trinityboringsolutions.com

Nolanville Texas Directional Boring: Walnut Clay, Interstate 14 and BNSF Railway

Quick Answer: Interstate 14 and BNSF Railway crossings shape the work here; we use directional boring, also called horizontal directional drilling (HDD), to pass beneath pavement and track. Nolanville is 351 road miles from our Yukon, Oklahoma main office, so a route near Nolan Ridge Drive needs mobilization planned around distance. USDA mapping shows Lewisville soil is common, with silty clay that can cling to the reamer and pipe. We stage the ream and prepare the pull before opening that Lewisville ground.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Nolanville bores at a glance

  • Incorporated city in Bell County, Texas. Population 7,395 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 351 miles, about 6.7 hours of driving.
  • Ground: Lewisville soil is mapped on 26 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 55 percent of the area.
  • Highways inside the boundary: Interstate 14, US 190, US 190 Business, FM 439 and FM 2410. State permit office: TxDOT Waco District.
  • Railroad track inside the boundary: BNSF Railway, with 8 mapped street and rail crossings.
  • Named streams inside the boundary: Nolan Creek and Shaw Branch.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring near Nolan Ridge Drive in Nolanville?

Interstate 14 gives a clear example of the crossings that can shape a Nolanville job. The Census Bureau Vintage 2024 estimate puts this Bell County city at 7,395 people. We install water, sewer, gas, electric conduit and fiber, routed beneath streets such as Main Street or toward service connections along the local road network.

Our main office is in Yukon, Oklahoma, and Nolanville work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore runs roughly 4,100 feet under the Arkansas River in Tulsa. Beside that reach, a Nolanville crossing under BNSF Railway or a local street is a shorter, site specific job.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show beneath Lewisville soil in Nolanville?

The USDA soil survey maps Lewisville soils across 26 percent of Nolanville, with San Saba at 19 percent, Frio at 14 percent, Purves at 12 percent and Denton at 10 percent. These are mapped shares, not test borings. At about 40 inches, the survey shows bedrock over 45 percent of the area and silty clay over 41 percent; sandy texture covers 1 percent. Near the surface, silty clay covers 63 percent and clay covers 23 percent. That points to a sticky cut rather than a sandy, loose hole.

USDA soil survey, inside the Nolanville city limitsWhat is mapped
Soil series mappedLewisville 26 percent, San Saba 19 percent, Frio 14 percent, Purves 12 percent and Denton 10 percent
Texture at the surfacesilty clay 63 percent, clay 23 percent and loam 10 percent
Texture about 40 inches downbedrock 45 percent, silty clay 41 percent and silt loam 10 percent
Engineering class about 40 inches downfat clay (CH) 44 percent and lean clay (CL) 10 percent
Average clay content about 40 inches down39 percent
Bedrock mapped within 60 inches55 percent of the area (43 percent hard rock, 12 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils14 percent of the area
High corrosion risk for uncoated steel80 percent of the area

The USDA soil survey maps bedrock within 60 inches across 55 percent of Nolanville, with hard bedrock across 43 percent and weathered bedrock across 12 percent. Typical depth is 27 inches, so the drill may shift at a soil to rock contact. Seasonal water table is not mapped within 60 inches, while flood prone soils cover 14 percent. High steel corrosion risk covers 80 percent. The geologic map names Walnut Clay of Albian age, a unit of clay, limestone and shale; rock sections may need slower drilling and a suitable bit.

How do we drill Nolanville ground where bedrock is mapped?

Nolanville combines sticky clay with bedrock mapped at shallow depth. We set the bore path from the site information, then adjust the drilling plan as the ground changes between Lewisville silty clay and rock.

  1. In Lewisville silty clay, we use a thinner drilling fluid and ream in stages so sticky cuttings do not build up on the reamer or grip the pipe.
  2. Where Nolanville’s survey maps hard bedrock within 60 inches, we track depth and pitch as the head moves through the soil to rock contact.
  3. Before drilling near any marked utility in Nolanville, we expose it with hydrovac potholing; surface paint shows its position but not its depth.
  4. Near Nolan Creek or pavement on Interstate 14, we manage fluid pressure and plan the bore below the crossing to limit the chance of lifting the surface.
Vermeer D24x40 S3 Navigator and water truck at the entry of a 385 foot sandstone rock bore above the wetland in Guthrie, Oklahoma
Our Vermeer D24x40 and water truck at the entry of a 385 foot sandstone rock bore in Guthrie, Oklahoma.

What is in the way of a new line in Nolanville near BNSF Railway?

Interstate 14, US 190, US 190 Business, FM 439 and FM 2410 all run inside Nolanville; TxDOT roadway mapping shows 8.2 miles of Interstate 14 and 12.3 miles of US 190 within the limits. The longer local street runs include Nolan Ridge Drive at 1.16 miles, Paddy Hamilton Road at 1.15 miles and Main Street at 1.13 miles. Those routes create possible utility conflicts, so each proposed path needs a check against pavement and existing lines.

CrossingTypeMapped extentWho has a say
Interstate 14Interstate8.2 roadway miles insideState highway office
US 190US highway12.3 roadway miles insideState highway office
US 190 BusinessUS highway0.7 roadway miles insideState highway office
FM 439State highway1.2 roadway miles insideState highway office
FM 2410State highway0.2 roadway miles insideState highway office
BNSF RailwayRailroad7.95 track miles insideThe railroad
Nolan CreekStream3.8 channel miles insideChecked for Corps of Engineers jurisdiction
Shaw BranchStream0.87 channel miles insideChecked for Corps of Engineers jurisdiction
Hay BranchStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

BNSF Railway has 7.95 track miles in Nolanville, and the map shows 8 street and rail crossings. Nolan Creek runs 3.8 channel miles through the city, while Shaw Branch runs 0.87 miles; mapped street crossings of named streams total 8. A crossing plan needs to account for the track owner or creek channel before the bore alignment is set. No lakes or ponds are mapped within one mile.

Who approves a bore by Interstate 14 in Nolanville?

Interstate 14, US 190 and the farm to market roads in Nolanville are state routes, so work in their right of way needs a TxDOT utility permit reviewed by the Waco District. The utility that owns the line files through TxDOT RULIS; we prepare the bore plan and profile and work under the owner’s permit. City streets such as Main Street are under the city’s jurisdiction. A BNSF Railway crossing needs an agreement with the railroad, and a Nolan Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines may already be buried in Bell County near Nolanville?

EPA drinking water records do not tie water systems to Nolanville addresses, so the water provider for a specific address has to be confirmed with the city, Bell County or the local water district before a bore is planned. Oncor Electric Delivery Company, Bartlett Electric Cooperative, Heart of Texas Electric Cooperative and Pedernales Electric Cooperative report electric service in Bell County. The line owner for a proposed conduit route must be identified before that bore is laid out.

Line ownerWhat it isSourceSize
Oncor Electric Delivery Company, Bartlett Electric Cooperative, Heart of Texas Electric Cooperative and Pedernales Electric CooperativeElectric utilities reporting service in Bell CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Nolanville’s median housing year at 2005; 73 percent of homes were built in 2000 or later, 26 percent from 1960 to 1999 and 1 percent before 1960. That mix can mean both new service routes and older lines to replace. For a proposed utility line beneath Nolan Ridge Drive, marked lines are exposed by hydrovac before the drill approaches; paint shows position, not depth.

Exposed underground utility line in a hand dug potholing pit before a directional bore in Oklahoma
An existing utility line exposed in a pothole before a directional bore in Oklahoma.

Where is Nolanville in relation to Harker Heights?

Nolanville is in Bell County at an elevation of 675 feet and covers 4.88 square miles. Its ZIP codes are 76559 and 76513. Harker Heights is 2.6 miles southwest and is the nearest larger city; Killeen is 7.5 miles west, and Belton, the county seat, is 7.6 miles east. Our Yukon, Oklahoma main office is 351 road miles away, a 6.7 hour drive, so that distance is part of planning a crew and equipment mobilization for a Nolanville project.

Places near Nolanville

What boring work comes up near Main Street in Nolanville?

  • Highway crossing: A utility beneath Interstate 14 or US 190 needs a bored route that clears pavement and follows the permit profile.
  • Rail crossing: A line beneath the BNSF Railway Lampasas Subdivision needs a route coordinated with the track owner’s crossing agreement.
  • Creek crossing: At Nolan Creek, plan the bore below the channel and check during planning whether the crossing falls under Corps jurisdiction.
  • Street conduit: A conduit route beneath Main Street can keep the street surface uncut while entry and exit pits sit in the dirt.
  • Water service: For a proposed service near Cedar Ridge Drive, confirm the provider for that address before setting out the bore route.
  • Fiber route: Along Nolan Ridge Drive, a fiber bore can pass beneath the street while keeping the pavement and sidewalks uncut.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a bore near Cedar Ridge Drive in Nolanville?

For a proposed route near Cedar Ridge Drive, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage. A sketch or plans help show the route past streets, utilities or a creek. Those details let us assess the Nolanville site before we set the bore scope.

Nolanville pricing starts with ground and crossing demands: Lewisville silty clay can load a reamer, and shallow mapped bedrock can slow the cut. Length and pipe or conduit size set the scale of the bore. A crossing beneath Interstate 14 or BNSF Railway adds coordination and route requirements; pavement, creek crossings, pits, excavator time and backfill can add work. The 351 road miles from Yukon also affect mobilization.

Questions people ask about boring in Nolanville

Does Trinity take directional boring work in Nolanville, Bell County, and how are crews assigned?

Yes. Trinity takes Nolanville jobs in Bell County with company crews and work staged from satellite yards operated by partner drilling contractors we have vetted. The customer works with Trinity through the bore log even when a partner crew handles the site work. A route near Nolan Creek is planned to its actual access and crossing conditions.

Does Lewisville soil in Nolanville create a corrosion concern, and what pipe can be used?

The mapped steel corrosion risk is high across 80 percent of Nolanville, including areas with Lewisville soil. HDPE is not affected by that soil corrosion concern. For steel casing or tracer wire, the line owner chooses the coating. The soil survey describes mapped conditions; it does not replace checking the specific route.

What ground could a bore pass through in Nolanville, including Lewisville soil?

The USDA soil survey maps Lewisville, San Saba, Frio, Purves and Denton soils in Nolanville. Around 40 inches below the surface, it maps bedrock over 45 percent of the city and silty clay over 41 percent. Those patterns point to changing conditions along a route, so the drilling approach may need to change as the bore advances.

How much bedrock is mapped within five feet in Nolanville, and is it hard or weathered?

Bedrock is mapped within 60 inches across 55 percent of Nolanville. The survey maps hard bedrock across 43 percent and weathered bedrock across 12 percent. With typical depth at 27 inches, a bore can meet rock sooner than expected from the surface; the actual tool choice depends on what the route encounters.

Who permits a utility bore under Interstate 14 in Nolanville?

TxDOT reviews the utility permit for work in the Interstate 14 right of way through its Waco District. The utility owner files the application in TxDOT RULIS, with the bore plan and profile prepared for that filing. The crossing depth and pavement requirements are addressed in the permit for the Nolanville route.

What does a bore under BNSF Railway in Nolanville require?

A bore beneath BNSF Railway requires an agreement from the railroad that owns the track. That agreement sets the crossing details, including casing, depth and flagging. With 7.95 track miles inside Nolanville, the track location and planned utility route need to be coordinated before the bore is set.

How far is Nolanville from Yukon when coming from Harker Heights, and does distance affect the job?

Nolanville is 351 road miles from our Yukon, Oklahoma main office, with a 6.7 hour drive. Harker Heights is 2.6 miles southwest of Nolanville, but the job is mobilized from Yukon or a vetted partner contractor’s satellite yard. Distance can affect equipment and crew mobilization for a Nolanville bore.

How early should I call Texas811 for a Nolanville bore near Nolan Ridge Drive?

For a Nolan Ridge Drive bore, make the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. The ticket has a 20 day life. If the start slips more than 14 days past the original notice, submit a new request; have worn or moved marks refreshed before work continues.

What affects the cost of directional boring under Interstate 14 in Nolanville?

The route, bore length and pipe or conduit size set much of the scope. In Nolanville, mapped clay and bedrock can affect drilling time, while an Interstate 14 crossing brings permit and pavement requirements. Existing utilities, track or creek crossings, concrete, pits, backfill and the 351 road miles from Yukon can also change the work involved.

Where the Nolanville facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Nolanville

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Nolanville, Texas

Type the address of your job in Nolanville. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Nolanville

Same county: Killeen · Temple · Fort Hood · Troy · Little River-Academy · Holland · Rogers · Bartlett · Pendleton. All counties: Texas county list.