Directional Boring Contractors in Wichita County, TX

Trinity Boring Solutions is a directional boring contractor serving Wichita County, Texas, installing water, sewer, gas, electric and fiber lines without an open trench in Wichita Falls, Burkburnett, Iowa Park, Electra, Pleasant Valley and Cashion Community. From the Trinity main office in Yukon, Oklahoma it is about 145 road miles southwest to Wichita Falls, the county seat. Bores here most often pass under Interstate 44 and US 287, the Wichita River and BNSF Railway track. Call (405) 409-7423 any time.

Free Bore Planner

Plan Your Bore in Wichita County, Texas

Type the address of your job in Wichita County. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

What Should You Know Before Boring in Wichita County?

Wichita County covers 628 square miles, has about 129,984 residents and sits in the TxDOT Wichita Falls District.

County seatWichita Falls
Population129,984 (2024 Census estimate), up 0.5% since 2020
Land area628 square miles
Largest cities and townsWichita Falls (102,371), Burkburnett (11,101), Iowa Park (6,583), Electra (2,249) and Pleasant Valley (359)
TxDOT districtTxDOT Wichita Falls District
811 centerTexas811 (call 811), two working days of notice
Electric utilitiesAEP Texas North and Oncor Electric Delivery Company
Interstate and US highwaysInterstate 44, US 287, US 277, US 281 and US 82
State Highways25, 79, 240 and 258
State loops and spursLoop 11, Loop 473, Spur 325, Loop 267 and Spur 447
RiversWichita River and Big Wichita River
Creeks and other streamsGilbert Creek, North Side Canal, Wildhorse Creek, South Fork Buffalo Creek, China Creek, Beaver Creek, Cole Creek and Long Creek
LakesLake Wichita and Lake Iowa Park
RailroadsBNSF Railway and short line railroads, about 50 main line miles
Average precipitation29.7 inches a year (1991 to 2020)
New housing units permitted131 in 2025
Road distance from Trinity main officeAbout 145 miles from Yukon, Oklahoma to Wichita Falls
Trinity insuranceGeneral liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability

Sources: Census Bureau (2024 population, 2025 building permits, TIGER/Line roads and water), EIA Form 861 (2025), NOAA 1991 to 2020 precipitation, federal rail network map, TxDOT districts, OpenStreetMap routing. Checked November 2026.

What Does a Bore Have to Cross in Wichita County?

A bore in Wichita County most often has to cross a highway such as Interstate 44, US 287 or US 277, a stream such as the Wichita River, the Big Wichita River or Gilbert Creek and BNSF Railway track. State Highways 25, 79, 240 and 258 also run through the county, along with Loop 11, Loop 473, Spur 325, Loop 267 and Spur 447. The Census map names 25 larger streams in Wichita County, led by the Wichita River, Gilbert Creek, North Side Canal, the Big Wichita River, Wildhorse Creek and South Fork Buffalo Creek. The rest are China Creek, Beaver Creek, Cole Creek, Long Creek, Turkey Creek, East Fork Pond Creek, Middle Fork Pond Creek, Adams Creek, West Fork Pond Creek, Short Creek, Call Field Canal, Buffalo Creek, Holliday Creek, Antelope Creek, Rough Creek, Stevens Creek, Bear Creek, Bluff Creek and North Fork Buffalo Creek. Lake Wichita and Lake Iowa Park are the main mapped lakes. The federal rail map shows about 50 miles of main line track in Wichita County: BNSF Railway about 33 miles and short line and other operators about 17.

Trinity Boring Solutions horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
A Trinity Boring Solutions drill rig, support trucks and vacuum excavation truck on a jobsite.

What Is the Ground Like for Directional Boring in Wichita County?

Clay is the main thing to plan for in Wichita County: the federal soil survey records a clay rich layer in the top five feet on about 64 percent of the county and bedrock within five feet on about 18 percent. Clay in Wichita County swells and sticks when wet, so the drilling fluid is mixed to keep cuttings moving. May is the wettest month in Wichita County at 4.1 inches on average and January the driest at 1.3. Wichita County averages 29.7 inches of precipitation a year, so rain delays are occasional.

  • Most common soils: Kamay (16%), Tillman (11%) and Deandale (8%).
  • Surface texture: most often silt loam (31%) or loam (20%).
  • Bedrock within 5 feet: about 18% of the county. Most of it is soft, weathered rock.
  • Clay rich layer (35% clay or more) in the top 5 feet: about 64% of the county.

Source: USDA Natural Resources Conservation Service, Soil Survey Geographic Database, Wichita County, Texas (survey area TX485, version 23, September 8, 2026), through Web Soil Survey. Percentages are shares of mapped county area.

Who Permits a Bore in Wichita County?

The TxDOT Wichita Falls District permits bores under state highways in Wichita County, the Wichita County Commissioners Court handles county roads, and Wichita Falls, Burkburnett and Iowa Park each handle their own streets.

  • State highways. Interstate 44, US 287, US 277, US 281, the other numbered state routes and the farm to market roads in Wichita County are on the state system. The utility owner files a TxDOT utility permit in RULIS.
  • Texas811 locates. Texas811 needs at least two working days of notice before digging (Texas811 FAQ; Texas Utilities Code, Section 251.151).
  • Railroads. A bore under BNSF Railway or short line track in Wichita County needs a crossing agreement from the railroad that owns it, which sets the casing, depth and flagging.
  • Water crossings. A bore under the Wichita River, the Big Wichita River, Gilbert Creek or Lake Wichita is checked for U.S. Army Corps of Engineers jurisdiction while the path is planned.

Statewide rules are on the Directional Boring Texas page, and Trinity supplies the bore plan and profile for the permit package.

Which Electric Utilities Serve Wichita County?

AEP Texas North and Oncor Electric Delivery Company serve Wichita County, according to 2025 filings with the U.S. Energy Information Administration. All are investor owned utilities. The owner of the line sets the conduit size, depth and inspection steps, so it is confirmed before a conduit bore in Wichita County is planned. More on electric line boring.

How Much New Construction Is There in Wichita County?

Wichita County permitted 131 new housing units in 2025, 117 of them single family homes, according to the Census Bureau Building Permits Survey. The population of Wichita County has held near 129,984 since 2020. Bore work in Wichita County is a mix of new services and replacement of older lines.

Which Cities and Towns in Wichita County Does Trinity Serve?

Trinity takes directional boring work in all 6 incorporated places in Wichita County and at sites outside city limits, and Wichita Falls is the largest with about 102,371 residents.

City or town2024 population
Wichita Falls102,371
Burkburnett11,101
Iowa Park6,583
Electra2,249
Pleasant Valley359
Cashion Community295

Source: U.S. Census Bureau 2024 estimates, counting only the part of each city inside Wichita County.

Wichita County borders Archer County, Baylor County, Clay County, Wilbarger County, Cotton County, Oklahoma and Tillman County, Oklahoma; every county is on the Directional Boring in All 254 Texas Counties page. The neighboring county seats are Archer City (Archer), Seymour (Baylor), Henrietta (Clay) and Vernon (Wilbarger).

Which Directional Boring Services Are Available in Wichita County?

Every Trinity service is available in Wichita County: horizontal directional drilling from 3/4 inch service lines to 48 inch casing, auger boring, hydrovac potholing, trenching and 24 hour emergency response, all listed under Underground Utility and Boring Services.

The free Bore Planner sizes a Wichita County job before you call.

Wichita County Directional Boring FAQs: What Do Customers Ask?

Does Trinity Boring Solutions work in Wichita Falls, Texas?

Yes. Trinity Boring Solutions takes work in Wichita Falls, Burkburnett, Iowa Park, Electra, Pleasant Valley and Cashion Community and the rural parts of Wichita County. Trinity works in Texas with its own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted.

Who approves a bore under Interstate 44 in Wichita County?

The TxDOT Wichita Falls District. The utility owner files the permit in the TxDOT RULIS system. County roads go through the Wichita County Commissioners Court and city streets through the city.

Is there rock in Wichita County?

Yes, in places. The federal soil survey records bedrock within five feet of the surface on about 18 percent of Wichita County, most of it soft, weathered rock. Potholing confirms it on the actual bore path.

Can a line be bored under the Wichita River in Wichita County?

Yes. A drill is steered below the bed of the Wichita River from a pit on each bank and the pipe is pulled back through, so the channel is not opened. Federal jurisdiction over the crossing is checked first.

Which railroads have track in Wichita County?

BNSF Railway and short line operators, with about 50 miles of main line track on the federal rail map. Each requires its own crossing agreement before a bore goes under the rails.

Is Trinity insured for work in Wichita County?

Yes. Trinity Boring Solutions carries general liability of $1,000,000 per occurrence and $4,000,000 aggregate, plus $5,000,000 excess liability. Ask for a certificate with the quote.

How much does directional boring cost in Wichita County?

Length and pipe size give us a general range. Depth, the crossings and the ground set the number, and heavy clay is a factor on many Wichita County jobs.

How Do You Get a Bore Quote in Wichita County?

Call (405) 409-7423 any time or send the address in Wichita County, the utility, the length and what it crosses. Trinity has bored since 1965 and is family owned.