Weimar Texas Directional Boring: Frelsburg Clay, Interstate 10, Union Pacific
Quick Answer: The City of Weimar owns its groundwater water system, and the city also owns its electric system; we confirm the line owner before planning a bore under Interstate 10. Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Weimar, including work near Union Pacific track. From Yukon, Weimar is 445 road miles away, so a job near St Charles Street includes mobilization planning. Frelsburg clay is the main ground concern: sticky heavy clay can grip pipe, so we manage fluid and ream in stages.
Weimar bores at a glance
- Incorporated city in Colorado County, Texas. Population 2,194 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 445 miles, about 8.8 hours of driving.
- Ground: Frelsburg soil is mapped on 40 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 9 percent of the area.
- Highways inside the boundary: Interstate 10, US 90, FM 155 and FM 253. State permit office: TxDOT Yoakum District.
- Railroad track inside the boundary: Union Pacific, with 9 mapped street and rail crossings.
- Named streams inside the boundary: Clear Creek and West Sandy Creek.
- Public water: City of Weimar, groundwater wells.
- Electric: City of Weimar municipal electric system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring in Weimar and Colorado County?
We take directional boring work in Weimar, an incorporated city in Colorado County with a population of 2,194, according to the Census Bureau Vintage 2024 estimate. Our crews can place water, sewer, gas, electric conduit and fiber along routes such as Main Street or across a road like FM 155. The route and the line owner determine the bore plan.
Our main office is in Yukon, Oklahoma, and Weimar work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A 3/4 inch service line along Mechanic Street is at the small end of our range; a 48 inch casing beneath Interstate 10 is at the large end. Our family business started in 1965 and has done directional boring since 1982, with that capacity available for Weimar projects.

What ground does a Weimar bore meet in Frelsburg soil?
The USDA soil survey maps Frelsburg soil across 40 percent of Weimar, and its Frelsburg clay map unit covers 39 percent. At about 40 inches below the surface, clay makes up 43 percent of the mapped texture; clay loam accounts for 30 percent. The survey classifies 83 percent of the area at that depth as heavy clay. We treat mapped patterns for Weimar as planning context, not test borings. For a route off Eagle Street, the actual soil still needs to be judged at the bore location.
| USDA soil survey, inside the Weimar city limits | What is mapped |
|---|---|
| Soil series mapped | Frelsburg 40 percent, Hallettsville 27 percent, Carbengle 9 percent, Straber 8 percent and Dubina 6 percent |
| Texture at the surface | clay 43 percent, sandy clay loam 42 percent and loamy fine sand 14 percent |
| Texture about 40 inches down | clay 43 percent, clay loam 30 percent and sandy clay 10 percent |
| Engineering class about 40 inches down | fat clay (CH) 55 percent and lean clay (CL) 35 percent |
| Average clay content about 40 inches down | 43 percent |
| Bedrock mapped within 60 inches | 9 percent of the area (0 percent hard rock, 9 percent weathered rock) |
| Seasonal water table within 60 inches | 2 percent of the area |
| Flood prone soils | 2 percent of the area |
| High corrosion risk for uncoated steel | 48 percent of the area |
The USDA soil survey places weathered bedrock within 60 inches across 9 percent of Weimar; it records no hard bedrock in that depth. Seasonal water table and flood prone soils each affect 2 percent of the mapped area, so creekside planning still needs attention even though those shares are small. Across Weimar, our mapping shows high steel corrosion risk across 48 percent, which we use as a planning flag rather than a site result. The Fleming Formation, a Miocene unit of clay and sandstone, is the local geologic map unit; the line owner should consider steel protection.
How do crews bore Weimar clay without opening the street?
Frelsburg clay can stay in the hole but stick to the reamer and grip a pipe. On a Weimar route, we adjust the drilling fluid and reaming sequence to suit the ground instead of forcing the pull.
- With Weimar’s heavy clay, we use a thinner fluid mix with polymer and ream in stages to limit sticky buildup on the reamer.
- Because 83 percent of mapped ground is heavy clay at about 40 inches, we watch fluid returns and keep pressure controlled near pavement.
- Frelsburg clay can grip pipe, so we prepare the line and plan the pull to follow reaming without leaving the hole open longer than needed.
- Where a Weimar bore approaches mapped weathered bedrock, we check steering response and depth as the drill moves from soil into harder material.

Where might a Weimar bore pass under Clear Creek or a road?
Interstate 10 has 3.8 mapped roadway miles within Weimar, alongside 1.9 miles of US 90, 2.0 miles of FM 155 and 0.4 miles of FM 253. A crossing beneath one of those highways needs a route and bore plan suited to its right of way. St Charles Street is the longest named street at 1.48 miles in the city; Eagle Street measures 1.47 miles and Mechanic Street 1.45 miles. Those street routes can call for a bore that avoids cutting pavement.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 10 | Interstate | 3.8 roadway miles inside | State highway office |
| US 90 | US highway | 1.9 roadway miles inside | State highway office |
| FM 155 | State highway | 2 roadway miles inside | State highway office |
| FM 253 | State highway | 0.4 roadway miles inside | State highway office |
| Union Pacific | Railroad | 1.23 track miles inside | The railroad |
| Clear Creek | Stream | 0.12 channel miles inside | Checked for Corps of Engineers jurisdiction |
| West Sandy Creek | Stream | 0.03 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Harvey Creek | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
| Middle Fork Harveys Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific has 1.23 track miles in Weimar on its Glidden Subdivision, and Amtrak uses the track. Public mapping shows 9 street and rail crossings in the city, so a route near the tracks needs careful coordination. Clear Creek runs 0.12 channel miles within Weimar, while West Sandy Creek runs 0.03 miles. No mapped street crossings of named streams appear in the city, and no lakes or ponds are mapped within one mile.
Who approves a Weimar bore near Union Pacific or a highway?
For work in the right of way on Interstate 10, US 90, FM 155 or FM 253, the line owner files the utility application through TxDOT’s RULIS system, not the driller. We prepare the bore plan and profile for that filing, and the TxDOT Yoakum District reviews it. TxDOT cover rules set 60 inches below the lowest crossed grade for electric and communication lines, and 60 inches for water lines; along the right of way, the figures are 48 inches and 36 inches respectively. Pressurized sewer crossings need 60 inches of cover. Union Pacific requires a crossing agreement for its track, and Clear Creek is checked for federal waterway jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground in Weimar near the City of Weimar system?
The City of Weimar public water system uses groundwater wells and reports 1,135 service connections serving 2,226 people. The city owns its municipal electric system too. Before a conduit bore near Eagle Street, we confirm the line owner for that address rather than assuming which system is present. Knowing who owns the water or electric line helps set the route and coordinate the work.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Weimar | Public water system | Groundwater wells | 1,135 connections, 2,226 people served |
| City of Weimar municipal electric system | City owned electric system | Reports to the U.S. Energy Information Administration | 1,254 customers reported |
| AEP Texas Central, CenterPoint Energy, Bluebonnet Electric Cooperative, Fayette Electric Cooperative, San Bernard Electric Cooperative and Wharton County Electric Cooperative | Electric utilities reporting service in Colorado County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Weimar’s median housing year at 1968; 35 percent of units were built before 1960, while 17 percent date from 2000 or later. An older service along Eagle Street may call for a replacement route, while a newer property may need a new connection. We hydrovac pothole every marked utility on the bore path before drilling near it; for example, a marked line under Eagle Street must be exposed to check its depth.

How far is Weimar from Ellinger and our Yukon yard?
Weimar is in Colorado County, at an elevation of 401 feet, and covers 2.31 square miles. ZIP code 78962 serves Weimar, giving us a location reference when reviewing a boring request. Schulenburg is 7.9 miles west, Ellinger is 10.4 miles northeast, and Glidden is 11.4 miles east. Columbus, the county seat, is 13.2 miles east; Giddings is 34.6 miles north and is the nearest larger city. The Yukon yard is 445 road miles away, an 8.8 hour drive, which is part of planning a Weimar mobilization.
Places near Weimar
- Directional boring in Schulenburg: 7.9 miles west
- Directional boring in Ellinger: 10.4 miles northeast
- Directional boring in Glidden: 11.4 miles east
- Directional boring in Columbus: 13.2 miles east
- Directional boring in Sheridan: 14.5 miles southeast
- Directional boring in Giddings: 34.6 miles north
What kinds of bores fit Weimar streets such as St Charles Street?
- Highway crossing: An Interstate 10 bore runs beneath the travel lanes, avoiding an open cut through pavement.
- Street service: A water or sewer service along St Charles Street can pass beneath the roadway with pits in the dirt at each end.
- Fiber conduit: A conduit route near Eagle Street can be bored under pavement while marked utilities are exposed before drilling nearby.
- Rail crossing: A bore beneath the Union Pacific Glidden Subdivision needs a route coordinated with the railroad agreement.
- Creek crossing: A Clear Creek route needs depth planning beneath the channel and a check for federal waterway jurisdiction.
- Water connection: A service connecting to the City of Weimar system needs the line owner and route confirmed before the bore is set.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a Weimar bore near Interstate 10?
For a Weimar quote, send the address or map pin, planned installation, pipe or conduit size, and footage; a sketch or plans help us scope the request. A route crossing Interstate 10 or St Charles Street gives us a useful starting point for reviewing access and the likely crossing work.
The job details shape the price, not just the footage. Frelsburg heavy clay can change drilling and reaming needs, while an Interstate 10 crossing brings right of way and pavement requirements into the scope. A Union Pacific track crossing calls for railroad coordination. We also account for pipe size, exposed utilities, concrete or pavement, creek or drainage crossings, pits and excavator time. Mobilization matters with 445 road miles between Weimar and Yukon.
Questions people ask about boring in Weimar
Does Trinity take directional boring jobs in Weimar and Colorado County?
Yes. We take Weimar work across Colorado County and staff it with our own crews or vetted drilling contractor partners operating from satellite yards. We work with you from the first Weimar call through the bore log, regardless of which crew is on site. A route near FM 155 is planned around the line and ground at that location.
Who controls Mechanic Street in Weimar, and can a bore avoid cutting it?
Mechanic Street is a city street because Weimar is incorporated. A directional bore can pass beneath its pavement, with entry and exit pits placed off the paved surface where the site allows. We check marked utilities along the route before the drill approaches them.
Does Weimar’s older housing near Eagle Street mean replacement lines need bores?
It can. The American Community Survey 2019 to 2023 estimates put the median housing year at 1968, and 35 percent of units were built before 1960. That age can make replacement service routes relevant near Eagle Street, but the existing line and proposed route need to be checked at the address.
Does Frelsburg soil in Weimar corrode steel, and what pipe can be used?
The USDA soil survey maps high steel corrosion risk across 48 percent of Weimar. That matters when the line owner selects steel casing or tracer wire materials. HDPE does not have the same soil corrosion concern, but the line owner chooses the pipe and any coating based on the project.
What ground will a bore encounter in Weimar’s Frelsburg soil?
Frelsburg soil covers 40 percent of Weimar in the USDA soil survey, and clay accounts for 43 percent of mapped texture at about 40 inches down. Heavy clay is mapped across 83 percent at that depth. It can cling to the reamer and grip pipe, so we stage the reaming and manage fluid.
Will a Weimar bore hit rock near the surface?
The USDA soil survey maps bedrock within 60 inches across 9 percent of Weimar, and describes it as weathered rather than hard in that depth. The local Fleming Formation includes clay and sandstone. A survey map does not replace checking the actual bore route, so ground conditions can affect the drilling plan.
How far is Weimar from Yukon, and does Giddings change mobilization?
Weimar is 445 road miles and an 8.8 hour drive from our Yukon yard. Giddings, 34.6 miles north, is the nearest larger city, but it does not change the distance from our main office. We factor the Weimar mobilization into planning for work near US 90 or elsewhere in town.
How much 811 notice is needed for a Weimar bore near St Charles Street?
Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. Marks near St Charles Street show position, not depth. If the start slips more than 14 days past the original notice, make a new request; refresh marks that wear off or move before work continues.
What affects the price of a directional bore in Weimar near Interstate 10?
The price depends on the route and scope. Frelsburg clay, pipe size and bore length affect the ground work; Interstate 10 pavement, Union Pacific track or a drainage crossing can add coordination and exposure needs. Pits, excavator time, backfill, emergency timing and mobilization from Yukon also affect the job.
Where the Weimar facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Weimar
- U.S. Census Bureau, TIGER/Line 2024: Weimar boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Weimar
- U.S. Census Bureau, American Community Survey 2019 to 2023: Weimar housing units and year built
- Macrostrat geologic map compilation: map units under Weimar
- U.S. EPA Safe Drinking Water Information System: public water systems serving Weimar
- U.S. Department of Transportation, North American Rail Network: track owners in Colorado County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Colorado County
- U.S. Geological Survey, Elevation Point Query Service: Weimar elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Weimar
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Weimar
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Weimar, Texas
Type the address of your job in Weimar. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Weimar
Same county: Eagle Lake · Garwood · Nada · Rock Island. All counties: Texas county list.
