Shepherd Texas Directional Boring: Segno Fine Sandy Loam, US 59 and Big Creek

Quick Answer: Can we get a line under US 59, the Union Pacific track or Big Creek without cutting it? Yes, Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Shepherd and across Texas. The Yukon, Oklahoma main office is 439 road miles away, a factor for a bore along Byrd Avenue. The USDA maps Segno fine sandy loam across 17 percent of Shepherd, so we plan for changing ground along the bore path.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Shepherd bores at a glance

  • Incorporated city in San Jacinto County, Texas. Population 1,979 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 439 miles, about 8.6 hours of driving.
  • Ground: Segno soil is mapped on 23 percent of the area, with loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 4 percent of the area.
  • Highways inside the boundary: US 59, Loop 424, Texas State Highway 150, FM 222 and FM 223. State permit office: TxDOT Lufkin District.
  • Railroad track inside the boundary: Union Pacific, with 6 mapped street and rail crossings.
  • Named streams inside the boundary: Big Creek, Yates Creek and Coley Creek.
  • Public water: City of Shepherd, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring in Shepherd near Big Creek?

The question is whether we can get your line beneath US 59, the Union Pacific track or Big Creek without cutting it; in Shepherd, we can plan that bore. Shepherd is in San Jacinto County and has a Census Bureau Vintage 2024 estimate of 1,979 residents. We install water, sewer, gas, electric conduit and fiber for routes along Byrd Avenue or across town streets.

Our main office is in Yukon, Oklahoma, and Shepherd work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For Shepherd work, our range covers a 3/4 inch service line near Main Street through 48 inch casing for a longer crossing. For directional boring planning near Union Pacific track in Shepherd, our family business draws on roots dating to 1965 and experience since 1982.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show about Shepherd’s Segno soil?

The USDA soil survey maps Segno soil across 23 percent of Shepherd, including Segno fine sandy loam on 17 percent of the city. Splendora fine sandy loam covers another 15 percent, while Choates loamy fine sand accounts for 11 percent. About 40 inches below the surface, loam is mapped across 39 percent and sandy clay loam across 26 percent. Average clay content at that depth is 25 percent. These mapped patterns guide planning, but they are not test borings; conditions along Byrd Avenue can differ.

USDA soil survey, inside the Shepherd city limitsWhat is mapped
Soil series mappedSegno 23 percent, Splendora 15 percent, Choates 11 percent, Hatliff 11 percent and Boykin 8 percent
Texture at the surfacefine sandy loam 49 percent, loamy fine sand 22 percent and loam 14 percent
Texture about 40 inches downloam 39 percent, sandy clay loam 26 percent and fine sandy loam 11 percent
Engineering class about 40 inches downlean clay (CL) 53 percent, clayey sand (SC) 21 percent and silty clayey sand (SC SM) 11 percent
Average clay content about 40 inches down25 percent
Bedrock mapped within 60 inches4 percent of the area (0 percent hard rock, 4 percent weathered rock)
Seasonal water table within 60 inches45 percent of the area
Flood prone soils13 percent of the area
High corrosion risk for uncoated steel45 percent of the area

The survey maps bedrock within 60 inches in 4 percent of Shepherd and none within 40 inches, so that does not rule out deeper rock. A seasonal water table is mapped within 60 inches across 45 percent of the city, and flood prone soils cover 13 percent. In Shepherd, we account for the mapped high steel corrosion risk across 45 percent when planning underground boring materials and protection. The geologic map shows Alluvial sand, silt, and clay of Pleistocene age. Mixed deposits and wet ground near Big Creek call for checking the route and managing fluid and pits carefully.

How do we drill Shepherd’s loam and sandy ground?

Shepherd’s Segno fine sandy loam and mapped seasonal water table call for a bore plan that matches the route, not just the soil name. We use horizontal directional drilling (HDD) and adjust as ground conditions appear.

  1. Segno fine sandy loam and mapped sandy deposits can cave behind the bit, so we use drilling fluid and staged reaming to support the hole.
  2. With a seasonal water table mapped across 45 percent of Shepherd, we keep pits controlled and pump water if the Main Street work area fills.
  3. At Big Creek, we plan depth beneath the channel and check the crossing for possible U.S. Army Corps of Engineers jurisdiction.
  4. Before a bore near Union Pacific track, we hydrovac expose marked utilities and track the drill head from the surface as depth and pitch are logged.
Walkover locator held over a flowing creek while tracking the drill head on a 385 foot rock bore in Guthrie, Oklahoma
Tracking the drill head with a walkover locator over a flowing creek on a 385 foot bore in Guthrie, Oklahoma.

What does a bore have to cross in Shepherd near US 59?

Shepherd has 7.5 mapped roadway miles of US 59 within its limits, along with 3.0 miles of Loop 424 and 1.8 miles of Texas State Highway 150. FM 222 and FM 223 are also inside the city. Those routes can put a bore near state highway pavement or right of way. Byrd Avenue is the longest named street at 4.77 miles in the city, followed by Tx 150 at 2.66 miles and Main Street at 1.75 miles. Railroad Avenue adds another 1.64 miles of named route.

CrossingTypeMapped extentWho has a say
US 59US highway7.5 roadway miles insideState highway office
Loop 424State highway3 roadway miles insideState highway office
Texas State Highway 150State highway1.8 roadway miles insideState highway office
FM 222State highway1 roadway miles insideState highway office
FM 223State highway0.6 roadway miles insideState highway office
Union PacificRailroad3.56 track miles insideThe railroad
Big CreekStream2.08 channel miles insideChecked for Corps of Engineers jurisdiction
Yates CreekStream0.55 channel miles insideChecked for Corps of Engineers jurisdiction
Coley CreekStream0.23 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific track runs 3.56 miles through Shepherd on the Lufkin Subdivision, and public records map 6 street and rail crossings in the city. Big Creek has 2.08 channel miles here; Yates Creek and Coley Creek have 0.55 and 0.23 miles. One mapped street crossing intersects a named stream. A bore near Big Creek needs a route planned around the channel, and creek crossing planning checks whether the U.S. Army Corps of Engineers has jurisdiction.

Who approves Shepherd bores near Union Pacific and US 59?

For US 59, Loop 424, Texas State Highway 150 and the farm to market roads in Shepherd, TxDOT reviews utility work in the Lufkin District. The utility owner applies in TxDOT’s RULIS system; we prepare the bore plan and profile and work under the owner’s permit. A Union Pacific track crossing requires an agreement with the railroad, which sets crossing conditions such as casing, depth and flagging. Shepherd’s city streets belong to the city itself. For a Big Creek crossing, planning includes a check for U.S. Army Corps of Engineers jurisdiction.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried near the City of Shepherd water system?

The City of Shepherd public water system uses groundwater wells and reports 1,245 service connections serving 3,411 people. Before a water bore along Main Street, we identify marked lines and expose each utility on the path with hydrovac potholing. Entergy Texas and Sam Houston Electric Cooperative report electric service in San Jacinto County; we confirm the line owner for the specific address before planning an electric conduit bore.

Line ownerWhat it isSourceSize
City of ShepherdPublic water systemGroundwater wells1,245 connections, 3,411 people served
Entergy Texas and Sam Houston Electric CooperativeElectric utilities reporting service in San Jacinto CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates place Shepherd’s median housing year at 1980, useful context when planning underground work around existing properties. Shepherd’s housing estimates show 13 percent of homes built before 1960, 66 percent from 1960 to 1999 and 21 percent in 2000 or later; we use that age mix as context when planning underground work. Work along older streets such as Byrd Avenue may involve replacing existing lines, while newer services need their own route checked. Locate marks show position, not depth, so marked utilities are exposed before drilling near them.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

Do you cover Shepherd and nearby Cleveland?

Shepherd is an incorporated city in San Jacinto County, at 186 feet elevation, with 6.1 square miles of land and ZIP code 77371. Goodrich is 9.3 miles northeast; North Cleveland is 10.1 miles southwest, as is Coldspring to the northwest. Cleveland, the nearest larger city, is 11.3 miles southwest. Coldspring is the county seat, 10.1 miles northwest. From our Yukon, Oklahoma yard, Shepherd is 439 road miles away and an 8.6 hour drive, which can affect mobilization for a Byrd Avenue or rural route.

Places near Shepherd

What would we bore near Shepherd’s Main Street?

  • Highway crossing: A US 59 bore can pass beneath existing pavement rather than cut across the roadway.
  • Water service: A connection near Main Street can tie into the City of Shepherd system after the route and existing lines are checked.
  • Fiber route: Byrd Avenue’s 4.77 miles within Shepherd offer a local corridor to assess for conduit placement.
  • Creek crossing: A Big Creek bore needs a planned path below the channel and a jurisdiction check during planning.
  • Rail crossing: A bore under the 3.56 miles of Union Pacific track in Shepherd needs the railroad’s crossing agreement.
  • Street service: A short electric conduit bore near Railroad Avenue starts with confirming the line owner and exposing marked utilities.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Shepherd bore near Byrd Avenue?

For a quote near Byrd Avenue, start with the address or map pin, then tell us what will go underground. Include the pipe or conduit size and estimated footage, such as a service connection near Main Street or a crossing near US 59. A sketch or plans help us see pits, access and nearby lines before we scope the work.

A short, clear route through Segno soil with easy access can be simpler to plan than a bore with several marked utilities or pavement. Length, pipe size, soil and rock, utility exposures, concrete, pits, excavator time and sand backfill all affect the job. A Big Creek crossing adds drainage planning, while a US 59 route may need highway permitting. Shepherd’s 439 road miles from Yukon also shape mobilization.

Questions people ask about boring in Shepherd

Does Trinity take directional boring work in Shepherd and San Jacinto County?

Yes, we take directional boring work in Shepherd and across Texas. Our own crews and partner contractor crews support jobs from the Yukon office and vetted satellite yards, rather than a Shepherd base. You work with Trinity from the first call through the bore log, including for a route near Big Creek.

Will a Shepherd bore hit rock below the soil?

The Shepherd survey maps bedrock within 60 inches in 4 percent of the area and none within 40 inches, but deeper rock is still possible. The geologic map shows Pleistocene Alluvial sand, silt, and clay. A route near Segno soil needs planning from the site conditions, not just the map.

Who approves a Shepherd bore under US 59?

TxDOT reviews utility work on US 59 through its Lufkin District. The line owning utility submits the application in TxDOT’s RULIS system, and we provide the bore plan and profile for work under that permit. A bore below existing highway pavement is installed by boring or tunneling, not open trenching.

What does a Shepherd bore under Union Pacific track require?

Union Pacific owns the 3.56 track miles mapped in Shepherd. A crossing needs an agreement with the railroad, which sets details such as casing, depth and flagging. If the line also occupies highway right of way, TxDOT asks for a copy of that agreement.

Can you bore a line beneath Big Creek in Shepherd?

A bore beneath Big Creek can be planned, with the path and depth set for the channel crossing. The creek has 2.08 channel miles in Shepherd, and 13 percent of the city is mapped with flood prone soils. Creek crossing planning checks for U.S. Army Corps of Engineers jurisdiction.

Who runs Shepherd’s water system, and where does its water come from?

The City of Shepherd owns the public water system, which draws from groundwater wells. It reports 1,245 service connections and 3,411 people served. For a new bore near Main Street, we locate and expose marked utilities so the proposed route can be checked against existing water lines.

Does Trinity cover Goodrich and rural sites outside Shepherd?

Yes, we take work in nearby Goodrich and rural locations beyond Shepherd’s limits, as well as elsewhere in Texas. Goodrich is 9.3 miles northeast of Shepherd. The Yukon office is 439 road miles away, so location and access are part of planning mobilization for an out of town bore.

How early should I call Texas811 for a bore along Byrd Avenue in Shepherd?

The locate request for a Byrd Avenue bore must be made at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If the start slips more than 14 days past the notice, make a new request. Before work continues in Shepherd, we arrange to have worn or moved marks refreshed through Texas811.

What affects the cost of a Shepherd directional bore near US 59?

The route, footage, pipe size, soil, utility exposures, pavement, pits and equipment time all affect a US 59 bore. A Big Creek drainage crossing or Union Pacific track crossing adds planning details. Mobilization also matters because Shepherd is 439 road miles from the Yukon office. We assess the specific job rather than use one factor alone.

Where the Shepherd facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Shepherd

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Shepherd, Texas

Type the address of your job in Shepherd. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Shepherd