trinityboringsolutions.com

Smithville Texas Directional Boring: Fine Sandy Loam, Union Pacific, Gazley Creek

Quick Answer: The City of Smithville owns the public water system and its municipal electric system, so identify those lines before setting a bore path near Loop 230. We take directional boring, also called horizontal directional drilling (HDD), work in Smithville for routes that must pass beneath Union Pacific tracks. Smithville is 440 road miles from our Yukon, Oklahoma main office, and Texas crews can plan around Texas State Highway 71. Smithville fine sandy loam is common, but sandy clay loam below it can cling to a reamer and slow the pull.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Smithville bores at a glance

  • Incorporated city in Bastrop County, Texas. Population 4,335 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 440 miles, about 8.4 hours of driving.
  • Ground: Smithville soil is mapped on 28 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 1 percent of the area.
  • Highways inside the boundary: Texas State Highway 71, Texas State Highway 95, FM 2571 and FM 153. State permit office: TxDOT Austin District.
  • Railroad track inside the boundary: Union Pacific, with 9 mapped street and rail crossings.
  • Named streams inside the boundary: Gazley Creek, Willow Creek and Hunt Branch.
  • Public water: City of Smithville, groundwater wells.
  • Electric: City of Smithville municipal electric system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near Union Pacific in Smithville?

We take directional boring work in Smithville, an incorporated city in Bastrop County with a population of 4,335, according to the Census Bureau Vintage 2024 estimate. Where a route along 4th Street calls for water, sewer, gas, electric conduit or fiber, we match the bore to the line and its size. That helps keep pavement and driveways intact while the utility gets across the street.

Our main office is in Yukon, Oklahoma, and Smithville work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore was roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa. Compared with that reach, a Smithville service run near 5th Street is a smaller job, but its soil and crossings still shape the plan.

Directional drill rig and crew working on a street beside a brick commercial building
Our drill and crew set up on a street beside a brick commercial building. Photos on this page are from our jobs in Oklahoma and Texas.

What does Smithville soil mean for a bore in Smithville?

The USDA soil survey maps Smithville fine sandy loam across 28 percent of the city and Bosque loam across 18 percent. At about 40 inches below the surface, sandy clay loam is mapped under 44 percent of the area. The survey also reports an average clay content of 28 percent at that depth. These are mapped patterns, not test borings. Around a route near Gazley Creek, the actual ground can still vary, so the bore plan has to allow for soil that may bind around the reamer.

USDA soil survey, inside the Smithville city limitsWhat is mapped
Soil series mappedSmithville 28 percent, Bosque 18 percent, Bastrop 12 percent, Krum 8 percent and Axtell 7 percent
Texture at the surfacefine sandy loam 53 percent, loam 18 percent and fine sand 9 percent
Texture about 40 inches downsandy clay loam 44 percent, clay loam 22 percent and clay 10 percent
Engineering class about 40 inches downlean clay (CL) 68 percent, fat clay (CH) 18 percent and silty sand (SM) 6 percent
Average clay content about 40 inches down28 percent
Bedrock mapped within 60 inches1 percent of the area (0 percent hard rock, 1 percent weathered rock)
Seasonal water table within 60 inches5 percent of the area
Flood prone soils25 percent of the area
High corrosion risk for uncoated steel22 percent of the area

The USDA soil survey maps bedrock within 60 inches in 1 percent of Smithville, while seasonal water within that depth is mapped in 5 percent. Flood prone soils cover 25 percent, so a Gazley Creek crossing needs a depth plan beneath the channel. High steel corrosion risk is mapped in 22 percent of the area, a concern for uncoated casing or tracer wire. The map also identifies terrace deposits from the Cenozoic and Middle Eocene sedimentary units. Those varied sand, clay and gravel deposits call for checking returns and ground conditions as the bore advances.

How do we drill through Smithville’s sandy clay loam?

Smithville has fine sandy loam at the surface and sandy clay loam commonly mapped below it. We plan the fluid, reaming sequence and pull around that change, then track the bore near streets such as 4th Street.

  1. Because sandy clay loam is mapped under 44 percent of Smithville, we control fluid and ream in stages to limit sticky soil building on the tool.
  2. The Smithville survey maps an average clay content of 28 percent at about 40 inches, so we plan the pull to follow the final ream without delay.
  3. Where the surface fine sandy loam gives way to clay loam or clay near 4th Street, we track the head and log its depth and pitch as it advances.
  4. With seasonal water mapped in 5 percent of Smithville, we keep pits near Gazley Creek manageable and pump them if water collects.
Walkover locator held over a flowing creek while tracking the drill head on a 385 foot rock bore in Guthrie, Oklahoma
Tracking the drill head with a walkover locator over a flowing creek on a 385 foot bore in Guthrie, Oklahoma.

What does a bore have to cross near Loop 230 in Smithville?

Texas State Highway 71 has 8.1 mapped roadway miles inside Smithville, and Texas State Highway 95 has 3.6. Loop 230 runs 4.95 miles within the city. Other long street routes include 2nd Street at 2.6 miles, 4th Street at 2.18 miles and 5th Street at 1.91 miles. A bore route across one of these streets can avoid an open cut, but the road surface and the utility path still need to be considered in the entry and exit locations.

CrossingTypeMapped extentWho has a say
Texas State Highway 71State highway8.1 roadway miles insideState highway office
Texas State Highway 95State highway3.6 roadway miles insideState highway office
FM 2571State highway1.2 roadway miles insideState highway office
FM 153State highway0.5 roadway miles insideState highway office
Union PacificRailroad6.48 track miles insideThe railroad
Gazley CreekStream1.3 channel miles insideChecked for Corps of Engineers jurisdiction
Willow CreekStream0.47 channel miles insideChecked for Corps of Engineers jurisdiction
Hunt BranchStream0.16 channel miles insideChecked for Corps of Engineers jurisdiction
J D CreekStream nearby0.8 miles outsideChecked for Corps of Engineers jurisdiction
Lake CreekStream nearby1 miles outsideChecked for Corps of Engineers jurisdiction
Shipp LakeLake or pond152 acres, nearbyChecked for Corps of Engineers jurisdiction
Buescher LakeLake or pond12 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 6.48 track miles inside Smithville, and public mapping shows 9 street and rail crossings in the city. Gazley Creek runs 1.3 channel miles here; Willow Creek and Hunt Branch are also mapped. Four street crossings of named streams are mapped in Smithville. A bore under a creek needs a route planned below the channel, and Shipp Lake and Buescher Lake are nearby but outside the city limits.

Who approves work near Texas State Highway 71 in Smithville?

Texas State Highway 71 is a state road, so work in its right of way needs a utility permit reviewed by the TxDOT Austin District. The utility that owns the line files through TxDOT’s online RULIS system; we prepare the bore plan and profile and work under the issued permit. Smithville streets such as Loop 230 belong to the incorporated city. A Union Pacific track crossing needs an agreement with the railroad, which sets casing, depth and flagging. For Gazley Creek, the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Smithville near City of Smithville lines?

The City of Smithville public water system uses groundwater wells and reports 2,179 service connections serving 4,901 people. The city also owns its municipal electric system, which reports 2,289 customers to EIA. Before potholing a route near 4th Street, we need to expose marked lines and confirm their depth, since surface marks show position but not how deep a pipe or conduit sits.

Line ownerWhat it isSourceSize
City of SmithvillePublic water systemGroundwater wells2,179 connections, 4,901 people served
City of Smithville municipal electric systemCity owned electric systemReports to the U.S. Energy Information Administration2,289 customers reported
Oncor Electric Delivery Company, Bluebonnet Electric Cooperative and Fayette Electric CooperativeElectric utilities reporting service in Bastrop CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Smithville’s median housing year at 1972. The estimates show 40 percent of homes were built before 1960 and 18 percent in 2000 or later. That mix can mean replacement work near older streets as well as new service routes. For a bore along 5th Street, we pothole marked utilities before drilling close to them.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

Do you cover Smithville and nearby Rosanky?

Smithville is in Bastrop County, covers 4.14 square miles and sits at an elevation of 326 feet. ZIP code 78957 serves the city. Rosanky is 10.3 miles west, while Bastrop, the county seat and nearest larger city, is 12.2 miles northwest. Plum is 11.5 miles southeast. Our Yukon, Oklahoma yard is 440 road miles away, about an 8.4 hour drive. That distance is part of planning crew and equipment mobilization for a job near Texas State Highway 71.

Places near Smithville

What would we bore near 4th Street in Smithville?

  • Highway crossing: A bore beneath Texas State Highway 71 needs a route and work plan that fit the state highway right of way.
  • Water service: A connection near 4th Street can run from the City of Smithville system without opening the street surface.
  • Fiber route: A fiber conduit near Loop 230 can pass below pavement, with marked utilities exposed before the drill approaches.
  • Creek crossing: A route beneath Gazley Creek needs depth planned below the channel and a jurisdiction check during planning.
  • Rail crossing: A bore below Union Pacific track needs the railroad’s agreement to set casing, depth and flagging.
  • Electric conduit: Near 5th Street, the city owned electric system makes confirming the line and conduit requirements part of the bore plan.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a bore near 5th Street in Smithville?

A map pin near 5th Street matters because a few blocks can change which utilities, pavement or creek route a bore must avoid. Send the address or pin, what will go underground, pipe or conduit size and footage. A sketch or plan helps us see the route and crossings before we scope the work.

A short, clear route through Smithville fine sandy loam with few crossings is simpler to plan than a long bore under Union Pacific track or Texas State Highway 71. Price also reflects pipe size, soil and rock, exposed utilities, pavement, creek crossings, pits, excavator time and sand backfill. The 440 road miles from Yukon can affect mobilization, and an emergency or high profile job can add demands to the plan.

Questions people ask about boring in Smithville

Does Trinity Boring Solutions take directional boring jobs in Smithville and Bastrop County?

Yes. We take work in Smithville and staff it with our crews or from satellite yards operated by partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, even if a partner crew is at the site near 4th Street.

What does a Smithville bore under Union Pacific track need?

A crossing beneath Union Pacific track needs an agreement from the railroad that owns it. That agreement sets the casing, depth and flagging requirements for the crossing. Smithville has 6.48 track miles inside the city, so identify the track on the route before the bore plan is finalized.

Can a line be bored under Gazley Creek in Smithville?

Yes, a bore can be planned beneath Gazley Creek if the route and ground allow it. The channel runs 1.3 miles within Smithville, and the crossing needs a depth plan below the channel. During planning, the crossing is checked for U.S. Army Corps of Engineers jurisdiction.

Who runs Smithville’s public water system, and where does the water come from?

The City of Smithville owns the public water system, which draws from groundwater wells. It reports 2,179 service connections serving 4,901 people. That ownership and the existing routes matter when planning a new water service or potholing near 4th Street.

Which utility owns electric lines in Smithville and Bastrop County, and who confirms conduit specs?

The City of Smithville owns its municipal electric system. Confirm the conduit requirements with the owner of the line at the job address before planning a bore near Loop 230. Countywide utility reporting includes Oncor Electric Delivery Company, Bluebonnet Electric Cooperative and Fayette Electric Cooperative, but that does not establish who owns a particular line.

Who is responsible for Smithville streets like 4th Street, and does a bore need a cut?

Smithville is incorporated, so its city streets belong to the city itself. A directional bore can pass beneath 4th Street without cutting the pavement, with entry and exit pits placed off the travel surface where the route allows. The city street authority handles its street approval.

What bore sizes and lengths can Trinity handle for a Smithville job near 5th Street?

We handle lines from 3/4 inch service sizes up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. A route near 5th Street is sized to the pipe or conduit, the ground and the crossings, rather than choosing a length from the street name alone.

How much notice does Texas811 need for a Smithville bore near Loop 230?

Make the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. Texas811 describes that as at least two working days. If a Loop 230 start slips more than 14 days after the original notice, submit a new request; have worn or moved marks refreshed before work continues.

What affects the cost of directional boring near Texas State Highway 71 in Smithville?

The price depends on the job scope, including bore length, pipe size, soil, pavement, utility crossings, creek conditions and pit work. A route beneath Texas State Highway 71 or Union Pacific track adds crossing requirements to the plan. The 440 road miles from our Yukon yard can also affect mobilization.

Where the Smithville facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Smithville

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Smithville, Texas

Type the address of your job in Smithville. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Smithville

Same county: Elgin · Camp Swift · Wyldwood · McDade · Cedar Creek · Red Rock. All counties: Texas county list.