Brazos Country Texas Directional Boring: Mohat Soil, US 90 and Brazos River
Quick Answer: Mohat soil is common here. It can hold a hole, then grip the pipe. Near US 90, Trinity Boring Solutions provides directional boring, also called horizontal directional drilling (HDD), in Brazos Country. The Yukon main office is 456 road miles away, with Union Pacific track just outside the city limits. The mapped loam and seasonal water table can affect reaming and pit setup.
Brazos Country bores at a glance
- Incorporated city in Austin County, Texas. Population 526 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 456 miles, about 9.1 hours of driving.
- Ground: Mohat soil is mapped on 43 percent of the area, with loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- No state or US highway is mapped inside the boundary. Closest: US 90 and Interstate 10.
- Railroad track inside the boundary: none mapped.
- Public water: City of Brazos Country, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring in Brazos Country, Austin County?
Brazos Country is in Austin County and has 526 residents in the Census Bureau Vintage 2024 estimate. Along Chew Road or Pecan Grove Road, our crews can place water, sewer, gas, electric conduit or fiber by directional boring where a route needs to pass beneath pavement or a driveway. The line and route shape the bore plan.
Our main office is in Yukon, Oklahoma, and Brazos Country work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A short service near Chew Road can use a 3/4 inch line; larger work near US 90 may need casing up to 48 inch, with bore lengths from 10 feet to 5,000 feet. Our family business began in 1965 and has done directional boring since 1982.

What is Brazos Country ground like to bore through Mohat soil?
The USDA soil survey maps Mohat soil across 43 percent of Brazos Country. Mohat rarely flooded Norwood frequently flooded complex, on 1 to 8 percent slopes, covers 37 percent. Surface texture is mapped as loam across 53 percent and loamy fine sand across 37 percent. At about 40 inches, loam accounts for 43 percent of mapped texture, while clay accounts for 12 percent. The average clay content at that depth is 20 percent, and sandy ground accounts for 23 percent. These are mapped soil patterns, not test borings. Loam and clay can hold the hole, but sticky cuttings may build up on a reamer or grip the pipe.
| USDA soil survey, inside the Brazos Country city limits | What is mapped |
|---|---|
| Soil series mapped | Mohat 43 percent, Kenney 23 percent, Styx 7 percent, Edna 6 percent and Silawa 4 percent |
| Texture at the surface | loam 53 percent, loamy fine sand 37 percent and clay 4 percent |
| Texture about 40 inches down | loam 43 percent, loamy fine sand 23 percent and sandy clay loam 14 percent |
| Engineering class about 40 inches down | lean clay (CL) 57 percent, silty sand (SM) 23 percent and fat clay (CH) 19 percent |
| Average clay content about 40 inches down | 20 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 21 percent of the area |
| Flood prone soils | 2 percent of the area |
| High corrosion risk for uncoated steel | 22 percent of the area |
Bedrock is not mapped within the top five feet in Brazos Country, which does not rule out rock at greater depth. A seasonal water table is mapped within 60 inches across 21 percent of the area, so pits may need pumping. Flood prone soils cover 2 percent, including ground where a route near the Brazos River needs careful depth planning. High steel corrosion risk is mapped across 22 percent, a concern for uncoated steel casing or tracer wire. The geologic map unit is Alluvial sand, silt, clay, and gravel of Holocene age; variable grain size can change how the hole holds.
How do crews bore Brazos Country loam?
The mapped loam, fine sand and clay in Brazos Country call for a bore plan that fits the ground. Along Pecan Grove Road, we expose marked utilities before the drill approaches.
- With Mohat soil that can stick to a reamer, we use staged reaming and plan to pull the pipe soon after opening the hole.
- Where Brazos Country’s loamy fine sand is mapped, we keep the hole supported with drilling fluid and have the pipe ready before the final ream.
- A seasonal water table is mapped within 60 inches across 21 percent of the area, so pits near Pecan Grove Road may need pumping.
- Before a bore along Brazos Hill Lane, we hydrovac expose each marked utility; paint shows a line’s position, not its depth.

Where might a Brazos Country line pass beneath Union Pacific?
No highway runs inside Brazos Country limits, but US 90 and Interstate 10 are each 0.1 miles from the boundary. A route reaching either highway needs its right of way considered in the plan. Within the city, Chew Road runs 1.5 miles, Pecan Grove Road 1.26 miles and Brazos Hill Lane 1.07 miles. River Ridge Road adds another named route for service work. Directional boring can keep pavement and driveways uncut, while the entry and exit pits sit in dirt beside the crossing.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 90 | Highway nearby | 0.1 miles outside | State highway office |
| Interstate 10 | Highway nearby | 0.1 miles outside | State highway office |
| Union Pacific | Railroad nearby | 0.1 miles outside | The railroad |
| Brazos River | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
Union Pacific owns track 0.1 miles outside the Brazos Country limits; no railroad lies inside the city. Public mapping shows no street and rail crossings inside the limits, but a proposed route toward the track still needs railroad coordination. The Brazos River runs along or touches the boundary, while no named stream is mapped inside the city. Unnamed drainage totals 1.74 miles, so routes near drainage need site specific planning. No street crossings of named streams are mapped inside the limits.
Whose permission does a Brazos Country bore near US 90 need?
US 90 and Interstate 10 sit 0.1 miles outside Brazos Country, and the Texas Department of Transportation Yoakum District reviews state highway right of way work in Austin County. The utility owner, not our crew, submits the utility permit in TxDOT’s RULIS system; we prepare the bore plan and profile under that permit. On city streets such as Chew Road, the city controls the street. A crossing beneath Union Pacific track needs an agreement with the railroad, setting the casing, depth and flagging. Planning a route at the Brazos River includes checking for Army Corps jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities serve Brazos Country, including City of Brazos Country?
The City of Brazos Country public water system uses groundwater wells and serves 579 people through 193 service connections. That system can be relevant when a proposed water route follows Chew Road. County electric service is reported by CenterPoint Energy, Bluebonnet Electric Cooperative, Fayette Electric Cooperative and San Bernard Electric Cooperative. We confirm the line owner for the specific address before planning a conduit bore, since those providers are not identified as serving every property.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Brazos Country | Public water system | Groundwater wells | 193 connections, 579 people served |
| CenterPoint Energy, Bluebonnet Electric Cooperative, Fayette Electric Cooperative and San Bernard Electric Cooperative | Electric utilities reporting service in Austin County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put the median housing year in Brazos Country at 1999; 45 percent of homes were built in 2000 or later, and 55 percent from 1960 to 1999. A replacement route on Pecan Grove Road may need to avoid existing buried lines, while a new service has its own path to plan. We expose each marked utility by hydrovac before drilling near it. For example, a proposed line beneath Brazos Hill Lane needs marked lines pothole exposed before the drill approaches.

How far is Brazos Country from South Frydek?
Brazos Country is an incorporated community in Austin County, with 1.95 square miles of land at an elevation of 106 feet and ZIP code 77474. South Frydek is 2.6 miles southwest; San Felipe is 5.0 miles northwest. Brookshire, the nearest larger city, is 5.6 miles east. Pattison is 5.8 miles northeast and Simonton is 6.6 miles southeast. Bellville, the county seat, is 18.8 miles northwest. From the Yukon, Oklahoma main office, the route is 456 road miles and 9.1 drive hours.
Places near Brazos Country
- Directional boring in South Frydek: 2.6 miles southwest
- Directional boring in San Felipe: 5 miles northwest
- Directional boring in Brookshire: 5.6 miles east
- Directional boring in Pattison: 5.8 miles northeast
- Directional boring in Simonton: 6.6 miles southeast
Which jobs call for a bore near the Brazos River in Brazos Country?
- Highway crossing: A route approaching US 90 may need a bore beneath the right of way, with TxDOT Yoakum District review.
- Water service: A connection near Chew Road can use directional boring to pass beneath a driveway without cutting its surface.
- Fiber route: A fiber conduit along Pecan Grove Road can be planned around existing marked utilities and the mapped loam.
- Rail crossing: Work approaching Union Pacific track outside Brazos Country needs railroad coordination for casing, depth and flagging.
- Drainage crossing: A route near the 1.74 miles of unnamed drainage needs a path planned for local ground and water.
- River crossing: A proposed line by the Brazos River needs depth planning and a check for Army Corps jurisdiction.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for Brazos Country work near River Ridge Road?
For a route near River Ridge Road, send the address or map pin first. Tell us what is going underground, such as water or fiber, then the pipe or conduit size and footage. A sketch or plans can show how the route approaches Chew Road or a driveway. Those details help us assess the work before setting the bore plan.
Price follows the work at the site. Mohat soil and the mapped loamy fine sand affect drilling and reaming; crossings of US 90, Union Pacific track or drainage add coordination and exposure needs. Concrete or pavement, pit size, excavator time and sand backfill also matter. The 456 road miles from Yukon affect mobilization, as can a high profile or emergency schedule. We consider the full route, not just its length.
Questions people ask about boring in Brazos Country
Does Trinity Boring Solutions take directional boring work in Brazos Country, Austin County?
Yes. Trinity serves Texas, including Austin County, with its own crews and partner drilling contractors vetted by Trinity. Work is managed through the company from the first call through the bore log, whichever crew is on site. A route along Chew Road can be discussed with its location, line type and size.
Who runs the Brazos Country public water system, and where does it get water?
The City of Brazos Country owns the public water system, which draws from groundwater wells. It serves 579 people through 193 service connections. For a proposed water bore near Pecan Grove Road, the system information helps identify who to contact about the line and route.
Which electric providers report service in Austin County near Brazos Country, and who confirms conduit specs?
CenterPoint Energy, Bluebonnet Electric Cooperative, Fayette Electric Cooperative and San Bernard Electric Cooperative report electric service in Austin County. The line owner for the particular address should be identified before conduit specifications are set. For a route near Brazos Hill Lane, confirm the owner and conduit requirements for that location.
Does the city or county control Brazos Hill Lane in Brazos Country, and must a bore cut the street?
Brazos Hill Lane is a city street because Brazos Country is incorporated. Directional boring can pass beneath a street without cutting its surface, with pits placed in dirt on either side. The route and site conditions determine the bore plan; the city controls its streets.
How old are homes and buried lines near Pecan Grove Road in Brazos Country?
The American Community Survey 2019 to 2023 estimates give Brazos Country a median housing year of 1999. Homes built from 1960 to 1999 account for 55 percent, and newer service routes may differ from replacement work. Age alone does not establish pipe age, so a bore near Pecan Grove Road needs marked utilities exposed before drilling.
Can groundwater or flood prone ground affect bore pits by the Brazos River in Brazos Country?
It can. A seasonal water table is mapped within 60 inches across 21 percent of the city, so pits may need pumping. Flood prone soils cover 2 percent, and the Brazos River touches or runs along the boundary. We plan pit locations and crossing depth for the specific route.
What bore sizes and lengths can Trinity handle near River Ridge Road in Brazos Country?
Trinity handles lines from 3/4 inch service size through 48 inch casing, and bore lengths from 10 feet to 5,000 feet. A proposed route near River Ridge Road needs its own size and length assessment. Ground, access and crossings help determine the workable setup.
How much notice does Texas811 need for a bore along Chew Road in Brazos Country?
The Texas811 locate request must be made at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If the start moves more than 14 days past the original notice, submit a new request. Marks along Chew Road that wear off or move must be refreshed before work continues.
What affects the cost of directional boring near US 90 in Brazos Country?
The price depends on the route and scope, not a set local rate. Mohat soil, bore length, pipe size, exposed utilities, pavement, pits and drainage crossings can all affect the work. A route near US 90 may also need TxDOT permit coordination, while the 456 road miles from Yukon affect mobilization.
Where the Brazos Country facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Brazos Country
- U.S. Census Bureau, TIGER/Line 2024: Brazos Country boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Brazos Country
- U.S. Census Bureau, American Community Survey 2019 to 2023: Brazos Country housing units and year built
- Macrostrat geologic map compilation: map units under Brazos Country
- U.S. EPA Safe Drinking Water Information System: public water systems serving Brazos Country
- U.S. Department of Transportation, North American Rail Network: track owners in Austin County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Austin County
- U.S. Geological Survey, Elevation Point Query Service: Brazos Country elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Brazos Country
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Brazos Country
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Brazos Country, Texas
Type the address of your job in Brazos Country. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
