trinityboringsolutions.com

Leary Texas Directional Boring: Eylau Soil, Rain Creek And Texas Northeastern Railroad

Quick Answer: At Barkman Creek Road, what does the top five feet look like, and what lies below it? Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Leary, Texas, including routes near the Texas Northeastern Railroad. The Yukon, Oklahoma main office is 318 road miles away, and Interstate 30 crossings shape mobilization and access. The USDA soil survey maps heavy clay at about 40 inches across 52 percent of Leary; it can cling to a reamer, so we stage the cut and manage returns.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Leary bores at a glance

  • Incorporated city in Bowie County, Texas. Population 456 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 318 miles, about 6.2 hours of driving.
  • Ground: Eylau soil is mapped on 40 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 2 percent of the area.
  • Highways inside the boundary: Interstate 30, US 82, FM 2253, FM 1398 and Spur 74. State permit office: TxDOT Atlanta District.
  • Railroad track inside the boundary: Texas Northeastern Railroad, with 1 mapped street and rail crossings.
  • Named streams inside the boundary: Rain Creek, Jones Creek and Barkman Creek.
  • Public water: City of Leary, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring on Barkman Creek Road in Leary?

Leary is an incorporated city in Bowie County, where the Census Bureau Vintage 2024 estimate puts the population at 456. We can bore water, sewer, gas, electric conduit or fiber along routes such as Barkman Creek Road and New Boston Road, with the route checked against existing lines before drilling.

Our main office is in Yukon, Oklahoma, and Leary work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have done directional boring since 1982. Near the City of Leary water system and lines along O Leary Street, our record is no utility strike in over 25 years.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What ground does Eylau soil mean for a bore in Leary?

The USDA soil survey maps Eylau very fine sandy loam across 40 percent of Leary and Sawyer silt loam across 36 percent. At the surface, very fine sandy loam covers 43 percent of the mapped area and silt loam covers 39 percent. About 40 inches down, clay is mapped across 52 percent of the area, with sandy clay loam across 44 percent. That deeper clay can stick to a reamer and grip pipe, even where the surface soil looks loamy.

USDA soil survey, inside the Leary city limitsWhat is mapped
Soil series mappedEylau 40 percent, Sawyer 36 percent, Annona 14 percent and Sardis 3 percent
Texture at the surfacevery fine sandy loam 43 percent, silt loam 39 percent and loam 15 percent
Texture about 40 inches downclay 52 percent, sandy clay loam 44 percent and silty clay loam 3 percent
Engineering class about 40 inches downfat clay (CH) 52 percent, lean clay (CL) 45 percent and clayey sand (SC) 3 percent
Average clay content about 40 inches down36 percent
Bedrock mapped within 60 inches2 percent of the area (0 percent hard rock, 2 percent weathered rock)
Seasonal water table within 60 inches81 percent of the area
Flood prone soils4 percent of the area
High corrosion risk for uncoated steel96 percent of the area

Bedrock is not mapped in the top five feet across most of Leary; 2 percent of the area has bedrock mapped within 60 inches, and typical depth is 53 inches. A seasonal water table is mapped within 60 inches across 81 percent, so pits may need pumping. Flood prone soils cover 4 percent. High steel corrosion risk is mapped across 96 percent, so the line owner should decide casing and tracer wire coatings; HDPE is not affected by that soil concern. The Paleocene Midway Group, undivided, includes clay, sand, silt, limestone and marlstone, so the deeper profile can change from soil to rock.

How do we bore through clay in Leary?

On Leary’s Eylau and Sawyer soils, we select the bit and fluid for material at the planned depth, then track the drill head from the surface rather than assume the surface texture continues below.

  1. Eylau very fine sandy loam covers 40 percent of Leary, but clay is mapped across 52 percent at about 40 inches; we ream in stages and manage sticky cuttings.
  2. Heavy clay can grip pipe on a Leary route, so we use suitable fluid and pull the pipe the same day the hole is opened.
  3. With a seasonal water table mapped within 60 inches across 81 percent of Leary, we keep pits small and pump them if water collects.
  4. Before drilling near New Boston Road, we expose marked utilities with hydrovac; the walkover locator tracks the head and logs depth and pitch.
Walkover locator held over a flowing creek while tracking the drill head on a 385 foot rock bore in Guthrie, Oklahoma
Tracking the drill head with a walkover locator over a flowing creek on a 385 foot bore in Guthrie, Oklahoma.

What could a Leary bore cross near the Texas Northeastern Railroad?

Interstate 30 has 2.8 mapped roadway miles inside Leary, US 82 has 2.6, FM 2253 has 1.9, FM 1398 has 1.6 and Spur 74 has 0.3. The longest named streets include Barkman Creek Road at 2.73 miles, New Boston Road at 2.62 miles and Leary Road at 1.46 miles. O Leary Street adds another short route to check. A bore plan needs to account for pavement, access and existing utilities along whichever crossing or street route is proposed.

CrossingTypeMapped extentWho has a say
Interstate 30Interstate2.8 roadway miles insideState highway office
US 82US highway2.6 roadway miles insideState highway office
FM 2253State highway1.9 roadway miles insideState highway office
FM 1398State highway1.6 roadway miles insideState highway office
Spur 74State highway0.3 roadway miles insideState highway office
Texas Northeastern RailroadRailroad1.85 track miles insideThe railroad
U.S. Government trackRailroad nearby0.4 miles outsideThe railroad
Rain CreekStream0.13 channel miles insideChecked for Corps of Engineers jurisdiction
Jones CreekStream0.1 channel miles insideChecked for Corps of Engineers jurisdiction
Barkman CreekStream0.02 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

The Texas Northeastern Railroad has 1.85 track miles inside Leary, and public mapping shows one street and rail crossing. Rain Creek, Jones Creek and Barkman Creek have 0.13, 0.1 and 0.02 channel miles inside the city. Two mapped street crossings intersect named streams. The creek route affects bore depth and pit placement, while a rail crossing calls for coordination with the track owner. No lakes or ponds are mapped within one mile.

Who approves a Leary bore near Interstate 30?

Leary’s city streets, including Barkman Creek Road, belong to the city. Work in the right of way of Interstate 30, US 82, FM 2253, FM 1398 or Spur 74 needs a TxDOT utility permit reviewed by the TxDOT Atlanta District; the line owner files in RULIS, and we prepare the bore plan and profile. At Interstate 30 crossings, lines need 60 inches of cover below the lowest crossed grade; road crossings are encased and bored beneath all travel lanes. The Texas Northeastern Railroad needs its agreement, and Rain Creek is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What lines are already buried in Bowie County around Leary?

The City of Leary public water system uses purchased surface water and lists 274 service connections serving 451 people. Electric utilities reporting service in Bowie County are Southwestern Electric Power, Bowie-Cass Electric Cooperative and Southwest Arkansas Electric Cooperative. Those reports do not identify which provider serves each Leary address, so we confirm the line owner before planning a conduit bore.

Line ownerWhat it isSourceSize
City of LearyPublic water systemSurface water bought from another system274 connections, 451 people served
Southwestern Electric Power, Bowie-Cass Electric Cooperative and Southwest Arkansas Electric CooperativeElectric utilities reporting service in Bowie CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Leary’s median housing year at 1986; 10 percent of homes were built before 1960, 72 percent from 1960 to 1999 and 18 percent in 2000 or later. That mix can mean either replacement work or new service near New Boston Road. Paint shows a line’s position, not its depth, so we expose marked utilities with hydrovac potholing before the drill gets near them.

Trinity Boring Solutions crew running a 2 inch conduit directional bore with airport hangars and a parked jet in the background in Oklahoma City
Our crew running a 2 inch conduit bore near the hangars at an Oklahoma City airport.

What is near Leary, including Wake Village?

Leary covers 1.27 square miles in Bowie County at an elevation of 355 feet, with ZIP codes 75561 and 75503. Red Lick is 3.1 miles northeast, Hooks is 4.3 miles west and Nash is 4.6 miles east. Wake Village lies 5.7 miles southeast, and Texarkana is 7.4 miles east. New Boston, the county seat, is 12.0 miles west. From our Yukon, Oklahoma main office, Leary is 318 road miles away and about 6.2 drive hours, a distance that can affect crew mobilization.

Places near Leary

What bores may follow New Boston Road in Leary?

  • Highway crossing: A bore beneath Interstate 30 avoids cutting the roadway and is planned around required cover, casing and the travel lanes.
  • Water service: A connection near the City of Leary water system needs a route that accounts for existing service lines and mapped clay.
  • Fiber route: Fiber along New Boston Road can be installed below pavement and driveways, with marked utilities exposed before drilling.
  • Creek crossing: Rain Creek needs a bore profile that stays beneath the channel, with waterway jurisdiction checked during planning.
  • Rail crossing: A line beneath the Texas Northeastern Railroad needs an agreement covering casing, depth and flagging.
  • Street service: A bore along Barkman Creek Road can pass below pavement, with pits placed in dirt on either side.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How can I get a Leary bore quote for O Leary Street?

For a quote on O Leary Street or another Leary route, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help us see the crossing. The route matters because a short service and a bore beneath Interstate 30 call for different planning.

The 318 road miles from Yukon affect mobilization for a Leary job. Eylau’s clay at about 40 inches can change reaming and fluid needs, while pavement on Interstate 30 or a crossing of the Texas Northeastern Railroad adds planning and coordination. Price also reflects bore length, pipe size, utilities to expose, pits, excavator time, sand backfill, creek or drainage crossings, and whether the work is urgent.

Questions people ask about boring in Leary

Does Trinity take directional boring work in Leary, Bowie County, and who staffs it?

Yes. Trinity Boring Solutions takes directional boring work in Leary, Bowie County. Jobs are staffed by our own crews or vetted drilling partners working from satellite yards, and you work with Trinity from the first call through the bore log. That applies to a planned route near Barkman Creek Road as well.

Who approves a bore in the Interstate 30 right of way in Leary?

For an Interstate 30 right of way bore, the utility that owns the line applies through TxDOT’s RULIS system, and the TxDOT Atlanta District reviews it. We prepare the bore plan and profile and work under the utility’s permit. The permit sets the crossing details, including required cover.

What does a Leary bore under the Texas Northeastern Railroad need?

The Texas Northeastern Railroad owns 1.85 track miles mapped inside Leary. A bore below its track needs an agreement from the railroad. That agreement sets casing, depth and flagging. If the line also occupies highway right of way near Interstate 30, TxDOT asks for a copy.

Can a utility line be bored under Rain Creek in Leary?

A bore under Rain Creek can be planned with a profile that keeps the line beneath the channel. During planning, we check whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. Leary also has Jones Creek and Barkman Creek, so the exact map pin matters.

Who runs Leary’s public water system, and where does its water come from?

The City of Leary owns its public water system, which uses purchased surface water. Public records list 274 service connections serving 451 people. For proposed work near Leary Road, we need the route and must locate and expose marked lines before drilling.

Which electric line owner should I check in Bowie County before a Leary conduit bore?

Southwestern Electric Power, Bowie-Cass Electric Cooperative and Southwest Arkansas Electric Cooperative report service in Bowie County. Before a conduit bore near FM 2253, we identify the line owner and confirm conduit requirements with that owner. The county list does not establish which provider serves each Leary address.

How much notice does Texas811 need for a Leary bore on Barkman Creek Road?

Texas811 needs a locate request at least 48 hours before work on Barkman Creek Road, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start moves more than 14 days past the original notice, submit a new request. If marks wear off or move, have them refreshed through Texas811 before work resumes.

How far is Leary from Yukon, and does Wake Village change the job?

Leary is 318 road miles and 6.2 drive hours from our Yukon, Oklahoma main office. Wake Village is 5.7 miles southeast of Leary, but the Yukon distance is what can affect mobilization. The bore route, such as a crossing near New Boston Road, helps determine the equipment and crew plan.

What affects the cost of directional boring near Interstate 30 in Leary?

The job scope sets the price for a bore near Interstate 30. Length, pipe or conduit size, Leary’s mapped clay, pavement, utility crossings, creek or drainage crossings, pits, excavator time and backfill all matter. The 318 road miles from Yukon can affect mobilization, and urgent work can change the scope.

Where the Leary facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Leary

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Leary, Texas

Type the address of your job in Leary. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Leary

Same county: New Boston · De Kalb · Maud · Redwater. All counties: Texas county list.