Riverside Texas Directional Boring: Falba Soil, Texas State Highway 19 and Trinity River

Quick Answer: Riverside is a small incorporated city in Walker County, where city streets belong to the city and we take directional boring, also called horizontal directional drilling (HDD), for Trinity River routes. Texas State Highway 19 is one local route to plan around. Our Yukon, Oklahoma main office is 402 road miles away, affecting mobilization near FM 980. The USDA soil survey maps bedrock at about 40 inches across 85 percent of Riverside, so crews may shift to slower rock drilling.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Riverside bores at a glance

  • Incorporated city in Walker County, Texas. Population 612 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 402 miles, about 7.8 hours of driving.
  • Ground: Falba soil is mapped on 65 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 92 percent of the area.
  • Highways inside the boundary: Texas State Highway 19, FM 980 and FM 405. State permit office: TxDOT Bryan District.
  • Railroad track inside the boundary: Union Pacific, with 2 mapped street and rail crossings.
  • Named streams inside the boundary: Trinity River, Bethy Creek and Caney Creek.
  • Public water: Riverside Special Utility District, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near Riverside’s Lake Road?

Riverside is a small incorporated city in Walker County, where Trinity Boring Solutions takes directional boring work and city streets belong to the city. The Census Bureau Vintage 2024 estimate gives Riverside 612 residents, a population we consider when planning underground work. We install water, sewer, gas, electric conduit and fiber lines, including routes along Lake Road or Front Street that need to pass below pavement or driveways.

Our main office is in Yukon, Oklahoma, and Riverside work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have gone more than 25 years without a utility strike, a record relevant around Riverside Special Utility District water lines and electric service reported in Walker County. Our family business began in 1965, and we have done directional boring since 1982; that experience informs how we plan Riverside work.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Riverside’s Falba soil map show?

The USDA soil survey maps Falba soil across 65 percent of Riverside, with Falba fine sandy loam on 29 percent and Falba and Arol soils on 26 percent. Fine sandy loam is the mapped surface texture across 85 percent of the city. At about 40 inches below the surface, bedrock is the mapped texture across 85 percent, while loamy fine sand accounts for 7 percent; average clay content at that depth is 8 percent. These are mapped patterns, not a log of a Lake Road bore.

USDA soil survey, inside the Riverside city limitsWhat is mapped
Soil series mappedFalba 65 percent, Kitterll 20 percent and Elmina 7 percent
Texture at the surfacefine sandy loam 85 percent and loamy fine sand 7 percent
Texture about 40 inches downbedrock 85 percent and loamy fine sand 7 percent
Engineering class about 40 inches downsilty clayey sand (SC SM) 7 percent
Average clay content about 40 inches down8 percent
Bedrock mapped within 60 inches92 percent of the area (0 percent hard rock, 92 percent weathered rock)
Seasonal water table within 60 inches72 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel72 percent of the area

The USDA soil survey maps weathered bedrock within 60 inches across 92 percent of Riverside, with a typical depth of 29 inches. That can slow drilling compared with soil, although hard bedrock is not mapped in that depth range. Seasonal water tables are mapped within 60 inches across 72 percent, so pits may need pumping. No flood prone soil area is mapped. High steel corrosion risk covers 72 percent, so the line owner should consider casing and tracer wire materials. The Catahoula Formation is Cenozoic and includes mudstone, sand and conglomerate, indicating varied material for a bore.

How do crews bore through Riverside’s mapped bedrock?

Riverside’s Falba soil and shallow weathered bedrock call for checking the ground as the bore advances. We expose marked utilities first, then track the drill head and adjust the approach to the material.

  1. With fine sandy loam mapped across 85 percent of Riverside, we use drilling fluid to support loose ground and stage reaming where the route needs it.
  2. Because weathered bedrock is mapped within 60 inches across 92 percent of Riverside, crews check the changing material and allow for slower drilling through rock.
  3. Seasonal water tables are mapped within 60 inches across 72 percent of Riverside, so we keep pits compact and pump them if water collects.
  4. Near Lake Road, we hydrovac expose marked utilities before the drill approaches, then use a walkover locator to track depth and pitch.
Rock bit on the drill rod at the front of a Vermeer D24x40 S3 with broken sandstone at the entry of a rock bore in Guthrie, OK
Rock bit on the drill rod with broken sandstone at the entry of a rock bore in Guthrie, Oklahoma.

What does a bore have to cross in Riverside near the Trinity River?

Riverside has Texas State Highway 19, FM 980 and FM 405 within its limits, so a route may need to pass beneath state highway pavement or local streets. Lake Road is the longest named street at 1.25 miles in the city, followed by Front Street at 0.88 miles and Shorewood Drive at 0.84 miles. A bore can keep pavement and driveways uncut, but the route and access points still need to fit the street and highway crossing.

CrossingTypeMapped extentWho has a say
Texas State Highway 19State highway2.5 roadway miles insideState highway office
FM 980State highway2.3 roadway miles insideState highway office
FM 405State highway0.9 roadway miles insideState highway office
Union PacificRailroad1.66 track miles insideThe railroad
Trinity RiverStream0.78 channel miles insideChecked for Corps of Engineers jurisdiction
Bethy CreekStream0.6 channel miles insideChecked for Corps of Engineers jurisdiction
Caney CreekStream0.07 channel miles insideChecked for Corps of Engineers jurisdiction
Bethea CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Livingston ReservoirStream nearby1 miles outsideChecked for Corps of Engineers jurisdiction
Livingston ReservoirLake or pond11,785 acres, insideChecked for Corps of Engineers jurisdiction
Campus LakeLake or pond12 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 1.66 track miles inside Riverside, and public records map 2 street and rail crossings in the city. A crossing of that track needs the railroad’s agreement, which establishes crossing conditions. The Trinity River runs 0.78 channel miles inside Riverside; Bethy Creek runs 0.6 miles and Caney Creek 0.07 miles. Public records map 5 street crossings of named streams. Livingston Reservoir is also mapped inside the limits, so water crossings need jurisdiction checked during planning.

Who has to sign off on a Riverside bore under Texas State Highway 19?

For work in the Texas State Highway 19 right of way, the utility that owns the line applies to TxDOT through its online RULIS system, and the TxDOT Bryan District reviews it. We prepare the bore plan and profile for the utility owner’s application and work under its permit. TxDOT cover rules call for 60 inches at crossings for electric, communication and water lines, 48 inches for electric and communication lines running along the right of way, and 36 inches for water lines running along it; pressurized sewer crossings need 60 inches. Existing highway pavement is bored or tunneled beneath, and the line is encased. A Union Pacific crossing needs the railroad’s agreement, while the Trinity River and creek crossings are checked for U.S. Army Corps of Engineers jurisdiction.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried in Riverside and Walker County?

The Riverside Special Utility District operates the public water system using groundwater wells; it reports 2,082 service connections and a population served of 6,246. For electric service in Walker County, utilities reporting to EIA are Entergy Texas, Houston County Electric Cooperative, Mid-South Electric Cooperative Association and Sam Houston Electric Cooperative. Before a conduit bore near Johnson Street, we confirm which company owns the line at that address rather than assume one provider serves every Riverside property.

Line ownerWhat it isSourceSize
Riverside Special Utility DistrictPublic water systemGroundwater wells2,082 connections, 6,246 people served
Entergy Texas, Houston County Electric Cooperative, Mid-South Electric Cooperative Association and Sam Houston Electric CooperativeElectric utilities reporting service in Walker CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Riverside’s median housing year at 2000, which we consider when planning underground work. The estimates show 50 percent of homes built from 1960 to 1999 and 50 percent in 2000 or later, with none built before 1960. A Front Street project could involve a replacement line or a new service; the housing figures do not date individual buried utilities. We hydrovac expose marked lines before drilling near them, since locate paint shows position, not depth.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

What is near Riverside, including Trinity?

Riverside is in Walker County, 13.8 miles northeast of county seat Huntsville and near the Trinity community. The city covers 2.01 square miles at an elevation of 193 feet, with ZIP codes 77320 and 77367. Trinity is 6.8 miles north, Westwood Shores is 7.4 miles northeast, Oakhurst is 9.1 miles southeast and Point Blank is 13.0 miles southeast. Huntsville, the nearest larger city, is 13.8 miles southwest. From our Yukon, Oklahoma main office, Riverside is 402 road miles and a 7.8 hour drive, a distance that affects mobilization.

Places near Riverside

What would we bore near Riverside’s Shorewood Drive?

  • Highway crossing: A Texas State Highway 19 bore goes beneath the pavement rather than opening a trench across the roadway.
  • Water service: A connection near Lake Road can link to the Riverside Special Utility District system, with the route checked against existing lines.
  • Fiber drop: A fiber conduit along Front Street can pass below pavement and driveways while keeping the surface route intact.
  • Creek crossing: A Bethy Creek bore needs a route planned for the channel and a check of U.S. Army Corps of Engineers jurisdiction.
  • Rail crossing: A bore beneath the Union Pacific track needs the railroad’s agreement and its crossing conditions.
  • Electric conduit: Near Shorewood Drive, we confirm the line owner and expose marked utilities before drilling the conduit route.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Riverside bore near Johnson Street?

For a Johnson Street quote, give us the address or map pin, then say what will go in the ground, such as water or fiber. Tell us the pipe or conduit size and the footage along the route. A sketch or plans help show whether the line approaches Front Street, a driveway or another crossing.

The price follows the work required, not one feature alone. Riverside’s shallow weathered bedrock can change drilling time, and a Texas State Highway 19 or Union Pacific crossing adds crossing planning. We also consider length, pipe or conduit size, utilities to expose, pavement, creek or drainage crossings, pits, excavator time and sand backfill. Mobilization matters because Riverside is 402 road miles from Yukon; high profile or emergency work can change the scope.

Questions people ask about boring in Riverside

Does Trinity Boring Solutions take directional boring jobs in Riverside and Walker County, and who staffs them?

Yes. We take directional boring work in Riverside and staff it with our own crews or from satellite yards run by partner drilling contractors we have vetted. For Riverside planning, we work with Trinity from the first call through the bore log, whatever crew is assigned to the work. The route and locate plan still need to account for Riverside streets such as Lake Road.

Who runs Riverside’s public water system, and where does its water come from?

The Riverside Special Utility District operates the public water system, which uses groundwater wells. It reports 2,082 service connections and a population served of 6,246. For a bore near Front Street, the specific water lines along the proposed route still need to be located and exposed before drilling.

Which electric utilities report service in Walker County near Riverside, and who confirms conduit specs?

Entergy Texas, Houston County Electric Cooperative, Mid-South Electric Cooperative Association and Sam Houston Electric Cooperative report electric service in Walker County. Those county records do not identify the provider at each Riverside address. We confirm the line owner before planning a conduit bore near Johnson Street, and the owner confirms the conduit requirements.

Who controls Riverside streets such as Shorewood Drive, and does a bore require cutting the road?

Since Riverside is incorporated, we account for city responsibility when planning boring beneath its city streets. A directional bore beneath Shorewood Drive can avoid cutting across the pavement; the route still needs suitable entry and exit pits. If work reaches Texas State Highway 19 right of way, TxDOT permit rules apply.

How old are Riverside homes and buried lines near Front Street, and what does that mean for replacement bores?

The American Community Survey 2019 to 2023 estimates put Riverside’s median housing year at 2000, with 50 percent built from 1960 to 1999 and 50 percent in 2000 or later. That does not establish the age of a Front Street utility. A bore may serve a replacement or a new connection, and marked lines must be exposed before drilling nearby.

Can groundwater or flooding affect bore pits near Riverside’s Trinity River?

Groundwater can affect pits: the soil survey maps a seasonal water table within 60 inches across 72 percent of Riverside. It maps no flood prone soil area, but that does not rule out water at a Trinity River crossing. We plan pit placement and check water crossing jurisdiction during planning.

How far is Riverside from Trinity’s Yukon office, and does Huntsville change the job plan?

From our Yukon, Oklahoma main office, Riverside is 402 road miles away and a 7.8 hour drive for project planning. Huntsville is 13.8 miles southwest and is the nearest larger city, but the Yukon distance can affect mobilization. A route near Texas State Highway 19 also needs to be reviewed for right of way work.

How much notice does Texas811 need for a Riverside bore near Lake Road, and what if marks change?

For a Lake Road bore, submit the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If our start slips more than 14 days past the original notice, we submit a new request before proceeding. When marks are worn or moved, we have them refreshed through Texas811 before our work continues.

What affects the cost of a Riverside bore near Texas State Highway 19?

The job details determine the price, including footage, pipe or conduit size, Riverside’s soil and rock, utilities to expose, pavement and crossings. A Texas State Highway 19 route or a Union Pacific track crossing adds planning requirements. The distance from Yukon, pits, excavator time, backfill and emergency or high profile work also affect the job.

Where the Riverside facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Riverside

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Riverside, Texas

Type the address of your job in Riverside. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.