trinityboringsolutions.com

Roanoke Texas Directional Boring: Frio Clay Loam, US 377 and Union Pacific

Quick Answer: Can we get a line beneath US 377 without cutting the pavement? Yes, Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), in Roanoke for routes beneath US 377. Roanoke is 196 road miles from our Yukon, Oklahoma main office, with Union Pacific track crossings also part of local routing. The USDA soil survey maps heavy clay at 40 inches across 61 percent of the area, so sticky cuttings and pressure need close control. We plan the bore around the route and ground.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Roanoke bores at a glance

  • Incorporated city in Denton County and Tarrant County, Texas. Population 10,895 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 196 miles, about 3.8 hours of driving.
  • Ground: Frio soil is mapped on 16 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 24 percent of the area.
  • Highways inside the boundary: US 377, Texas State Highway 114, Texas State Highway 114 Business, Loop 118 and Texas State Highway 170. State permit office: TxDOT Dallas District.
  • Railroad track inside the boundary: Union Pacific, with 17 mapped street and rail crossings.
  • Named streams inside the boundary: Cade Branch, Denton Creek and Henrietta Creek.
  • Public water: City of Roanoke, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring in Roanoke and Denton County?

Roanoke lies mostly in Denton County, and the Census Bureau Vintage 2024 estimate puts its population at 10,895. We take water, sewer, gas, electric conduit and fiber work, routing lines beneath Litsey Road, US 377 or a creek where the route allows. Our bores range from 10 feet to 5,000 feet, from service lines to large casing.

Our main office is in Yukon, Oklahoma, and Roanoke work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have focused on directional boring since 1982. That experience fits routes from Litsey Road service runs to crossings at US 377, with equipment for 3/4 inch service lines through 48 inch casing.

Ditch Witch directional drill rig with a loaded drill rod rack staged at a commercial jobsite
Our Ditch Witch directional drill with a full rack of drill rod staged at a commercial site. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show about Roanoke and Frio soil?

The USDA soil survey maps Frio as 16 percent of the soil series, with Frio clay loam map units covering 15 percent of Roanoke. Mingo, Sanger, Slidell and Ponder are also mapped. About 40 inches down, clay accounts for 27 percent of mapped texture and clay loam for 20 percent; the average clay content there is 41 percent. For Roanoke, we treat mapped patterns as planning guidance, not test borings. Along routes near Cade Branch, heavy clay can cling to the reamer and grip the pipe, so the bore plan needs to account for that resistance.

USDA soil survey, inside the Roanoke city limitsWhat is mapped
Soil series mappedFrio 16 percent, Mingo 12 percent, Sanger 11 percent, Slidell 8 percent and Ponder 8 percent
Texture at the surfaceclay loam 33 percent, clay 31 percent and loam 8 percent
Texture about 40 inches downclay 27 percent, bedrock 24 percent and clay loam 20 percent
Engineering class about 40 inches downfat clay (CH) 56 percent and lean clay (CL) 16 percent
Average clay content about 40 inches down41 percent
Bedrock mapped within 60 inches24 percent of the area (24 percent hard rock, 0 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils22 percent of the area
High corrosion risk for uncoated steel73 percent of the area

Bedrock is mapped within 40 inches across 24 percent of Roanoke, with typical depth listed as 25 inches, so the route may meet rock sooner in some mapped areas. The USDA soil survey does not map a seasonal water table within 60 inches, while flood prone soils cover 22 percent, a concern near Cade Branch. Across Roanoke, high steel corrosion risk is mapped across 73 percent, so we advise evaluating casing and tracer wire materials. The mapped Pawpaw Formation, Weno Limestone, and Denton Clay, undivided, is Albian; its clay, marl and limestone layers can change drilling resistance.

How do crews handle Roanoke clay?

Roanoke’s clay rich soil can stick to the reamer and tighten around a pipe. On routes near Cade Branch or US 377, we adjust fluid and reaming to the ground and keep the bore path under observation.

  1. Frio and other mapped clay soils can cling to the reamer, so we use a thinner fluid mix with polymer and open the hole in stages before pulling pipe.
  2. Where the Roanoke soil survey maps heavy clay, we watch fluid returns closely and moderate pressure to avoid lifting pavement along a route such as US 377.
  3. Near Cade Branch, flood prone soils call for a bore path planned beneath the channel; creek crossings are also checked for U.S. Army Corps of Engineers jurisdiction.
  4. For a route near Litsey Road, we pothole marked utilities with hydrovac before drilling close, then track the head from the surface and log depth and pitch.
Rock bit on the drill rod at the front of a Vermeer D24x40 S3 with broken sandstone at the entry of a rock bore in Guthrie, OK
Rock bit on the drill rod with broken sandstone at the entry of a rock bore in Guthrie, Oklahoma.

Which roads, tracks or creeks does a Roanoke bore cross near Union Pacific?

US 377, State Highway 114 and State Highway 114 Business run through Roanoke; Interstate 35 is 0.9 miles outside the city limits. A route beneath existing highway pavement needs boring or tunneling rather than an open cut. Litsey Road is the longest named street in the city, followed by Cannon Parkway and Schooling Road. Marshall Creek Road and Henrietta Creek Road are also local route references, so the exact crossing and available work area matter to the bore plan.

CrossingTypeMapped extentWho has a say
US 377US highway4 roadway miles insideState highway office
Texas State Highway 114State highway5.5 roadway miles insideState highway office
Texas State Highway 114 BusinessState highway1.9 roadway miles insideState highway office
Loop 118State highway0.2 roadway miles insideState highway office
Texas State Highway 170State highway0.2 roadway miles insideState highway office
Interstate 35Highway nearby0.9 miles outsideState highway office
Union PacificRailroad7.64 track miles insideThe railroad
Cade BranchStream3.83 channel miles insideChecked for Corps of Engineers jurisdiction
Denton CreekStream3.03 channel miles insideChecked for Corps of Engineers jurisdiction
Henrietta CreekStream1.54 channel miles insideChecked for Corps of Engineers jurisdiction
Graham BranchStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Elizabeth CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Marshall BranchStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Whites BranchStream nearby0.9 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 7.64 track miles inside Roanoke on the Choctaw Subdivision, and mapped layers show 17 street and rail crossings in the city. Cade Branch, Denton Creek and Henrietta Creek have mapped channels inside the limits, with 9 street crossings of named streams. A creek route needs depth planning beneath the channel. Grapevine Lake and Turner Lake are within one mile but outside Roanoke, so their proximity does not make them city crossings.

Who approves a Roanoke bore under US 377?

US 377 and State Highway 114 are state highways, so work in their right of way needs a TxDOT utility permit. The TxDOT Dallas District reviews Roanoke highway work. The utility that owns the line submits the application through TxDOT’s online RULIS system; we prepare the bore plan and profile and work under the owner’s permit. TxDOT requires boring or tunneling beneath existing highway pavement, and the permit may set cover depths. For Union Pacific track, the railroad’s crossing agreement sets casing, depth and flagging. A Cade Branch crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities serve Roanoke near the City of Roanoke water system?

The City of Roanoke public water system uses purchased surface water and reports 3,122 service connections serving 10,127 people. For electric service in Denton County, reporting utilities include Oncor Electric Delivery Company, Texas-New Mexico Power, City of Denton, Cooke County Electric Cooperative Association, Denton County Electric Cooperative, Tri-County Electric Cooperative and Wise Electric Cooperative. The provider at a specific Roanoke address needs to be identified before planning an electric conduit bore.

Line ownerWhat it isSourceSize
City of RoanokePublic water systemSurface water bought from another system3,122 connections, 10,127 people served
Oncor Electric Delivery Company, Texas-New Mexico Power, City of Denton, Cooke County Electric Cooperative Association, Denton County Electric Cooperative, Tri-County Electric Cooperative and Wise Electric CooperativeElectric utilities reporting service in Denton County and Tarrant CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Roanoke’s median housing year at 2007; 63 percent of homes were built in 2000 or later, and 37 percent from 1960 to 1999. That mix can mean both new service runs and replacement lines under streets such as Litsey Road. Before drilling near a marked utility, we use hydrovac potholing to expose it; paint shows position, not depth.

Exposed underground utility line in a hand dug potholing pit before a directional bore in Oklahoma
An existing utility line exposed in a pothole before a directional bore in Oklahoma.

What is near Roanoke, including Westlake?

Roanoke covers 6.89 square miles in Denton County, with a small part in Tarrant County, at an elevation of 629 feet. For underground planning in Roanoke, ZIP code 76262 identifies the service area. Westlake is 2.5 miles southeast, and Trophy Club is 3.6 miles southeast; Keller, the nearest larger city, is 5.7 miles south. Denton, the county seat, is 14.9 miles north. From our Yukon, Oklahoma yard, Roanoke is 196 road miles and a 3.8 hour drive, which can affect mobilization for a Litsey Road project.

Places near Roanoke

Which jobs call for a bore near Roanoke’s Litsey Road?

  • Highway crossing: A bore beneath US 377 or State Highway 114 avoids cutting existing pavement, with the utility owner handling the TxDOT permit.
  • Water service: A new or replacement line can run beneath Litsey Road toward a property, with the City of Roanoke system in the service area.
  • Fiber conduit: A route along Cannon Parkway can pass beneath pavement and marked utilities without opening a continuous trench.
  • Creek crossing: A bore beneath Cade Branch needs depth planning under the channel and a check for U.S. Army Corps of Engineers jurisdiction.
  • Rail crossing: A line beneath the Union Pacific Choctaw Subdivision needs the railroad’s crossing agreement for casing, depth and flagging.
  • Drainage route: A bore near Marshall Creek Road can avoid an open cut at a mapped drainage or street crossing.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of directional boring near Roanoke’s Marshall Creek Road?

A map pin matters near Marshall Creek Road because a small change in the route can change which street, utility or drainage feature the bore meets. Send the Roanoke address or pin, what will go underground, pipe or conduit size and footage. A sketch or plans help us check the crossing and access before preparing the scope.

The 196 road miles from Yukon affect mobilization, while Roanoke’s heavy clay can change reaming and fluid needs. Price also reflects bore length, pipe size, utilities to expose, pavement, creek crossings, pits, excavator time and sand backfill. A Union Pacific crossing or work under US 377 brings its own planning needs. High profile or emergency work can also affect the scope.

Questions people ask about boring in Roanoke

Does Trinity take directional boring jobs in Roanoke, Denton County?

Yes. We take directional boring work in Roanoke and across Texas, with our own crews and partner contractor crews from vetted satellite yards. For Roanoke projects, we coordinate with Trinity through the bore log, whoever is assigned to the site. For a route under Litsey Road or toward a Denton County property, we need the location and line details to scope the work.

For a bore under US 377 in Roanoke, which authority approves the crossing before we proceed?

TxDOT handles the highway right of way permit for a bore under US 377, and the TxDOT Dallas District reviews the application. The utility that owns the line files through the online RULIS system. We prepare the bore plan and profile for that filing, then work under the permit issued to the utility owner.

For a bore beneath Union Pacific track in Roanoke, what requirements must we meet before crossing?

A bore beneath Union Pacific’s Choctaw Subdivision requires a crossing agreement from the railroad that owns the track. That agreement establishes requirements for casing, depth and flagging. Roanoke has 7.64 track miles of Union Pacific line inside its limits, so the specific track location and proposed route need to be identified.

Can you bore a line beneath Cade Branch in Roanoke?

A bore beneath Cade Branch can be planned, with the route set to pass under the channel. The crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. Cade Branch has 3.83 channel miles inside Roanoke, and flood prone soils cover 22 percent of the mapped area.

Who operates Roanoke’s public water system, and what source supplies it for underground work planning?

The City of Roanoke runs the public water system, which uses purchased surface water. Public records report 3,122 service connections and 10,127 people served. For a water line bore near Litsey Road, the exact property and existing service route help define where a new or replacement connection can go.

Which electric company should I check for a Roanoke project in Denton County?

Denton County electric service is reported by several utilities, including Oncor Electric Delivery Company, Texas-New Mexico Power and City of Denton. That list does not identify the provider for every Roanoke address. Confirm the owner of the line and its conduit specifications before planning a bore near US 377 or a local street.

How far is Roanoke from Yukon, and does Keller affect a bore job?

Roanoke is 196 road miles and a 3.8 hour drive from our Yukon, Oklahoma yard. Keller is 5.7 miles south and is the nearest larger city. The distance from Yukon can affect mobilization for work in Roanoke, including a route under Marshall Creek Road.

How much notice does Texas811 need for a Roanoke bore along Litsey Road?

For a bore along Litsey Road, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. For Roanoke work, if our start moves more than 14 days past the original notice, we submit a new request. Before resuming boring in Roanoke, we have worn or moved marks refreshed through Texas811.

What site conditions and crossing requirements shape our directional bore cost under US 377 in Roanoke?

The job scope sets the price: length, pipe or conduit size, ground conditions, utilities to expose, pavement, crossings, pits and equipment time all matter. Roanoke’s clay, US 377 pavement and nearby Union Pacific track can add planning or crossing work. Mobilization from Yukon is also part of the scope.

Where the Roanoke facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Roanoke

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Roanoke, Texas

Type the address of your job in Roanoke. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Roanoke

Same county: Denton · Lewisville · Frisco · Carrollton · Flower Mound · Little Elm · The Colony · Dallas · Corinth · Fort Worth · Highland Village · Providence Village. All counties: Texas county list.