Providence Village Texas Directional Boring: Gasil Fine Sandy Loam, US 380 and Running Branch
Quick Answer: The Town of Providence Village owns the public water system, and Oncor Electric Delivery Company reports electric service in Denton County; we confirm the line owner before a conduit bore. We take directional boring, also called horizontal directional drilling (HDD), work near Running Branch and US 380. Our Yukon, Oklahoma, office is 190 road miles from Fishtrap Road. USDA maps Gasil fine sandy loam over 29 percent of town; deeper sandy clay loam can grip pipe, so we ream in stages.
Providence Village bores at a glance
- Incorporated city in Denton County, Texas. Population 10,350 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 190 miles, about 3.8 hours of driving.
- Ground: Gasil soil is mapped on 30 percent of the area, with sandy clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 4 percent of the area.
- Highways inside the boundary: US 380 and FM 2931. State permit office: TxDOT Dallas District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Running Branch and Pecan Creek.
- Public water: Town of Providence Village, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can bore a line near Running Branch in Providence Village?
Providence Village is in Denton County, where the Census Bureau Vintage 2024 estimate puts the population at 10,350. We take water, sewer, gas, electric conduit and fiber work, including service runs along Brewer Road and connections crossing FM 2931. Before an electric conduit route is set, we identify the line owner because several utilities report service in the county.
Our main office is in Yukon, Oklahoma, and Providence Village work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore ran roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa; a new service along FM 2931 is smaller by comparison. Our family business started in 1965, and directional boring has been part of our work since 1982, including utility routes like Brewer Road.

What ground should a bore expect in Providence Village near Gasil soil?
The USDA soil survey maps Gasil soil across 30 percent of Providence Village, with Gasil fine sandy loam, 1 to 3 percent slopes, covering 29 percent. Callisburg soil accounts for 24 percent, and Silstid for 13 percent. About 40 inches below the surface, sandy clay loam is mapped under 37 percent of the area, sandy clay under 26 percent and clay under 17 percent. That mix can change along a bore path. The sandy surface cuts readily, while the deeper clay can hold the hole and cling to the reamer.
| USDA soil survey, inside the Providence Village city limits | What is mapped |
|---|---|
| Soil series mapped | Gasil 30 percent, Callisburg 24 percent, Silstid 13 percent, Wilson 11 percent and Crockett 8 percent |
| Texture at the surface | fine sandy loam 71 percent, loamy fine sand 15 percent and clay loam 13 percent |
| Texture about 40 inches down | sandy clay loam 37 percent, sandy clay 26 percent and clay 17 percent |
| Engineering class about 40 inches down | lean clay (CL) 70 percent, silty sand (SM) 14 percent and fat clay (CH) 12 percent |
| Average clay content about 40 inches down | 31 percent |
| Bedrock mapped within 60 inches | 4 percent of the area (0 percent hard rock, 4 percent weathered rock) |
| Seasonal water table within 60 inches | 8 percent of the area |
| Flood prone soils | 3 percent of the area |
| High corrosion risk for uncoated steel | 47 percent of the area |
The soil survey maps bedrock within 60 inches in 4 percent of Providence Village, with typical depth listed as 33 inches, so a route may meet shallow rock. Seasonal water tables are mapped within 60 inches in 8 percent of the area, and flood prone soils in 3 percent; pits near Running Branch need attention to water and channel depth. High steel corrosion risk is mapped in 47 percent, so the line owner should consider casing and tracer wire materials. The geologic map shows the Cenomanian Woodbine Formation, with beds of sand, clay, sandstone and shale.
How do we bore through Providence Village sandy clay loam?
USDA maps sandy clay loam under about 40 inches in much of Providence Village. We match the bore setup to that deeper ground and to the surface soil along streets such as Brewer Road.
- We hydrovac pothole marked utilities along Brewer Road before the drill approaches them; locator paint shows where a line lies, not its depth.
- Where Gasil fine sandy loam gives way to sandy clay loam, we use staged reaming and a fluid mix suited to clay that can cling to the tool.
- As the head advances near FM 2931, we track it from the surface and record depth and pitch to keep the planned line on course.
- We have the pipe ready before the final ream in sandy ground, which can cave behind the bit along a route near Running Branch.

What could a new line cross in Providence Village near US 380?
US 380 and FM 2931 run inside Providence Village, and US 377 is 0.8 miles from the town limits. A line crossing US 380 or FM 2931 needs a route and depth that fit the highway corridor. Fishtrap Road is the longest named street inside town at 1.7 miles. Dr Sanders Road runs 0.9 miles, and Brewer Road runs 0.86 miles. Those streets offer likely service routes, but the exact address determines which pavement, driveways and buried lines fall in the bore path.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 380 | US highway | 0.5 roadway miles inside | State highway office |
| FM 2931 | State highway | 3.3 roadway miles inside | State highway office |
| US 377 | Highway nearby | 0.8 miles outside | State highway office |
| Running Branch | Stream | 0.97 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Pecan Creek | Stream | 0.3 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Little Elm Creek | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
| Lewisville Lake | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
| Lake Lewisville | Lake or pond | 1,137 acres, nearby | Checked for Corps of Engineers jurisdiction |
| Lewisville Lake | Lake or pond | 386 acres, nearby | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Providence Village or within one mile of its limits, and no street and rail crossings are mapped. Running Branch runs 0.97 channel miles in town, while Pecan Creek runs 0.3 miles; one mapped street crossing of a named stream is recorded. Little Elm Creek is 0.9 miles from the limits, and Lewisville Lake is also 0.9 miles away. A bore at a creek or lake crossing needs planning for the channel and a check for federal water jurisdiction.
Who approves a Providence Village bore in Denton County?
Providence Village is an incorporated town, so its local streets are under town jurisdiction. For work in the right of way of US 380, FM 2931 or nearby US 377, the line owner, not the driller, submits the utility permit application through TxDOT’s RULIS system. The TxDOT Dallas District reviews it. We prepare the bore plan and profile for the utility owner and work under the permit issued to that owner. For electric and communication lines crossing a highway, the usual cover is 60 inches below the lowest crossed grade; along the right of way it is 48 inches. Running Branch crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities are in Providence Village near the Town of Providence Village system?
The Town of Providence Village public water system uses purchased surface water and serves 7,128 people through 2,376 service connections. For an electric conduit route near FM 2931, the owner must be identified before the bore is planned. Utilities reporting electric service in Denton County include Oncor Electric Delivery Company, Texas-New Mexico Power, City of Denton, Cooke County Electric Cooperative Association, Denton County Electric Cooperative, Tri-County Electric Cooperative and Wise Electric Cooperative. The county list does not identify which provider serves a particular address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Town of Providence Village | Public water system | Surface water bought from another system | 2,376 connections, 7,128 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, City of Denton, Cooke County Electric Cooperative Association, Denton County Electric Cooperative, Tri-County Electric Cooperative and Wise Electric Cooperative | Electric utilities reporting service in Denton County | EIA Form 861 | Confirm the line owner by address |
American Community Survey 2019 to 2023 five year estimates put the median housing year at 2009; 98 percent of homes were built in 2000 or later, and 2 percent from 1960 to 1999. That age profile points to many newer service connections, though a project may also replace an existing line. Along Brewer Road, we hydrovac expose each marked utility on the bore path before drilling near it, because paint shows position, not depth.

How far is Providence Village from Little Elm and our Yukon office?
Providence Village is in Denton County at an elevation of 570 feet and covers 2.76 square miles. Its ZIP code is 76227. Paloma Creek is 1.4 miles southeast, Paloma Creek South is 2.4 miles southeast, and Cross Roads is 2.6 miles southwest. Little Elm, the nearest larger city, is 3.8 miles southeast; Denton, the county seat, is 10.8 miles west. The Yukon yard is 190 road miles away, or about 3.8 hours by car, which makes mobilization part of planning for work near Fishtrap Road.
Places near Providence Village
- Paloma Creek: 1.4 miles southeast
- Paloma Creek South: 2.4 miles southeast
- Cross Roads: 2.6 miles southwest
- Savannah: 2.9 miles east
- Krugerville: 3.3 miles northwest
- Directional boring in Little Elm: 3.8 miles southeast
Which jobs call for a bore in Providence Village near Brewer Road?
- Highway crossing: A US 380 bore needs a route beneath the highway corridor, with depth and casing addressed through the TxDOT permit.
- Water service: A connection near the Town of Providence Village system may need a path beneath a street or driveway without cutting the surface.
- Fiber route: A fiber bore along FM 2931 needs marked utilities exposed where the planned conduit passes them.
- Creek crossing: A Running Branch bore must account for channel depth and be checked for U.S. Army Corps of Engineers jurisdiction.
- Street connection: A service crossing Brewer Road can use pits on each side to leave the pavement intact.
- Drainage route: Near Pecan Creek, a bore plan needs to account for the mapped channel and the lines crossing its path.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a Providence Village bore near Fishtrap Road?
Start with a map pin or address, especially for a route near Fishtrap Road or Running Branch, where the exact crossing location changes the plan. Tell us what will go in the ground, the pipe or conduit size and the footage. A sketch or plans help us see the route, pits and nearby streets before we scope the work.
The job details set the price. Gasil soil and deeper sandy clay loam affect drilling and reaming; a US 380 crossing adds highway planning, while a Running Branch crossing brings channel conditions into the scope. We also account for line size and length, utilities to expose, pavement or concrete, pits, excavator time and sand backfill. The 190 road miles from Yukon affect mobilization, and urgent or high profile work can add planning demands.
Questions people ask about boring in Providence Village
Does Trinity take directional boring work in Denton County’s Providence Village, and who staffs it?
Yes. We take directional boring work in Providence Village, with our own crews and partner drilling contractors Trinity has vetted available for the work. You coordinate with Trinity from the initial call through the bore log, including when a crew is working near Brewer Road or FM 2931.
What ground does a Providence Village bore meet in Gasil soil?
The USDA soil survey maps Gasil soil across 30 percent of Providence Village, while sandy clay loam appears under 37 percent of the area at about 40 inches. That deeper clay can hold the hole and build up on a reamer. We adjust the fluid and reaming approach to the ground on a route near Fishtrap Road.
Could a Providence Village bore near Running Branch hit rock?
It could. Bedrock is mapped within 60 inches in 4 percent of the area, and the survey lists typical depth as 33 inches. The geologic map shows the Cenomanian Woodbine Formation, including sandstone and shale. A route near Running Branch needs site specific planning rather than an assumption that the full bore is soil.
Who approves a bore under US 380 in Providence Village?
The utility owner files the right of way application, not the driller, through TxDOT’s RULIS system. The TxDOT Dallas District reviews a US 380 permit. We prepare the bore plan and profile for that owner, and the permit sets the allowed work and depth for the crossing.
Can a line go under Running Branch in Providence Village?
A bore can be planned under Running Branch, which has 0.97 channel miles inside town. The route needs to stay beneath the channel, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. Potholing and a suitable entry and exit location help keep the creek banks uncut.
Who runs Providence Village water, and where does its water come from?
The Town of Providence Village owns the public water system, which uses purchased surface water. Public records show 2,376 service connections serving 7,128 people. For a new water line near FM 2931, we still need the exact route and marked utilities before planning the bore.
Can I reach Trinity after hours about an urgent Providence Village bore on Brewer Road?
Yes. A person answers our phone 24 hours a day at (405) 409-7423, including for an urgent issue near Brewer Road. Trinity also offers emergency response, and the scope can depend on the location, the line involved and access for equipment.
How early should I request locates for a Providence Village bore near Fishtrap Road?
Call Texas811 at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays; the request cannot be more than 14 days early. If a Fishtrap Road start slips more than 14 days past the original notice, request a new ticket. Have worn or moved marks refreshed through Texas811 before work continues.
What affects the cost of a Providence Village directional bore under US 380?
The scope drives the cost, including bore length and size, Gasil soil conditions, pavement, utilities to expose, pits and equipment time. A US 380 crossing adds highway planning, and the 190 road miles from Yukon affect mobilization. Creek or drainage crossings and emergency timing can also change the work involved.
Where the Providence Village facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Providence Village
- U.S. Census Bureau, TIGER/Line 2024: Providence Village boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Providence Village
- U.S. Census Bureau, American Community Survey 2019 to 2023: Providence Village housing units and year built
- Macrostrat geologic map compilation: map units under Providence Village
- U.S. EPA Safe Drinking Water Information System: public water systems serving Providence Village
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Denton County
- U.S. Geological Survey, Elevation Point Query Service: Providence Village elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Providence Village
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Providence Village
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Providence Village, Texas
Type the address of your job in Providence Village. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Providence Village
Same county: Denton · Lewisville · Frisco · Carrollton · Flower Mound · The Colony · Dallas · Corinth · Fort Worth · Highland Village · Trophy Club · Roanoke. All counties: Texas county list.
