Directional Boring Contractors in Bowie County, TX

Trinity Boring Solutions is a directional boring contractor serving Bowie County, Texas, installing water, sewer, gas, electric and fiber lines without an open trench in Texarkana, Wake Village, New Boston, Nash, Hooks and De Kalb. From the Trinity main office in Yukon, Oklahoma it is about 309 road miles southeast to New Boston, the county seat. The usual crossings in Bowie County are Interstate 30 and US 82, the Sulphur River and Union Pacific track. Call (405) 409-7423 any time.

Free Bore Planner

Plan Your Bore in Bowie County, Texas

Type the address of your job in Bowie County. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

What Should You Know Before Boring in Bowie County?

Bowie County covers 885 square miles, has about 91,992 residents and sits in the TxDOT Atlanta District.

County seatNew Boston
Population91,992 (2024 Census estimate), down 1.0% since 2020
Land area885 square miles
Largest cities and townsTexarkana (35,971), Wake Village (5,813), New Boston (4,546), Nash (4,208) and Hooks (2,474)
TxDOT districtTxDOT Atlanta District
811 centerTexas811 (call 811), two working days of notice
Electric utilitiesSouthwestern Electric Power, Bowie-Cass Electric Cooperative and Southwest Arkansas Electric Cooperative
Interstate and US highwaysInterstate 30, US 82, US 67, US 59, US 259 and US 71
State Highways8, 93 and 98
State loops and spursLoop 151 and Loop 14
RiversSulphur River and Red River
Creeks and other streamsMud Creek, Anderson Creek, McKinney Bayou, Barkman Creek, Red Bayou, Blythe Creek, Hooks Bayou and Holly Creek
LakesWright Patman Lake and Bringle Lake
RailroadsUnion Pacific, Canadian Pacific Kansas City and short line railroads, about 88 main line miles
Average precipitation50.8 inches a year (1991 to 2020)
New housing units permitted257 in 2025
Road distance from Trinity main officeAbout 309 miles from Yukon, Oklahoma to New Boston
Trinity insuranceGeneral liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability

Sources: Census Bureau (2024 population, 2025 building permits, TIGER/Line roads and water), EIA Form 861 (2025), NOAA 1991 to 2020 precipitation, federal rail network map, TxDOT districts, OpenStreetMap routing. Checked November 2026.

What Does a Bore Have to Cross in Bowie County?

A bore in Bowie County most often has to cross a highway such as Interstate 30, US 82 or US 67, a stream such as the Sulphur River, the Red River or Mud Creek and Union Pacific or Canadian Pacific Kansas City track. State Highways 8, 93 and 98 also run through the county, along with Loop 151 and Loop 14. The Census map names 25 larger streams in Bowie County, led by Mud Creek, Anderson Creek, the Sulphur River, McKinney Bayou, Barkman Creek and Red Bayou. The rest are Blythe Creek, Hooks Bayou, Holly Creek, Big Creek, Rice Creek, Mill Creek, Ward Creek, Boothe Creek, Brooks Creek, Weaver Creek, Caney Creek, Jones Creek, Bassett Creek, Panther Creek, North Mill Creek, Akin Creek, Young Creek, Red River and Calvert Creek. Wright Patman Lake and Bringle Lake are the main mapped lakes. The federal rail map shows about 88 miles of main line track in Bowie County: Union Pacific about 46 miles, Canadian Pacific Kansas City about 20 and short line and other operators about 22.

Trinity Boring Solutions horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
A Trinity Boring Solutions drill rig, support trucks and vacuum excavation truck on a jobsite.

What Is the Ground Like for Directional Boring in Bowie County?

Shallow groundwater is the main thing to plan for in Bowie County: the federal soil survey records a seasonal water table within five feet of the surface on about 60 percent of the county. On wet Bowie County ground the entry and exit pits are kept small and the bore is sealed with drilling fluid. May is the wettest month in Bowie County at 5.2 inches on average and August the driest at 3.0. Bowie County averages 50.8 inches of precipitation a year, so wet weather and water in the pits are planned for.

  • Most common soils: Sawyer (17%), Adaton (7%) and Eylau (6%).
  • Surface texture: most often silt loam (35%) or very fine sandy loam (13%).
  • Bedrock within 5 feet: about 6% of the county. Most of it is soft, weathered rock.
  • Clay rich layer (35% clay or more) in the top 5 feet: about 49% of the county.
  • Seasonal water table within 5 feet: about 60% of the county.

Source: USDA Natural Resources Conservation Service, Soil Survey Geographic Database, Bowie County, Texas (survey area TX037, version 24, September 3, 2026), through Web Soil Survey. Percentages are shares of mapped county area.

Who Permits a Bore in Bowie County?

The TxDOT Atlanta District permits bores under state highways in Bowie County, the Bowie County Commissioners Court handles county roads, and Texarkana, Wake Village and New Boston each handle their own streets.

  • State highways. Interstate 30, US 82, US 67, US 59, the other numbered state routes and the farm to market roads in Bowie County are on the state system. The utility owner files a TxDOT utility permit in RULIS.
  • Texas811 locates. Texas811 needs at least two working days of notice before digging (Texas811 FAQ; Texas Utilities Code, Section 251.151).
  • Railroads. A bore under Union Pacific, Canadian Pacific Kansas City or short line track in Bowie County needs a crossing agreement from the railroad that owns it, which sets the casing, depth and flagging.
  • Water crossings. A bore under the Sulphur River, the Red River, Mud Creek or Wright Patman Lake is checked for U.S. Army Corps of Engineers jurisdiction while the path is planned.

Statewide rules are on the Directional Boring Texas page, and Trinity supplies the bore plan and profile for the permit package.

Which Electric Utilities Serve Bowie County?

Southwestern Electric Power, Bowie-Cass Electric Cooperative and Southwest Arkansas Electric Cooperative serve Bowie County, according to 2025 filings with the U.S. Energy Information Administration. Southwestern Electric Power is an investor owned utility; Bowie-Cass Electric Cooperative and Southwest Arkansas Electric Cooperative are member owned cooperatives. The owner of the line sets the conduit size, depth and inspection steps, so it is confirmed before a conduit bore in Bowie County is planned. More on electric line boring for electric cooperatives.

How Much New Construction Is There in Bowie County?

Bowie County permitted 257 new housing units in 2025, 127 of them single family homes, according to the Census Bureau Building Permits Survey. The population of Bowie County went from 92,892 in 2020 to 91,992 in 2024, a loss of 1.0 percent. New building in Bowie County still puts service lines under streets and driveways that are already paved.

Which Cities and Towns in Bowie County Does Trinity Serve?

Trinity takes directional boring work in all 10 incorporated places in Bowie County and at sites outside city limits, and Texarkana is the largest with about 35,971 residents.

City or town2024 population
Texarkana35,971
Wake Village5,813
New Boston4,546
Nash4,208
Hooks2,474
De Kalb1,426
Maud985
Red Lick930
Redwater861
Leary456

Source: U.S. Census Bureau 2024 estimates, counting only the part of each city inside Bowie County.

Bowie County borders Cass County, Morris County, Red River County, Little River County, Arkansas, Miller County, Arkansas and McCurtain County, Oklahoma; every county is on the Directional Boring in All 254 Texas Counties page. The neighboring county seats are Linden (Cass), Daingerfield (Morris) and Clarksville (Red River).

Which Directional Boring Services Are Available in Bowie County?

Every Trinity service is available in Bowie County: horizontal directional drilling from 3/4 inch service lines to 48 inch casing, auger boring, hydrovac potholing, trenching and 24 hour emergency response, all listed under Underground Utility and Boring Services.

The free Bore Planner sizes a Bowie County job before you call.

Bowie County Directional Boring FAQs: What Do Customers Ask?

Does Trinity Boring Solutions work in New Boston, Texas?

Yes. Trinity Boring Solutions takes work in Texarkana, Wake Village, New Boston, Nash, Hooks and De Kalb and the rural parts of Bowie County. Trinity works in Texas with its own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted.

Who approves a bore under Interstate 30 in Bowie County?

The TxDOT Atlanta District. The utility owner files the permit in the TxDOT RULIS system. County roads go through the Bowie County Commissioners Court and city streets through the city.

Is there rock in Bowie County?

Not much. The federal soil survey records bedrock within five feet of the surface on about 6 percent of Bowie County. Potholing confirms it on the actual bore path.

Can a line be bored under the Sulphur River in Bowie County?

Yes. A drill is steered below the bed of the Sulphur River from a pit on each bank and the pipe is pulled back through, so the channel is not opened. Federal jurisdiction over the crossing is checked first.

Which railroads have track in Bowie County?

Union Pacific, Canadian Pacific Kansas City and short line operators, with about 88 miles of main line track on the federal rail map. Each requires its own crossing agreement before a bore goes under the rails.

Is Trinity insured for work in Bowie County?

Yes. Trinity Boring Solutions carries general liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability. Ask for a certificate with the quote.

How much does directional boring cost in Bowie County?

Trinity works from a general range based on length and pipe size. Depth, the crossings and the ground set the number, and shallow groundwater is a factor on many Bowie County jobs.

How Do You Get a Bore Quote in Bowie County?

Call (405) 409-7423 any time or send the address in Bowie County, the utility, the length and what it crosses. Trinity has bored since 1965 and is family owned.