Rock Island Texas Directional Boring: Snakecreek Soil, Pin Oak Creek and US 90 Alternate
Quick Answer: Rock Island is an unincorporated community in Colorado County, so streets and permits fall to county or state authorities, not a city government. We take directional boring, also called horizontal directional drilling (HDD), work beneath Pin Oak Creek and other local crossings. County Road 118 Road is part of a community 463 road miles from our Yukon, Oklahoma main office. Snakecreek soil is common here, and its finer material can cling to a reamer or the pipe.
Rock Island bores at a glance
- Unincorporated community in Colorado County, Texas. Population 228 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 463 miles, about 9.3 hours of driving.
- Ground: Snakecreek soil is mapped on 33 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 90 Alternate. State permit office: TxDOT Yoakum District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Pin Oak Creek and Sandy Creek.
- Public water: Rock Island Water Supply Corporation, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Pin Oak Creek in Rock Island?
Rock Island is an unincorporated community in Colorado County, with 228 people in the 2020 Census count. We install water, sewer, gas, electric conduit and fiber lines, including service runs along County Road 118 Road or connections near Pin Oak Creek. The county or state, rather than a city government, has authority over streets and permits here.
Our main office is in Yukon, Oklahoma, and Rock Island work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have had no utility strike in over 25 years, working around buried services such as Rock Island Water Supply Corporation lines and electric facilities reported in Colorado County. Our family business began in 1965, and since 1982 we have done directional boring for crossings along US 90 Alternate in Rock Island.

How does Snakecreek soil affect a bore in Rock Island?
The USDA soil survey maps Snakecreek fine sandy loam, occasionally flooded and with 0 to 1 percent slopes, across 33 percent of Rock Island. Garwood soils account for 31 percent and Nada for 22 percent. At about 40 inches below the surface, the mapped texture is sandy clay loam across 74 percent of the area, clay across 22 percent and clay loam across 4 percent. These are mapped patterns, not site test results. The sandy surface can cut readily, while the finer material below may hold the hole and cling to tooling.
| USDA soil survey, inside the Rock Island mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Snakecreek 33 percent, Garwood 31 percent, Nada 22 percent, Telf 6 percent and Katy 4 percent |
| Texture at the surface | fine sandy loam 96 percent and loamy sand 4 percent |
| Texture about 40 inches down | sandy clay loam 74 percent, clay 22 percent and clay loam 4 percent |
| Engineering class about 40 inches down | lean clay (CL) 70 percent, clayey sand (SC) 26 percent and fat clay (CH) 4 percent |
| Average clay content about 40 inches down | 29 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 37 percent of the area |
| Flood prone soils | 33 percent of the area |
| High corrosion risk for uncoated steel | 37 percent of the area |
Bedrock is not mapped in the top five feet of Rock Island, though the geologic map identifies Alluvial silt and clay of Chibanian age below. A seasonal water table is mapped within 40 inches across 37 percent of the area, so pits near Pin Oak Creek may need pumping. Flood prone soils cover 33 percent, calling for a bore depth planned below the channel. High steel corrosion risk is mapped across 37 percent; the line owner selects any protection for steel casing or tracer wire, while HDPE avoids that steel corrosion concern.
How is a bore run through Rock Island sandy clay loam?
The USDA soil survey maps sandy clay loam at about 40 inches across much of Rock Island. We plan the fluid, reaming and pipe pull around that finer layer and the wet ground mapped near Pin Oak Creek.
- In Snakecreek areas, we select drilling fluid and reaming stages for the finer material, then have the pipe ready so it can be pulled after the final pass.
- Where the survey maps a seasonal water table near Pin Oak Creek, we keep pits small and pump water out so the bore setup stays usable.
- Before the drill approaches a marked line along County Road 106 Road, we hydrovac pothole that utility and verify its depth rather than relying on paint.
- At a US 90 Alternate crossing, we track the drill head from the surface, log depth and pitch, and keep the pavement intact.

Where does a line have to go under County Road 118 Road in Rock Island?
US 90 Alternate runs 4.5 roadway miles inside the mapped Rock Island community boundary, and no other highway is listed within 1.5 miles outside it. County Road 118 Road is the longest named street, at 3.63 miles within the community; County Road 106 Road runs 3.31 miles, and Old 90A-Easterling runs 2.54 miles. A bore beneath one of these roads can avoid cutting the traveled surface, but the route and access pits still need to fit the road and the utility path.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 90 Alternate | US highway | 4.5 roadway miles inside | State highway office |
| Pin Oak Creek | Stream | 3.26 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Sandy Creek | Stream | 0.29 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Crasco Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| Little Crasco Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| East Sandy Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside the Rock Island boundary or within 1 mile outside it, and no street and rail crossing is mapped. Pin Oak Creek runs 3.26 channel miles inside the community, while Sandy Creek runs 0.29 miles. Seven mapped street crossings intersect named streams. A Pin Oak Creek crossing needs a planned path beneath the channel, and its jurisdiction is checked during planning; no lakes or ponds are mapped within 1 mile.
Who signs off on a Rock Island bore in Colorado County?
Rock Island has no city government, so streets and permits fall to the county or state rather than a municipal office. For a bore on US 90 Alternate right of way, the line owner, not the driller, submits the utility permit through TxDOT’s online RULIS system. The TxDOT Yoakum District reviews it. For a crossing on County Road 118 Road, we provide the bore plan and profile and work under the utility owner’s permit. TxDOT requires utility lines beneath existing highways to be bored or tunneled, with casing; a permit can set different cover depths.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns lines near Rock Island Water Supply Corporation in Rock Island?
Rock Island Water Supply Corporation supplies groundwater to 230 people through 129 service connections. That gives a proposed water service near County Road 118 Road an existing local system to check against before its route is set. Electric providers reporting service in Colorado County are AEP Texas Central, CenterPoint Energy, Bluebonnet Electric Cooperative, Fayette Electric Cooperative, San Bernard Electric Cooperative and Wharton County Electric Cooperative. We confirm the line owner for a conduit bore rather than assuming one provider serves every address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Rock Island Water Supply Corporation | Public water system | Groundwater wells | 129 connections, 230 people served |
| AEP Texas Central, CenterPoint Energy, Bluebonnet Electric Cooperative, Fayette Electric Cooperative, San Bernard Electric Cooperative and Wharton County Electric Cooperative | Electric utilities reporting service in Colorado County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Rock Island’s median housing year at 1960; 50 percent of homes were built before 1960, 35 percent from 1960 to 1999 and 15 percent in 2000 or later. A job near older housing may involve replacing a service, while newer construction can call for an added connection. Before drilling near a marked utility along Elsie Street, we expose it with hydrovac potholing; paint shows position, not depth.

What is near Rock Island, including El Campo?
Rock Island is an unincorporated community in Colorado County, at an elevation of 228 feet and with 5.02 square miles of mapped area. Its ZIP code is 77470. Sheridan is 6.4 miles west, Garwood is 10.5 miles southeast, Glidden is 12.7 miles north, Columbus is 13.1 miles north, and Nada is 13.2 miles southeast. Columbus is the county seat; El Campo, the nearest larger city, is 28.0 miles southeast. Our Yukon yard is 463 road miles away, a 9.3 hour drive, so that distance can affect mobilization for a Rock Island job.
Places near Rock Island
- Directional boring in Sheridan: 6.4 miles west
- Directional boring in Garwood: 10.5 miles southeast
- Directional boring in Glidden: 12.7 miles north
- Directional boring in Columbus: 13.1 miles north
- Directional boring in Nada: 13.2 miles southeast
- Directional boring in El Campo: 28 miles southeast
What boring work comes up near County Road 106 Road in Rock Island?
- Highway crossing: A bore beneath US 90 Alternate follows the TxDOT permit plan and keeps the existing highway surface uncut.
- Road crossing: A service under County Road 106 Road uses entry and exit pits outside the route of the buried line.
- Water service: A connection near Rock Island Water Supply Corporation needs its path checked against marked groundwater well system lines.
- Creek crossing: A Pin Oak Creek bore is planned below the channel, with the crossing checked for federal jurisdiction during planning.
- Fiber conduit: A route along County Road 118 Road can be bored beneath pavement while marked utilities are exposed first.
- Sewer line: A line near Sandy Creek needs a route and pit locations suited to the mapped wet and flood prone ground.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Rock Island quote near US 90 Alternate?
For a bore near US 90 Alternate, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. A route that crosses County Road 118 Road or Pin Oak Creek gives us useful detail on access and the crossing plan.
Mobilization starts with the 463 road miles from our Yukon yard to Rock Island. The sandy clay loam mapped beneath the surface can affect drilling and reaming, while a US 90 Alternate crossing or a route beneath Pin Oak Creek changes the crossing work. Pipe size and length, marked utilities to expose, pavement or concrete, pits, excavator time and sand backfill also shape the job. High profile or emergency work can add requirements.
Questions people ask about boring in Rock Island
Does Trinity take directional boring jobs in Rock Island, Colorado County, and how are crews assigned?
Yes. We take directional boring work in Rock Island, with our own crews and partner contractor crews from satellite yards. From the first call through the bore log, we coordinate with you on crossings near County Road 141 Road, regardless of which crew is on site. For a route near County Road 118 Road, we plan around the local access and marked utilities.
Could groundwater or flooding near Pin Oak Creek affect a Rock Island bore pit?
It can. The USDA soil survey maps a seasonal water table within 40 inches across 37 percent of Rock Island, and flood prone soils across 33 percent. Near Pin Oak Creek, we plan pit placement and depth with wet ground in mind and pump a pit if water collects.
Does Snakecreek soil in Rock Island corrode steel, and what pipe can I use?
High steel corrosion risk is mapped across 37 percent of Rock Island, so the line owner should consider protection for steel casing or tracer wire. HDPE does not have that steel corrosion concern. The USDA soil survey maps Snakecreek soil across 33 percent of the area, but a site specific material choice belongs to the line owner.
What ground does a bore pass through in Rock Island’s Snakecreek areas?
The USDA soil survey maps Snakecreek fine sandy loam across 33 percent of Rock Island. At about 40 inches below the surface, sandy clay loam is mapped across 74 percent of the area and clay across 22 percent. Those mapped textures suggest finer ground that can hold an open hole and cling to the reamer.
Could a bore in Rock Island encounter rock near Pin Oak Creek?
Although bedrock is not mapped in Rock Island’s top five feet, crossings near Sandy Creek may still encounter deeper rock. The geologic map shows Alluvial silt and clay of Chibanian age. A bore near County Road 106 Road still needs its route planned for actual site conditions rather than assuming the mapped material continues at every depth.
Who approves a bore under US 90 Alternate in Rock Island, and which state office reviews it?
The line owner files the TxDOT utility permit through RULIS, and the TxDOT Yoakum District reviews it. For a County Road 106 Road crossing, we prepare the bore plan and profile for the utility owner’s application. For a US 90 Alternate crossing, TxDOT requires boring or tunneling beneath the existing highway and casing; the issued permit can specify cover.
How far is Rock Island from the Yukon office, and does El Campo change the job plan?
Rock Island is 463 road miles and a 9.3 hour drive from our Yukon, Oklahoma main office, so we plan travel before scheduling work. El Campo is 28.0 miles southeast and is the nearest larger city. The Yukon distance affects mobilization, while the specific route, such as a crossing at US 90 Alternate, affects the work plan.
How much notice does Texas811 need for a Rock Island bore along County Road 118 Road?
Request a Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If a start along County Road 118 Road slips more than 14 days past the original notice, make a new request. Before work resumes on a US 90 Alternate crossing, we have worn or moved marks refreshed through Texas811.
What affects the cost of a directional bore in Rock Island near US 90 Alternate?
The job scope sets the price, with no single local rate. Factors include length, pipe size, soil, marked utilities, pavement, creek crossings, pits and excavator time. The 463 road miles from Yukon affect mobilization; Snakecreek soil and a crossing beneath US 90 Alternate can also change the equipment, planning and work involved.
Where the Rock Island facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Rock Island
- U.S. Census Bureau, TIGER/Line 2024: Rock Island boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Rock Island population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Rock Island housing units and year built
- Macrostrat geologic map compilation: map units under Rock Island
- U.S. EPA Safe Drinking Water Information System: public water systems serving Rock Island
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Colorado County
- U.S. Geological Survey, Elevation Point Query Service: Rock Island elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Rock Island
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Rock Island
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Rock Island, Texas
Type the address of your job in Rock Island. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.