Alamo Heights Texas Directional Boring: Eckrant Cobbly Clay, Loop 368 and Olmos Creek
Quick Answer: On Broadway, Trinity Boring Solutions installs lines by directional boring, also called horizontal directional drilling (HDD), to pass beneath pavement without an open cut. From our Yukon, Oklahoma main office, the Alamo Heights site is 473 road miles away, and Loop 368 crossings are part of the mobilization plan. The USDA soil survey maps Eckrant soil across 77% of the city, with cobbly clay that can grip the pipe. Crews stage reaming and pull pipe promptly where Eckrant ground holds tight.
Alamo Heights bores at a glance
- Incorporated city in Bexar County, Texas. Population 7,557 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 473 miles, about 9.2 hours of driving.
- Ground: Eckrant soil is mapped on 77 percent of the area, with bedrock about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 90 percent of the area.
- Highways inside the boundary: Loop 368. State permit office: TxDOT San Antonio District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Olmos Creek.
- Public water: City of Alamo Heights, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring in Alamo Heights and Bexar County?
We take directional boring work in Alamo Heights, an incorporated city in Bexar County. The Census Bureau Vintage 2024 estimate puts Alamo Heights at 7,557 people, a population figure we keep separate from underground site conditions. Along Broadway or Castano Avenue, we install water, sewer, gas, electric conduit and fiber lines by boring beneath the street or other surface rather than cutting a trench across it.
Our main office is in Yukon, Oklahoma, and Alamo Heights work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. The family operation dates to 1965, and we have focused on directional boring since 1982. Along Castano Avenue, that experience covers work from 3/4 inch service lines to 48 inch casing and bore lengths from 10 feet to 5,000 feet.

What ground does an Alamo Heights bore meet in Eckrant soil?
The USDA soil survey maps Eckrant soil across 77% of Alamo Heights, including Eckrant and rock outcrop association on 47% of the mapped area and Eckrant cobbly clay on 30%. The surface is very cobbly clay in 47% of the city and cobbly clay in another 30%. About 40 inches down, bedrock is mapped across 90% of the area and clay across 10%; average clay content at that depth is 51%. These are mapped patterns, not test borings, so a route still needs site specific planning.
| USDA soil survey, inside the Alamo Heights city limits | What is mapped |
|---|---|
| Soil series mapped | Eckrant 77 percent, Austin 9 percent, Tinn 6 percent and Eddy 4 percent |
| Texture at the surface | very cobbly clay 47 percent, cobbly clay 30 percent and clay 10 percent |
| Texture about 40 inches down | bedrock 90 percent and clay 10 percent |
| Engineering class about 40 inches down | fat clay (CH) 10 percent |
| Average clay content about 40 inches down | 51 percent |
| Bedrock mapped within 60 inches | 90 percent of the area (77 percent hard rock, 13 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 6 percent of the area |
| High corrosion risk for uncoated steel | 96 percent of the area |
The USDA soil survey places bedrock within 60 inches across 90% of Alamo Heights, with hard bedrock mapped across 77% and weathered bedrock across 13%. Typical bedrock depth is 13 inches, so crews need to expect rock early and allow more time where hard material controls the cut. The mapped unit is Late Cretaceous Austin Chalk. No seasonal water table is mapped within 60 inches, while flood prone soils cover 6%. High steel corrosion risk is mapped across 96%, so the line owner should consider casing and tracer wire protection.
How do crews bore through Alamo Heights bedrock?
Eckrant cobbly clay and shallow mapped bedrock call for a bore plan that manages sticky cuttings and changing resistance. At Broadway and other paved streets, the route and fluid pressure also need to protect the surface.
- Eckrant cobbly clay can stick to the reamer, so we use thinner drilling fluid with polymer and open the hole in stages before pulling pipe promptly.
- With hard bedrock mapped across 77% of Alamo Heights, we choose rock capable tooling when the bore meets Austin Chalk and allow for slower progress.
- Before the drill approaches any marked utility, we expose it with hydrovac potholing; paint near Broadway shows a line’s route, not its depth.
- We follow the drill head with a walkover locator and record depth and pitch, paying close attention where cobbles or bedrock could push the path off line.

What could a bore cross near Broadway in Alamo Heights?
Loop 368 is the state highway mapped inside Alamo Heights, with 1.1 roadway miles in the city. US 281 runs along or touches the limits, and Interstate 410 is 1.4 miles away. Broadway is the longest named street in the city at 2.0 miles; Castano Avenue runs 1.19 miles, and Alamo Heights Boulevard runs 1.17 miles. These paved routes can make a bore useful for keeping a new line below the road surface, with the highway location shaping the permit and depth plan.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Loop 368 | State highway | 1.1 roadway miles inside | State highway office |
| US 281 | Highway nearby | Runs along or touches the city limits | State highway office |
| Interstate 410 | Highway nearby | 1.4 miles outside | State highway office |
| Union Pacific | Railroad nearby | 0.2 miles outside | The railroad |
| Olmos Creek | Stream | 1.53 channel miles inside | Checked for Corps of Engineers jurisdiction |
| San Antonio River | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Alamo Heights, but Union Pacific track is 0.2 miles outside the city limits. Public mapping shows no street and rail crossings inside the city. Olmos Creek runs 1.53 channel miles through Alamo Heights, and three street crossings of named streams are mapped. No lakes or ponds are mapped within one mile of Alamo Heights, but we still check actual crossing conditions before selecting a bore path. A creek route needs its own depth and access review, rather than being treated like an ordinary street bore.
Who permits an Alamo Heights bore near Union Pacific?
Alamo Heights is incorporated, so its local streets, including Broadway, belong to the city. A bore in Loop 368 right of way needs a TxDOT utility permit, reviewed by the TxDOT San Antonio District. The utility that owns the line files through RULIS; we prepare the bore plan and profile and work under the permit issued to that utility. For electric or communication lines crossing the highway, the usual minimum cover is 60 inches below the lowest crossed grade. Water crossings also need 60 inches, while pressurized sewer crossings need 60 inches. The district can set another depth in the permit.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried by City of Alamo Heights?
The City of Alamo Heights public water system serves 7,357 people through 3,933 service connections and uses groundwater wells. Before we plan a water service bore near Broadway, we account for existing lines along the route. County reports list City of San Antonio, Bandera Electric Cooperative, Guadalupe Valley Electric Cooperative, Karnes Electric Cooperative and Pedernales Electric Cooperative as electric service utilities. For an electric conduit bore in Alamo Heights, we confirm which utility owns the line before planning the route.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Alamo Heights | Public water system | Groundwater wells | 3,933 connections, 7,357 people served |
| City of San Antonio, Bandera Electric Cooperative, Guadalupe Valley Electric Cooperative, Karnes Electric Cooperative and Pedernales Electric Cooperative | Electric utilities reporting service in Bexar County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Alamo Heights’ median housing year at 1954. The survey maps 53% of housing built before 1960, 37% from 1960 to 1999 and 10% from 2000 or later. That mix means a project may involve replacing an older service or adding a new one. Before a bore near Castano Avenue, marked utilities along the path must be exposed with hydrovac potholing so their actual depth is known.

Where is Alamo Heights in relation to Olmos Park?
Alamo Heights is an incorporated city in Bexar County, covers 1.84 square miles and sits at 764 feet elevation. Its ZIP code is 78209. Olmos Park is 1.2 miles southwest, and Terrell Hills is 1.3 miles east. San Antonio is 3.7 miles west and is both the nearest larger city and the county seat. From our Yukon, Oklahoma yard, the road trip is 473 miles and 9.2 hours. That distance is part of planning equipment and crew mobilization for a job on streets such as Broadway.
Places near Alamo Heights
- Olmos Park: 1.2 miles southwest
- Directional boring in Terrell Hills: 1.3 miles east
- Directional boring in San Antonio: 3.7 miles west
- Directional boring in Castle Hills: 4.2 miles northwest
- Directional boring in Balcones Heights: 4.9 miles west
What could we bore near Castano Avenue in Alamo Heights?
- Highway crossing: A Loop 368 bore keeps the new line below the state highway pavement, with the permitted depth guiding the profile.
- Water service: A connection near Broadway can tie into the City of Alamo Heights groundwater system without opening the full paved route.
- Fiber drop: A fiber conduit along Castano Avenue can pass beneath pavement, with nearby marked lines exposed before drilling approaches.
- Creek crossing: A route beneath Olmos Creek needs a profile that stays below the channel and a review for federal waterway jurisdiction.
- Rail crossing: A proposed route toward Union Pacific track outside the city limits needs the railroad’s crossing agreement before work is planned.
- Utility replacement: An older service near Alamo Heights Boulevard can be replaced by boring beneath the street instead of trenching across its surface.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote work near Olmos Creek in Alamo Heights?
Send an address or map pin first. The exact spot matters near Olmos Creek, where a change in alignment can change the creek crossing and access plan. For an Alamo Heights crossing, we need to know what goes in the ground, the pipe or conduit size and the footage to plan the bore. A sketch or plans help us see nearby streets such as Broadway and any proposed pits.
Eckrant cobbly clay and shallow Austin Chalk bedrock put ground conditions first in the price because they can affect tooling and reaming time. The number and depth of utilities to expose matter too, especially around Broadway. Pavement, a crossing at Olmos Creek, pits, excavator time and sand backfill also shape the work. A Loop 368 permit route can add planning needs, and the 473 road miles from Yukon affect mobilization. In Alamo Heights, high profile or emergency work can change the scope, so we review crossing needs before setting the boring plan.
Questions people ask about boring in Alamo Heights
Does Trinity take directional boring jobs in Alamo Heights and Bexar County?
Yes. We serve Alamo Heights with our own crews and through partner drilling contractors operating from satellite yards. The Yukon main office stays your point of contact from the first call through the bore log, including for a project along Broadway or near the University of the Incarnate Word.
What ground should I expect for a bore in Alamo Heights Eckrant soil?
The USDA soil survey maps Eckrant soil across 77% of Alamo Heights, often as cobbly clay or very cobbly clay at the surface. About 40 inches down, bedrock is mapped across 90% of the area. That mix can mean sticky cuttings above rock, so the route and tooling need to account for both.
Is there rock under Alamo Heights, and how deep is it mapped?
Yes, bedrock is mapped within 60 inches across 90% of Alamo Heights. Hard bedrock accounts for 77% of the area and weathered bedrock for 13%, with typical depth at 13 inches. The mapped geology is Austin Chalk, so a bore may need rock tooling and additional time.
Who approves a bore under Loop 368 in Alamo Heights?
TxDOT reviews a utility permit for work in Loop 368 right of way through the TxDOT San Antonio District. The utility owner files in RULIS, while we supply the bore plan and profile and work under the owner’s permit. Cover requirements depend on the line type and the crossing profile.
What does an Alamo Heights bore under Union Pacific track require?
A crossing under Union Pacific track needs an agreement from the railroad that owns it. The agreement sets the crossing conditions, including casing, depth and flagging. Union Pacific track is mapped 0.2 miles outside Alamo Heights, so the actual route determines whether a railroad crossing is involved.
Can a line be bored under Olmos Creek in Alamo Heights?
A bore can be planned beneath Olmos Creek, but the crossing needs a profile that stays below the channel. During planning, we check whether the US Army Corps of Engineers has jurisdiction over an Alamo Heights crossing before finalizing the bore approach. Olmos Creek has 1.53 channel miles in the city, so its location and access matter to the route.
How far is Alamo Heights from the Yukon office, and does San Antonio affect the job?
Alamo Heights is 473 road miles and 9.2 drive hours from our Yukon, Oklahoma yard. San Antonio is 3.7 miles west and is the nearest larger city, but mobilization is planned from Yukon. The route, equipment and scope for a Broadway job all factor into that planning.
How early should I call Texas811 for a bore on Broadway in Alamo Heights?
Request a Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. Texas811 describes this as at least two working days. If the start slips more than 14 days past the original notice, submit a new notice; refresh marks that wear off or move before continuing near Broadway.
What affects the cost of a directional bore near Loop 368 in Alamo Heights?
Eckrant cobbly clay and shallow Austin Chalk can affect tooling and time, while utility crossings and the need to expose lines affect the route. Pavement, creek work, pits and excavator time also change the scope. A Loop 368 permit crossing and mobilization from 473 road miles away are additional job factors.
Where the Alamo Heights facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Alamo Heights
- U.S. Census Bureau, TIGER/Line 2024: Alamo Heights boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Alamo Heights
- U.S. Census Bureau, American Community Survey 2019 to 2023: Alamo Heights housing units and year built
- Macrostrat geologic map compilation: map units under Alamo Heights
- U.S. EPA Safe Drinking Water Information System: public water systems serving Alamo Heights
- U.S. Department of Transportation, North American Rail Network: track owners in Bexar County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Bexar County
- U.S. Geological Survey, Elevation Point Query Service: Alamo Heights elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Alamo Heights
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Alamo Heights
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Alamo Heights, Texas
Type the address of your job in Alamo Heights. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Alamo Heights
Same county: Converse · Universal City · Live Oak · Timberwood Park · Leon Valley · Helotes · Lackland AFB · Kirby · Selma · Fair Oaks Ranch · Schertz · Windcrest. All counties: Texas county list.