Seagoville Texas Directional Boring: Trinity Clay, US 175, East Fork Trinity River
Quick Answer: Malloy Bridge Road and US 175 are likely bore corridors, and we take directional boring, also called horizontal directional drilling (HDD), work in Seagoville, Texas. The Yukon, Oklahoma main office is 238 road miles away, with US 175 running 13.8 mapped roadway miles inside the city. Trinity clay is the key ground condition: heavy clay can cling to a reamer and grip pipe, so fluid and reaming pace matter. The East Fork Trinity River adds a crossing to plan around.
Seagoville bores at a glance
- Incorporated city in Dallas County and Kaufman County, Texas. Population 20,124 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 238 miles, about 4.7 hours of driving.
- Ground: Trinity soil is mapped on 21 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 10 percent of the area.
- Highways inside the boundary: US 175, FM 740 and FM 1389. State permit office: TxDOT Dallas District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: East Fork Trinity River, Parsons Slough, Hickory Creek and Gof Branch.
- Public water: City of Seagoville, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near US 175 in Seagoville?
We take directional boring work in Seagoville, Dallas County, where the Census Bureau Vintage 2024 estimate puts the population at 20,124. Along US 175 or Malloy Bridge Road, our crews can install water, sewer, gas, electric conduit or fiber without cutting across the roadway. We also handle bores for service lines and longer utility runs.
Our main office is in Yukon, Oklahoma, and Seagoville work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Trinity is a family business started in 1965, with directional boring work dating to 1982. We have gone over 25 years without a utility strike, a record that matters around the City of Seagoville water system and the electric lines reported in Dallas County.

What kind of ground does Trinity soil mean for a Seagoville bore?
The USDA soil survey maps Trinity as the leading soil series in Seagoville, covering 21 percent of the city. At about 40 inches below the surface, clay is mapped across 81 percent of the area, and the survey lists an average clay content of 49 percent at that depth. Surface texture is also mostly clay, mapped on 51 percent of the area. These are mapped soil patterns, not test borings; a site check is still needed to plan each run.
| USDA soil survey, inside the Seagoville city limits | What is mapped |
|---|---|
| Soil series mapped | Trinity 21 percent, Axtell 14 percent, Wilson 10 percent, Houston Black 9 percent and Ferris 7 percent |
| Texture at the surface | clay 51 percent, fine sandy loam 26 percent and clay loam 10 percent |
| Texture about 40 inches down | clay 81 percent, sandy clay loam 9 percent and silty clay 6 percent |
| Engineering class about 40 inches down | fat clay (CH) 80 percent and lean clay (CL) 14 percent |
| Average clay content about 40 inches down | 49 percent |
| Bedrock mapped within 60 inches | 10 percent of the area (0 percent hard rock, 10 percent weathered rock) |
| Seasonal water table within 60 inches | 14 percent of the area |
| Flood prone soils | 24 percent of the area |
| High corrosion risk for uncoated steel | 88 percent of the area |
The USDA soil survey maps bedrock within 60 inches in 10 percent of Seagoville, all described as weathered rather than hard bedrock; a hard rock bit is not indicated by that map. Seasonal water within 60 inches is mapped in 14 percent of the area, while flood prone soils cover 24 percent. High steel corrosion risk is mapped in 88 percent. The Silty Clay Decomposition Residuum is Cenozoic and strongly expansive, so clay handling, pit drainage and line material need attention.
How do crews bore Seagoville clay without opening the street?
US 175, Malloy Bridge Road and the mapped Trinity clay call for a bore plan based on the route, not just the footage. We use staged drilling and keep the hole stable while protecting nearby pavement and marked utilities.
- Trinity clay can load up a reamer, so we use thinner drilling fluid with polymer and open the hole in stages along routes such as Simonds Road.
- Heavy clay can hold pressure against pavement near US 175, so we watch fluid returns and keep pressure controlled beneath the roadway.
- The East Fork Trinity River and flood prone soil areas call for depth planning beneath the channel, with pit locations chosen for site conditions.
- Near Kaufman Street, we hydrovac expose marked utilities before the drill approaches; then a walkover locator tracks depth and pitch along the bore.

Which roads, tracks or creeks could a Seagoville bore cross near Malloy Bridge Road?
US 175 has 13.8 mapped roadway miles inside Seagoville, while FM 740 has 2.3 and FM 1389 has 2.0. Interstate 20 runs 0.4 miles outside the city limits. Among the longer local streets, Malloy Bridge Road covers 7.44 miles in the city, Simonds Road 4.59 miles and Seagoville Road 3.88 miles. A bore under one of these routes needs a path and pit locations that fit the specific right of way and pavement.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 175 | US highway | 13.8 roadway miles inside | State highway office |
| FM 740 | State highway | 2.3 roadway miles inside | State highway office |
| FM 1389 | State highway | 2 roadway miles inside | State highway office |
| Interstate 20 | Highway nearby | 0.4 miles outside | State highway office |
| East Fork Trinity River | Stream | 4.45 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Parsons Slough | Stream | 1.68 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Hickory Creek | Stream | 0.42 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Gof Branch | Stream | 0.11 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Trinity River | Stream | 0.1 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Mustang Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| South Mesquite Creek | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
| Gravel Slough | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
| Daugherty Lake | Lake or pond | 18 acres, nearby | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Seagoville or within one mile outside the limits, so there is no mapped track crossing to plan around. The East Fork Trinity River runs 4.45 channel miles in the city, and seven mapped street crossings intersect named streams. Parsons Slough adds 1.68 channel miles. Daugherty Lake is 18 acres and lies outside the city limits; creek work needs a check for federal water jurisdiction during planning.
Who approves a Seagoville bore on Dallas County roads or US 175?
Seagoville is incorporated, so its city streets, including Kaufman Street, belong to the city; we do not assume a city form or fee. Work in the right of way of US 175, FM 740, FM 1389 or nearby Interstate 20 needs a TxDOT utility permit. The line owner, not the drilling contractor, files through TxDOT’s online RULIS system, and the TxDOT Dallas District reviews it. We prepare the bore plan and profile for the utility owner and work under its issued permit.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Seagoville water system?
The City of Seagoville public water system uses purchased surface water and reports 6,439 service connections serving 20,156 people. Electric service reporting in Dallas County includes Oncor Electric Delivery Company, Texas-New Mexico Power, City of Garland, Farmers Electric Cooperative, HILCO Electric Cooperative and Trinity Valley Electric Cooperative. Before planning an electric conduit bore near US 175 or Kaufman Street, the line owner for that location has to be confirmed.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Seagoville | Public water system | Surface water bought from another system | 6,439 connections, 20,156 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, City of Garland, Farmers Electric Cooperative, HILCO Electric Cooperative and Trinity Valley Electric Cooperative | Electric utilities reporting service in Dallas County and Kaufman County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates give Seagoville a median housing year of 2001; 14 percent of homes were built before 1960, while 53 percent date to 2000 or later. That mix can mean replacement work beside older services and new runs for later construction. On Kaufman Street, paint shows a marked line’s position, not its depth, so we hydrovac expose marked utilities before drilling near them.

Where is Seagoville in relation to Combine and the Yukon yard?
Seagoville covers 18.81 square miles at an elevation of 439 feet, with 86 percent of the incorporated city in Dallas County and 14 percent in Kaufman County. ZIP code 75159 serves the city. Combine is 4.7 miles south, Heartland is 5.4 miles east, and Balch Springs is 6.0 miles northwest. Mesquite, the nearest larger city, is 7.7 miles north; Dallas, the Dallas County seat, is 16.1 miles northwest. The Yukon, Oklahoma main office is 238 road miles and 4.7 drive hours away.
Places near Seagoville
- Directional boring in Combine: 4.7 miles south
- Directional boring in Heartland: 5.4 miles east
- Directional boring in Balch Springs: 6 miles northwest
- Directional boring in Crandall: 6.7 miles east
- Directional boring in Mesquite: 7.7 miles north
What kinds of bores could come up along Simonds Road in Seagoville?
- Highway crossing: A bore beneath US 175 can keep the roadway surface intact, with the utility owner handling the TxDOT permit filing.
- Water service: A connection near the City of Seagoville system needs a route that accounts for existing water lines and service connections.
- Fiber run: Along Simonds Road, a conduit bore can pass beneath pavement while keeping the surface open for traffic.
- Creek crossing: A bore near the East Fork Trinity River needs a planned path below the channel and a check for federal water jurisdiction.
- Street crossing: At Malloy Bridge Road, marked utilities are exposed before drilling near them, since surface paint does not show burial depth.
- Drainage run: A route near Parsons Slough needs attention to channel depth and pit placement in ground that may be flood prone.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a directional boring quote for Seagoville near Kaufman Street?
For a Seagoville quote, send the address or map pin, what will go in the ground, pipe or conduit size and footage; a sketch or plans help. A route near Kaufman Street may involve older services, while a run toward Malloy Bridge Road could meet a different mix of pavement, utilities or drainage. Those site details help us shape a useful scope.
In Seagoville, the clay mapped at about 40 inches is a leading cost factor because it can stick to the reamer and grip pipe. Length, pipe size, utility crossings that need exposure, pavement, creek or drainage crossings, pits and excavator time also affect the job. A path under US 175 brings right of way planning into the scope, and the 238 road miles from Yukon can affect mobilization. High profile or emergency work can change the planning needs as well.
Questions people ask about boring in Seagoville
Does Trinity Boring Solutions take Seagoville jobs in Dallas County, and who staffs them?
Yes. We take directional boring work in Seagoville, Dallas County, using our crews or partner contractor crews from satellite yards. The job is managed through Trinity from the initial call to the bore log, regardless of which crew is at the site. That gives a customer one point of contact for a run near US 175 or elsewhere in the city.
Can groundwater near the East Fork Trinity River cause trouble for Seagoville bore pits?
It can affect pit planning. The USDA soil survey maps seasonal water within 60 inches in 14 percent of Seagoville and flood prone soils across 24 percent. For a crossing near the East Fork Trinity River, we consider channel depth and pit drainage, and plan to keep the bore below the channel where the route requires it.
Does Trinity soil in Seagoville put steel casing at risk, and what pipe can be used?
The mapped soil conditions show high steel corrosion risk across 88 percent of Seagoville. HDPE is not subject to that soil corrosion concern, while the line owner chooses any coating needed for steel casing or tracer wire. A bore near the City of Seagoville water system still needs the pipe choice matched to the project requirements.
What is the ground like for a Seagoville bore through Trinity soil?
The USDA soil survey maps Trinity as 21 percent of Seagoville, with clay making up 81 percent of mapped texture at about 40 inches. Heavy clay can cling to the reamer and grip pipe. On a route near Malloy Bridge Road, we plan fluid and reaming stages around the actual ground rather than treating the map as a site boring.
How much bedrock is mapped within five feet of the surface in Seagoville?
The USDA soil survey maps bedrock within 60 inches in 10 percent of Seagoville, and identifies it as weathered bedrock. Hard bedrock is not mapped within that depth range. A route near FM 1389 still needs site specific planning because the soil survey describes mapped patterns rather than conditions confirmed by a test boring.
Who approves a Seagoville bore under US 175, and which state office reviews it?
For work in the US 175 right of way, the utility owner files the TxDOT permit application through RULIS, not the drilling contractor. The TxDOT Dallas District reviews the filing. We prepare the bore plan and profile for the line owner, and the permit determines the project requirements for a crossing near Seagoville.
Will Trinity take Seagoville work near Combine or at rural sites outside the city?
Yes. We take work near Combine, 4.7 miles south of Seagoville, and at rural sites beyond the city limits. The route still determines the bore plan: a job near Malloy Bridge Road may involve different utilities or drainage than a run outside town. Our Yukon main office is 238 road miles from Seagoville.
How much Texas811 notice does a Seagoville bore near Malloy Bridge Road need?
Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If a bore near Malloy Bridge Road starts more than 14 days after the original notice, a new request is needed. Marks that wear off or move must be refreshed through Texas811 before work continues.
What affects the cost of directional boring in Seagoville under US 175?
The route, length and pipe size shape the scope, with Seagoville’s heavy clay a key factor because it can cling to the reamer. Utility exposures, pavement, creek or drainage crossings, pits and excavator time also matter. Work in the US 175 right of way adds permit planning, and the 238 road miles from Yukon affect mobilization.
Where the Seagoville facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Seagoville
- U.S. Census Bureau, TIGER/Line 2024: Seagoville boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Seagoville
- U.S. Census Bureau, American Community Survey 2019 to 2023: Seagoville housing units and year built
- Macrostrat geologic map compilation: map units under Seagoville
- U.S. EPA Safe Drinking Water Information System: public water systems serving Seagoville
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Dallas County and Kaufman County
- U.S. Geological Survey, Elevation Point Query Service: Seagoville elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Seagoville
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Seagoville
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Seagoville, Texas
Type the address of your job in Seagoville. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Seagoville
Same county: Dallas · Irving · Garland · Grand Prairie · Richardson · Rowlett · DeSoto · Carrollton · Cedar Hill · Lancaster · Coppell · Duncanville. All counties: Texas county list.
