Texas county list.