trinityboringsolutions.com

Oakhurst Texas Directional Boring: Woodville Soil, Deans Creek And US 190

Quick Answer: In Oakhurst’s top five feet, the USDA soil survey maps mostly fine sandy loam over clay at about 40 inches, and we use directional boring, also called horizontal directional drilling (HDD), for crossings at Deans Creek. Our Yukon, Oklahoma main office is 405 road miles away, with US 190 and FM 946 running through the community. Clay is mapped at 40 inches across 54 percent of the area, where sticky cuttings can build on a reamer. That ground calls for staged reaming and a careful pull under Oakhurst streets.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Oakhurst bores at a glance

  • Unincorporated community in San Jacinto County, Texas. Population 148 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 405 miles, about 7.8 hours of driving.
  • Ground: Woodville soil is mapped on 49 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 4 percent of the area.
  • Highways inside the boundary: US 190 and FM 946. State permit office: TxDOT Lufkin District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Deans Creek and Palmetto Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near Deans Creek in Oakhurst?

Trinity Boring Solutions takes directional boring work in Oakhurst, San Jacinto County, where a bore can carry water, sewer, gas, electric conduit or fiber beneath Cleveland Road or near Deans Creek. The Census Bureau’s 2020 Census count for Oakhurst is 148; it does not publish yearly estimates for unincorporated places. Those line types can serve individual properties or connect routes along the community’s named streets.

Our main office is in Yukon, Oklahoma, and Oakhurst work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, and we have done directional boring since 1982. Our range, from 3/4 inch service lines to 48 inch casing, can suit a service route along Hopkins Road or a larger crossing near US 190.

Trinity Boring Solutions branded compact directional drilling unit positioned beside a tree on a red dirt jobsite
Our compact directional drill set up beside a tree on a tight site. Photos on this page are from our jobs in Oklahoma and Texas.

What is Woodville soil like to bore through in Oakhurst?

Woodville soil covers 49 percent of Oakhurst in the USDA soil survey, with Woodville fine sandy loam mapped on 5 to 12 percent slopes. Across the mapped community, fine sandy loam is the surface texture for 82 percent, while loamy fine sand accounts for 12 percent and clay for 4 percent. At about 40 inches below the surface, the survey maps clay in 54 percent of the area and sandy clay loam in 45 percent. These are mapped soil patterns, not test borings, so a bore plan still needs the site conditions checked.

USDA soil survey, inside the Oakhurst mapped community boundaryWhat is mapped
Soil series mappedWoodville 49 percent, Pinetucky 28 percent, Doucette 12 percent, Wiergate 4 percent and Stringtown 4 percent
Texture at the surfacefine sandy loam 82 percent, loamy fine sand 12 percent and clay 4 percent
Texture about 40 inches downclay 54 percent and sandy clay loam 45 percent
Engineering class about 40 inches downfat clay (CH) 54 percent, clayey sand (SC) 41 percent and lean clay (CL) 4 percent
Average clay content about 40 inches down40 percent
Bedrock mapped within 60 inches4 percent of the area (0 percent hard rock, 4 percent weathered rock)
Seasonal water table within 60 inches50 percent of the area
Flood prone soils2 percent of the area
High corrosion risk for uncoated steel54 percent of the area

At about 40 inches, the mapped clay can hold an open hole but cling to the reamer or grip the pipe; staged reaming and a same day pull can help. A seasonal water table within 60 inches is mapped across 50 percent of Oakhurst, so pits may need pumping. Flood prone soils cover 2 percent, including possible concerns near Deans Creek. For a Cleveland Road bore, we consider the mapped high steel corrosion risk across 54 percent when selecting casing and tracer wire materials. The Pliocene Willis Formation includes clay, silt, sand and gravel; its mapped mixture can change drilling conditions along a route.

How do we bore through Oakhurst clay?

We plan an Oakhurst bore around the clay mapped at about 40 inches and the fine sandy loam at the surface. Near Deans Creek, we also account for wet ground and keep the cuttings and returns under control.

  1. Because clay is mapped at 40 inches across 54 percent of Oakhurst, we use fluid suited to sticky cuttings and ream in stages before pulling pipe.
  2. Where fine sandy loam at the surface gives way to loamy fine sand, we manage fluid to support the bore without washing loose ground out.
  3. With a seasonal water table mapped within 60 inches across 50 percent of the community, we keep pits manageable and pump water if they fill.
  4. Near Deans Creek, we plan the bore depth beneath the channel and check for U.S. Army Corps of Engineers jurisdiction during crossing planning.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

Where might a line go under Cleveland Road in Oakhurst?

US 190 and FM 946 run through Oakhurst, with 2.4 mapped roadway miles of US 190 and 2.0 of FM 946 inside the community boundary. Cleveland Road is the longest named street at 0.41 miles, followed by Hopkins Road at 0.39 miles and Old Palmetto Road at 0.35 miles. A bore can keep pavement and driveways intact, with entry and exit pits placed in dirt. For work beneath an existing highway, TxDOT requires boring or tunneling rather than an open trench through the pavement.

CrossingTypeMapped extentWho has a say
US 190US highway2.4 roadway miles insideState highway office
FM 946State highway2 roadway miles insideState highway office
Deans CreekStream0.96 channel miles insideChecked for Corps of Engineers jurisdiction
Palmetto CreekStream0.37 channel miles insideChecked for Corps of Engineers jurisdiction
Mill BranchStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Edwards BranchStream nearby0.9 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside the Oakhurst community boundary or within 1 mile outside it, so a rail crossing is not a mapped local feature. Deans Creek runs 0.96 channel miles inside the community, and Palmetto Creek runs 0.37. Public mapping shows two street crossings of named streams. Those creek routes need a planned bore profile, and water crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning. Along US 190, no lakes or ponds are mapped within 1 mile, so our crossing plan does not indicate a mapped lake or pond crossing.

Do I need a permit to bore under roads in Oakhurst, San Jacinto County?

Oakhurst has no city government, so its streets are under county or state authority rather than a city department. A bore along Cleveland Road or Old Palmetto Road needs the applicable county or state approval. For work in the right of way of US 190 or FM 946, the line owner, not the drilling contractor, applies through TxDOT’s RULIS system; the TxDOT Lufkin District reviews it. We prepare the bore plan and profile for the owner’s filing. TxDOT cover requirements depend on line type, with 60 inches at highway crossings for electric, communication and water lines, and for pressurized sewer lines.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried in Oakhurst, San Jacinto County?

The provider for a specific Oakhurst address has to be confirmed with the county or local water district before a bore is planned; EPA drinking water records do not match a provider to this community. For electricity, Entergy Texas and Sam Houston Electric Cooperative report service in San Jacinto County, but the line owner for a property near US 190 must be verified before an electric conduit bore. That confirmation helps set the route and conduit specifications.

Line ownerWhat it isSourceSize
Entergy Texas and Sam Houston Electric CooperativeElectric utilities reporting service in San Jacinto CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Oakhurst’s median housing year at 1976; 41 percent of housing units were built before 1960, and 59 percent from 1960 to 1999. Those dates do not establish the age of a buried line, but replacement work along Hopkins Road may follow older properties while other bores serve new connections. Before drilling near a marked utility, we hydrovac pothole it to see its depth; locate marks show position, not depth.

Exposed underground utility line in a hand dug potholing pit before a directional bore in Oklahoma
An existing utility line exposed in a pothole before a directional bore in Oklahoma.

Do you cover Oakhurst and nearby Point Blank?

Oakhurst is an unincorporated community in San Jacinto County, Texas, at 358 feet elevation and covering 1.54 square miles. Its ZIP code is 77359. Point Blank lies 5.8 miles east, Riverside is 9.1 miles northwest, and Cape Royale is 12.3 miles southeast. Huntsville is the nearest larger city, 14.7 miles west, while county seat Coldspring is 14.9 miles southeast. The Yukon, Oklahoma main office is 405 road miles from Oakhurst, a 7.8 hour drive, which can affect mobilization for work near US 190.

Places near Oakhurst

Which jobs call for a bore near Hopkins Road in Oakhurst?

  • Highway crossing: A route under US 190 needs a bore plan for the highway right of way and cover requirements set for the line type.
  • Street service: A water or sewer service along Cleveland Road can pass beneath pavement, with access pits kept in dirt beside the route.
  • Creek crossing: A line beneath Deans Creek needs a planned profile that stays under the channel and accounts for wet pits.
  • Fiber route: Conduit near Hopkins Road can be bored beneath pavement without cutting the street, after marked utilities are exposed.
  • Electric conduit: A route near FM 946 starts with confirming the line owner and planning for applicable TxDOT right of way requirements.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a bore near Harrison Road in Oakhurst?

For an Oakhurst quote, give us the address or map pin, such as a location off Harrison Road, and say what will go in the ground. Include the pipe or conduit size and the planned footage; a sketch or plans help show the route under a street or toward US 190. Those details let us assess access, crossings and the likely bore setup.

A short route through accessible Woodville fine sandy loam with few marked utilities is simpler to plan than a route through clay near Deans Creek. Length, pipe size, soil, utility crossings, pavement, creek or drainage crossings, pits and excavator time all affect the work. A highway route at US 190 adds permit and cover planning. Mobilization also matters because Oakhurst is 405 road miles from Yukon, and urgent or high profile work can call for more planning.

Questions people ask about boring in Oakhurst

Does Trinity Boring Solutions take jobs in Oakhurst, San Jacinto County, and who staffs them?

Trinity Boring Solutions takes directional boring work in Oakhurst, San Jacinto County. Our crews do the work, with additional staffing from satellite yards run by partner drilling contractors we have vetted. You work with Trinity through the bore log, whichever crew is on site for a route near Deans Creek or US 190.

Who owns electric lines in Oakhurst, San Jacinto County, and who confirms conduit specs?

Entergy Texas and Sam Houston Electric Cooperative report electric service in San Jacinto County, but that does not establish which provider serves a specific Oakhurst address. We confirm the line owner for a property near US 190 before planning an electric conduit bore. The owner can confirm its conduit specifications for that route.

Who is responsible for Old Palmetto Road in Oakhurst, and does it need to be cut?

Oakhurst has no city government, so Old Palmetto Road is under county or state authority, depending on the road. A bore can pass beneath the street without cutting its pavement, using pits in dirt on either side. The applicable authority must be confirmed for the specific route.

How old are buried lines near Hopkins Road in Oakhurst, and can replacement work be bored?

The American Community Survey 2019 to 2023 estimates give Oakhurst a median housing year of 1976, but house age does not date a buried line. A replacement route near Hopkins Road can be bored if the site and existing utilities allow. For a Hopkins Road crossing, we expose marked lines before drilling nearby to verify their location and protect the bore path.

Could groundwater or flood prone ground affect bore pits near Deans Creek in Oakhurst?

It could: the USDA soil survey maps a seasonal water table within 60 inches across 50 percent of Oakhurst, and flood prone soils across 2 percent. Near Deans Creek, pits may need pumping and the bore depth should account for the channel. Site conditions still need checking.

Does Woodville soil in Oakhurst corrode steel, and what pipe should I use?

The USDA soil survey maps high steel corrosion risk across 54 percent of Oakhurst, including Woodville soil areas. The line owner should choose materials and any coating for steel casing or tracer wire. HDPE is not affected by that soil corrosion concern, and the right line material depends on the project.

What bore sizes and lengths can Trinity handle for a project near Harrison Road in Oakhurst?

For a project near Harrison Road, we handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The route, soil and utility crossings help determine suitable equipment and setup. A map pin and sketch can clarify the proposed path.

How much notice does Texas811 need for an Oakhurst bore near Cleveland Road, and what if marks move?

For a bore near Cleveland Road, count back at least two working days from the planned start; Texas law excludes Saturdays, Sundays and legal holidays, and notice cannot be earlier than 14 days ahead. A ticket has a 20 day life. If work slips more than 14 days past the original notice, request a new ticket; worn or moved marks must be refreshed through Texas811 before work continues.

What affects the cost of directional boring near US 190 in Oakhurst?

The cost depends on the route and work scope near US 190, not just the footage. Bore length, pipe or conduit size, Woodville soil and clay, exposed utilities, pavement, drainage crossings, pits and excavator time all matter. Mobilization from the Yukon office also affects planning for Oakhurst.

Where the Oakhurst facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Oakhurst

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Oakhurst, Texas

Type the address of your job in Oakhurst. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Oakhurst

Same county: Shepherd · Coldspring. All counties: Texas county list.