Anthony Texas Directional Boring: Bluepoint Soil, Interstate 10 and East Drain

Quick Answer: We take directional boring, also called horizontal directional drilling (HDD), in Anthony, Texas, including routes beneath Interstate 10. Anthony is 677 road miles from our Yukon, Oklahoma main office, and we staff jobs with our own crews and vetted partner contractor crews. Bluepoint soil covers 26 percent of the mapped area, and sandy or gravelly ground can cave behind the bit, so staged reaming helps hold the bore open. East Drain and BNSF Railway are route features we check when planning a bore path.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Anthony bores at a glance

  • Incorporated city in El Paso County, Texas. Population 4,542 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 677 miles, about 13.8 hours of driving.
  • Ground: Bluepoint soil is mapped on 26 percent of the area, with stratified sand to loamy fine sand to very fine sandy loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Interstate 10, US 180, US 85, Texas State Highway 20 and FM 1905. State permit office: TxDOT El Paso District.
  • Railroad track inside the boundary: BNSF Railway, with 2 mapped street and rail crossings.
  • Named streams inside the boundary: East Drain, Río Grande, Anthony Drain and Texas Lateral.
  • Public water: Town of Anthony, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near East Drain in Anthony?

Anthony is 677 road miles from our Yukon, Oklahoma main office, and we staff the work with our own crews and vetted partner contractor crews. The Census Bureau Vintage 2024 estimate puts this El Paso County town at 4,542 people. Near P N G Pipeline Road or Doniphan Drive, we install water, sewer, gas, electric conduit and fiber by directional boring where the route needs an underground crossing.

Our main office is in Yukon, Oklahoma, and Anthony work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A short 3/4 inch service line or a larger 48 inch casing near East Drain fits our equipment range. The family business dates to 1965, and our directional boring work dates to 1982, experience we bring to planning Anthony routes.

Aerial view of Trinity Boring Solutions crew and service van at a multifamily apartment underground utility jobsite in Oklahoma City
Our crew and service van at a multifamily underground utility job in Oklahoma City, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Bluepoint soil mean for a bore in Anthony?

The USDA soil survey maps Bluepoint soil across 26 percent of Anthony, with Delnorte association covering another 23 percent. At about 40 inches below the surface, the mapped texture in the Bluepoint area is stratified sand to loamy fine sand to very fine sandy loam. The survey maps 40 percent of the town as sandy at that depth and gives an average clay content of 13 percent. These are mapped soil patterns, so the actual material along a bore route still needs to be checked as work is planned.

USDA soil survey, inside the Anthony city limitsWhat is mapped
Soil series mappedBluepoint 26 percent, Delnorte 23 percent, Pajarito 12 percent, Glendale 11 percent and Agustin 8 percent
Texture at the surfaceloamy fine sand 27 percent, very gravelly loam 23 percent and fine sandy loam 17 percent
Texture about 40 inches downstratified sand to loamy fine sand to very fine sandy loam 26 percent, extremely gravelly fine sand 23 percent and fine sandy loam 12 percent
Engineering class about 40 inches downclayey gravel (GC) 23 percent, silty sand (SM) 14 percent and clayey sand (SC) 12 percent
Average clay content about 40 inches down13 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel44 percent of the area

For a Bluepoint route, the USDA soil survey has no bedrock mapped in the top five feet, which does not rule out deeper rock. Seasonal water tables and flood prone soils are not mapped in Anthony, though East Drain still calls for attention to the channel route. High steel corrosion risk is mapped across 44 percent of the area, so the line owner should consider casing and tracer wire materials. The geologic map identifies Holocene sand sheet deposits, a permeable ground type where fluid and staged reaming help support the bore.

How do crews bore through Bluepoint soil in Anthony?

Bluepoint soil and the mapped sandy ground around Anthony can loosen behind the drill head. We plan fluid use and reaming around the route, then track the bore as it advances near East Drain, streets and existing lines.

  1. In Bluepoint soil and sandy ground, we use drilling fluid to support the open path and ream in stages so loose material is less likely to fall behind the bit.
  2. Near gravelly mapped ground on a route off Levee Road, we check depth and pitch with each drill rod to keep the head on the planned line.
  3. At a crossing near the Town of Anthony water system or electric lines reported by El Paso Electric and Rio Grande Electric Cooperative, we hydrovac expose marked utilities before drilling nearby.
  4. For a bore near East Drain, we plan the channel depth and set pits on the dirt sides; a walkover locator tracks the head while depth and pitch are logged.
Bobcat E35 mini excavator lowering a 6 inch PVC sleeve into a bore pit in sandy soil at NE 24th Street in northeast Oklahoma City
Lowering a 6 inch PVC sleeve into a bore pit in sandy soil at NE 24th Street in Oklahoma City.

What does a bore have to cross near Interstate 10 in Anthony?

Interstate 10, US 180 and US 85 each have 3.6 mapped roadway miles inside Anthony. Texas State Highway 20 has 1.7 miles, and FM 1905 has 0.6 miles. P N G Pipeline Road runs 1.61 miles in town, while La Tuna Fed Correctional Institute runs 2.74 miles and Levee Road runs 2.59 miles. These routes make the proposed alignment matter: a bore near a highway, driveway or long local street needs pits placed clear of the crossing and a route that avoids cutting the surface.

CrossingTypeMapped extentWho has a say
Interstate 10Interstate3.6 roadway miles insideState highway office
US 180US highway3.6 roadway miles insideState highway office
US 85US highway3.6 roadway miles insideState highway office
Texas State Highway 20State highway1.7 roadway miles insideState highway office
FM 1905State highway0.6 roadway miles insideState highway office
BNSF RailwayRailroad2.7 track miles insideThe railroad
East DrainStream1.76 channel miles insideChecked for Corps of Engineers jurisdiction
Río GrandeStream1.46 channel miles insideChecked for Corps of Engineers jurisdiction
Anthony DrainStream1.29 channel miles insideChecked for Corps of Engineers jurisdiction
Texas LateralStream1.24 channel miles insideChecked for Corps of Engineers jurisdiction
Detention FM LateralStream0.65 channel miles insideChecked for Corps of Engineers jurisdiction
3 Saints LateralStream0.53 channel miles insideChecked for Corps of Engineers jurisdiction
Anthony WashStream0.17 channel miles insideChecked for Corps of Engineers jurisdiction
Vinton DrainStream nearby0.1 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

BNSF Railway owns 2.7 track miles in Anthony, and public records map 2 street and rail crossings in town. The rail owner sets the conditions for a track crossing, so the alignment and casing need to be coordinated before drilling. East Drain has 1.76 channel miles here, and 7 mapped street crossings of named streams make drainage routes part of planning. Rainbow Lake covers 17 acres inside town limits, another water feature to consider when laying out a bore.

Who has to sign off on a bore in El Paso County in Anthony?

For a crossing under Interstate 10 in Anthony, cover depth affects the bore profile: electric and communication lines need 60 inches below the lowest crossed grade, water needs 60 inches, and pressurized sewer needs 60 inches. Along highway right of way, the listed cover is 48 inches for electric and communication and 36 inches for water. The TxDOT El Paso District reviews utility permits for state highway right of way. The utility owner files through RULIS, with Trinity supplying the bore plan and profile. Anthony is incorporated, so city streets belong to the town. A BNSF Railway track crossing needs an agreement with the railroad, and East Drain is checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines near the Town of Anthony water system?

The Town of Anthony public water system uses groundwater wells and reports 1,454 service connections serving 5,555 people. That network can affect a bore near P N G Pipeline Road, so marked lines need to be exposed before the drill approaches. El Paso Electric and Rio Grande Electric Cooperative report electric service in El Paso County. We confirm the owner for the specific route before planning an electric conduit bore near the Town of Anthony system.

Line ownerWhat it isSourceSize
Town of AnthonyPublic water systemGroundwater wells1,454 connections, 5,555 people served
El Paso Electric and Rio Grande Electric CooperativeElectric utilities reporting service in El Paso CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

We keep Anthony’s 1999 median housing year in view as local context for underground planning, as reported by the American Community Survey 2019 to 2023 five year estimates. The estimates show 12 percent of homes built before 1960, 39 percent from 1960 to 1999 and 49 percent in 2000 or later. A route near Doniphan Drive may serve a newer connection or replace older pipe, and the age alone does not show what is underground. We hydrovac expose each marked utility on the bore path before drilling near it, since paint shows position but not depth.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

Where is Anthony in relation to Westway and El Paso?

Anthony is an incorporated town in El Paso County, at an elevation of 3,828 feet and with 6.39 square miles of land. Its ZIP code is 79821. Vinton is 1.9 miles south, Westway is 2.3 miles southeast, and Canutillo is 4.7 miles south. El Paso, the county seat and nearest larger city, is 13.7 miles southeast. From our Yukon, Oklahoma main office, Anthony is 677 road miles away, a 13.8 hour drive. That distance is part of planning crew and equipment mobilization for a bore near Interstate 10.

Places near Anthony

Which jobs call for a bore near P N G Pipeline Road in Anthony?

  • Highway crossing: A route under Interstate 10 uses a bore path that clears the travel lanes without cutting through existing pavement.
  • Water service: A connection near P N G Pipeline Road can be routed underground toward the Town of Anthony groundwater system.
  • Fiber route: A conduit bore along Doniphan Drive can pass beneath pavement and driveways without an open cut.
  • Drain crossing: An East Drain bore needs a planned path beneath the channel, with the route checked during planning for Corps jurisdiction.
  • Rail crossing: A bore beneath BNSF Railway track needs coordination with the track owner on crossing conditions before the alignment is set.
  • Utility conduit: Near La Tuna Fed Correctional Institute, marked lines along the route are exposed before a new electric conduit bore approaches.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of an Anthony bore near La Tuna Fed Correctional Institute?

For a quote near La Tuna Fed Correctional Institute, start with the address or a map pin so we can place the route. Tell us what goes underground, such as water or fiber, then give the pipe or conduit size and the footage. A sketch or plans help show whether the bore approaches Interstate 10, East Drain or a marked street crossing.

The Bluepoint sand and gravel conditions and any East Drain crossing lead the estimate because ground support and drainage affect the bore plan. Pipe size and total length also shape the equipment and reaming needed. The number of utilities to expose, pavement near Interstate 10, pit access, excavator time and sand backfill all change the scope. Mobilization matters too: Anthony is 677 road miles from our Yukon yard. In Anthony, we plan for added demands when high profile or emergency work affects the boring schedule.

Questions people ask about boring in Anthony

Does Trinity Boring Solutions take jobs in Anthony, El Paso County, and how are crews assigned?

Yes. We take directional boring work across Texas, including Anthony in El Paso County. Our own crews and partner contractor crews that Trinity has vetted staff the work, while you deal with Trinity through the bore log. A route near Interstate 10 is reviewed for its specific access, crossings and ground before the crew plan is set.

Will a bore in Anthony hit rock below Bluepoint soil?

Rock is not mapped in Anthony’s top five feet, but that does not settle what may lie deeper along a particular route. The geologic map shows Holocene sand sheet deposits, while the soil survey maps Bluepoint and gravelly areas. We plan for the mapped ground and check the bore conditions as the route advances near P N G Pipeline Road or other local features.

Who approves a bore under Interstate 10 in Anthony?

TxDOT handles the utility permit for Interstate 10 right of way, with review by the TxDOT El Paso District. The utility owner submits the application through RULIS, and we prepare the bore plan and profile for that filing. The required cover depends on line type and the crossing profile, so the utility owner’s permit establishes the approved arrangement.

What do we need to plan for when boring beneath BNSF Railway in Anthony?

A crossing beneath BNSF Railway track needs an agreement with the railroad that owns it. That agreement establishes crossing conditions such as casing, depth and flagging. Public records map 2.7 track miles in Anthony, so the proposed route must be matched to the actual track location and coordinated before the bore is planned.

Can a line be bored under East Drain in Anthony?

A bore can be planned beneath East Drain, but the route needs a channel crossing plan. East Drain has 1.76 channel miles in Anthony, and water crossings are checked during planning for U.S. Army Corps of Engineers jurisdiction. We set the bore path to pass below the channel and place the entry and exit pits on the banks.

Who operates Anthony’s public water system, and what source supplies it for our underground work planning?

The Town of Anthony owns the public water system, and its source is groundwater wells. We consider Anthony’s public records showing 1,454 service connections and 5,555 people served when planning underground work near the public water system. If a bore near P N G Pipeline Road approaches a water line, we need the marked route exposed before drilling close to it.

Can I reach Trinity after hours about an urgent bore near P N G Pipeline Road in Anthony?

Yes. A person answers our phone 24 hours a day at (405) 409-7423 for urgent work near P N G Pipeline Road or elsewhere in Anthony. We can discuss the location, the line involved and any nearby crossings, then determine what information is needed to plan the response.

How much notice does Texas811 need for a bore near La Tuna Fed Correctional Institute in Anthony?

For a bore near La Tuna Fed Correctional Institute, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. When an Anthony start moves more than 14 days past the original notice, we submit a new request through Texas811 before boring. Before work resumes in Anthony, we have worn or moved marks refreshed through Texas811 so the bore follows current marks.

What affects the cost of a directional bore under Interstate 10 in Anthony?

Ground and crossings are major factors: Bluepoint sand and gravel can affect bore support, while Interstate 10 adds highway alignment and access needs. Pipe size and length, utilities to expose, pavement, pits, excavator time and backfill also affect the job. Mobilization from Yukon matters because Anthony is 677 road miles from our main office.

Where the Anthony facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Anthony

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Anthony, Texas

Type the address of your job in Anthony. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Anthony

Same county: Socorro · Horizon City · San Elizario · Fort Bliss · Fabens · Homestead Meadows South · Homestead Meadows North · Sparks · Agua Dulce · Tornillo · Clint · Morning Glory. All counties: Texas county list.