Hays Texas Directional Boring: Rumple Soil, FM 1626 and Garlic Creek
Quick Answer: Can a line pass beneath FM 1626 without cutting its pavement? We can use directional boring, also called horizontal directional drilling (HDD), for that Hays route when access and design fit. McKinnon Loop and Live Oak Lane are local streets where a bore can avoid cutting pavement, with pits set at each end. Our Yukon, Oklahoma main office is 416 road miles from Hays, and Buda is 3.0 miles south. Rumple soil covers 47 percent of the mapped area, and shallow bedrock can affect the drill path.
Hays bores at a glance
- Incorporated city in Hays County, Texas. Population 264 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 416 miles, about 8 hours of driving.
- Ground: Rumple soil is mapped on 47 percent of the area, with bedrock about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 74 percent of the area.
- Highways inside the boundary: FM 1626. State permit office: TxDOT Austin District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Hays, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring on McKinnon Loop in Hays?
Can you route water, sewer, gas, electric conduit or fiber beneath McKinnon Loop without opening the pavement? We take directional boring work in Hays County, where the Census Bureau Vintage 2024 estimate puts the population at 264. Those lines can run beneath McKinnon Loop or toward service points along Live Oak Lane; the route depends on access and marked utilities.
Our main office is in Yukon, Oklahoma, and Hays work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business started 1965 and have done directional boring since 1982. With the City of Hays groundwater system and electric service reported in Hays County, our record of no utility strike in over 25 years reflects the care buried lines require.

What kind of ground does Hays have around Rumple soil?
The USDA soil survey maps Rumple soil across 47 percent of Hays, with Medlin at 26 percent, Tarpley at 12 percent, Real at 7 percent and Comfort at 6 percent. Near the surface, very gravelly clay loam covers 47 percent and clay covers 40 percent. At about 40 inches, the survey maps bedrock under 74 percent of the area and clay under 26 percent; sandy texture is not mapped there. We treat mapped Rumple and Medlin soil patterns in Hays County as references, not test borings. Gravelly clay loam can bring sticky cuttings, while clay can hold an open hole and grip the pipe.
| USDA soil survey, inside the Hays city limits | What is mapped |
|---|---|
| Soil series mapped | Rumple 47 percent, Medlin 26 percent, Tarpley 12 percent, Real 7 percent and Comfort 6 percent |
| Texture at the surface | very gravelly clay loam 47 percent, clay 40 percent and gravelly loam 7 percent |
| Texture about 40 inches down | bedrock 74 percent and clay 26 percent |
| Engineering class about 40 inches down | fat clay (CH) 26 percent |
| Average clay content about 40 inches down | 50 percent |
| Bedrock mapped within 60 inches | 74 percent of the area (66 percent hard rock, 7 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 93 percent of the area |
The USDA soil survey puts typical bedrock depth at 23 inches and maps bedrock within 60 inches across 74 percent of Hays; hard bedrock accounts for 66 percent and weathered bedrock for 7 percent. A rock bit or slower drilling may be needed, especially where soil meets rock. Near Garlic Creek, we recognize seasonal water table and flood prone soils are not mapped and verify conditions before boring. High steel corrosion risk is mapped across 93 percent, so the line owner should consider steel casing and tracer wire materials; HDPE avoids that concern. The map also shows alluvial clay, silt, sand and gravel of Pleistocene age, with Del Rio Clay and Georgetown Limestone of Cretaceous age.
What does it take to bore through Hays bedrock?
Rumple soil and shallow mapped bedrock call for a plan that can shift from clay to rock. Along FM 1626 or a local street, we track the drill and adjust the tooling to the ground.
- Rumple soil includes very gravelly clay loam, so we manage sticky cuttings and use staged reaming when the ground calls for it.
- With bedrock mapped at about 23 inches typically, we check the drill path as it enters rock and choose tooling for the conditions.
- Before drilling near a marked line on Live Oak Lane, we use hydrovac potholing to expose it; surface paint does not show depth.
- We track the drill head from the surface and log depth and pitch, which helps control alignment beneath FM 1626.

Which roads, tracks or creeks can a Hays bore cross near FM 1626?
FM 1626 runs for 1.2 mapped roadway miles inside Hays, and Texas State Highway 45 lies 0.5 miles outside the city limits. A route beneath FM 1626 needs room for entry and exit pits as well as the required highway cover. Among the named local streets, McKinnon Loop extends 0.39 miles, Live Oak Lane 0.37 miles and Red Bud Trail 0.36 miles. A bore can keep those street surfaces intact, but the route still has to clear marked utilities and fit the available access.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 1626 | State highway | 1.2 roadway miles inside | State highway office |
| Texas State Highway 45 | Highway nearby | 0.5 miles outside | State highway office |
| Garlic Creek | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
| Little Bear Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad or railroad crossing is mapped inside Hays or within 1 mile outside its limits, so there is no mapped track route to plan around. No named stream runs inside the city, and no street crossing of a named stream is mapped there. Garlic Creek is 0.3 miles from the limits and Little Bear Creek is 0.6 miles away. A planned creek crossing near either channel needs a check for U.S. Army Corps of Engineers jurisdiction; no lake or pond is mapped within 1 mile.
Who approves a Hays bore near Hays County roads?
For a utility crossing of FM 1626, TxDOT cover rules set a 60 inch minimum below the lowest crossed grade for electric, communication and water lines, as well as pressurized sewer. Along highway right of way, the listed minimums differ by line type, and the permit can set another depth. The line owner files the utility permit through TxDOT’s online RULIS system, with the TxDOT Austin District reviewing it; we prepare the bore plan and profile for that filing. Hays is incorporated, so city streets such as McKinnon Loop belong to the city. A crossing near Garlic Creek is checked for federal water jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities are near the City of Hays water system?
The City of Hays public water system uses groundwater wells and lists 90 service connections serving 270 people. That makes water service a local part of planning a bore beneath McKinnon Loop or another street. Utilities reporting electric service in Hays County include the City of San Marcos, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative. We confirm the line owner for the specific route before planning an electric conduit bore, rather than assuming one provider serves every Hays address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Hays | Public water system | Groundwater wells | 90 connections, 270 people served |
| City of San Marcos, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative | Electric utilities reporting service in Hays County | EIA Form 861 | Confirm the line owner by address |
American Community Survey 2019 to 2023 five year estimates put Hays’s median housing year at 1970; 7 percent of homes were built before 1960, 83 percent from 1960 to 1999 and 10 percent in 2000 or later. A replacement route along Live Oak Lane may need to account for existing service lines as well as new connections. Along McKinnon Loop, we hydrovac pothole every marked utility on the bore path before drilling near it. Paint by Live Oak Lane shows a line’s position, not its depth.

Do you cover Hays and nearby Buda?
Hays is an incorporated city in Hays County, at an elevation of 729 feet and covering 0.22 square miles. Its ZIP code is 78610. Manchaca is 2.3 miles northeast, Buda is 3.0 miles south, Shady Hollow is 3.0 miles north and San Leanna is 3.5 miles northeast. Buda, the nearest larger city, is 3.0 miles south; San Marcos, the county seat, is 17.6 miles south. From our Yukon yard, the road distance is 416 miles and the drive is 8.0 hours, which can affect mobilization for work near FM 1626.
Places near Hays
- Directional boring in Manchaca: 2.3 miles northeast
- Directional boring in Buda: 3 miles south
- Directional boring in Shady Hollow: 3 miles north
- San Leanna: 3.5 miles northeast
- Directional boring in Mountain City: 5.8 miles south
What would we bore near Live Oak Lane in Hays?
- Highway crossing: A route beneath FM 1626 needs highway cover, a bore plan and pits placed clear of the travel surface.
- Water service: A line near the City of Hays groundwater system may need a bore beneath McKinnon Loop to reach its connection.
- Fiber conduit: A run along Live Oak Lane can pass below pavement while keeping the street surface uncut.
- Creek crossing: A route near Garlic Creek needs a planned path and a check for U.S. Army Corps of Engineers jurisdiction.
- Street service: A bore beneath Red Bud Trail can connect a property without trenching across the paved route.
- Rock bore: Shallow bedrock mapped around Hays can affect a crossing near FM 1626 and the tooling selected for it.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a Hays bore near Garlic Creek?
Send an address or map pin first; the exact spot matters for a route near Garlic Creek or FM 1626. For FM 1626 work, we include the material going in the ground, pipe or conduit size, and footage in the request. A sketch or plans help us see access, proposed pits and nearby crossings around Hays streets.
A short route with open access and few marked utilities is simpler to plan than a bore with several obstacles. In Hays, Rumple soil and shallow bedrock can change tooling and reaming; crossings of FM 1626 add permit and cover planning. We also account for pipe size, length, pavement or concrete, exposed utilities, creek or drainage crossings, pits, excavator time and sand backfill. The 416 road miles from Yukon can affect mobilization, as can emergency timing or a high profile route.
Questions people ask about boring in Hays
Does Trinity Boring Solutions take work in Hays County, and who staffs it?
Yes, we take directional boring work in Hays County. Our own crews and partner drilling contractors from satellite yards we have vetted can staff the work, while you deal with Trinity from the first call through the bore log. For a route near McKinnon Loop, we plan around the specific access and marked utilities.
Who is responsible for Red Bud Trail in Hays, and can a bore avoid cutting it?
Hays is incorporated, so its city streets, including Red Bud Trail, belong to the city itself. Directional boring can pass a line beneath the street without cutting the pavement when the route, access and ground allow. We plan entry and exit pits and check marked utilities along the proposed path.
What does Hays housing age near Live Oak Lane mean for a replacement bore?
The American Community Survey 2019 to 2023 estimates give Hays a median housing year of 1970, with 83 percent of homes built from 1960 to 1999. A replacement bore near Live Oak Lane may need to pass existing lines as well as serve a new connection. Near Little Bear Creek, we expose marked utilities before drilling close to them to keep the bore path clear.
Can Hays Rumple soil corrode steel, and what pipe should I choose?
The USDA soil survey maps high steel corrosion risk across 93 percent of Hays, including areas mapped as Rumple soil. The line owner should weigh that risk when choosing steel casing or tracer wire materials and coatings. HDPE is not affected by soil corrosion, but the right pipe depends on the line and project.
What ground should I expect for a bore through Rumple soil in Hays?
Rumple soil covers 47 percent of Hays, and the mapped surface texture there is very gravelly clay loam. At about 40 inches, bedrock is mapped under 74 percent of the area and clay under 26 percent. The USDA soil survey shows patterns rather than site borings, so the route may need to account for sticky soil and shallow rock.
Is there bedrock beneath Hays, and how much is mapped within five feet?
The USDA soil survey maps bedrock within 60 inches across 74 percent of Hays. Hard bedrock is mapped under 66 percent of the area and weathered bedrock under 7 percent. With typical bedrock depth at 23 inches, a bore may need rock tooling or a slower approach as the drill moves from soil into rock.
Will Trinity take a Hays job near Manchaca or other rural sites?
We take work in Hays and across Texas, including nearby Manchaca, which is 2.3 miles northeast of the city. Buda is 3.0 miles south, and rural routes outside Hays can also be discussed. Access, the proposed line and distance from our Yukon office all factor into planning.
How much Texas811 notice should I give for a Hays bore on McKinnon Loop?
Count back at least 48 hours, excluding Saturdays, Sundays and legal holidays, from a planned start near McKinnon Loop; the request cannot be made more than 14 days ahead. For Hays County work, if the start slips more than 14 days past the original notice, we make a new request. On work near Buda, we have worn or moved marks refreshed through Texas811 before work continues.
What affects the cost of a Hays directional bore near FM 1626?
The route and work scope drive the price, not just the length. Near FM 1626, highway permitting and cover can add planning, while Rumple soil and shallow bedrock can affect drilling time. Pipe size, utility crossings, pavement, creek or drainage routes, pits, excavator time, backfill and mobilization from Yukon also matter.
Where the Hays facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Hays
- U.S. Census Bureau, TIGER/Line 2024: Hays boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Hays
- U.S. Census Bureau, American Community Survey 2019 to 2023: Hays housing units and year built
- Macrostrat geologic map compilation: map units under Hays
- U.S. EPA Safe Drinking Water Information System: public water systems serving Hays
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Hays County
- U.S. Geological Survey, Elevation Point Query Service: Hays elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Hays
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Hays
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Hays, Texas
Type the address of your job in Hays. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Hays
Same county: San Marcos · Kyle · Dripping Springs · Wimberley · Woodcreek · Uhland · Austin · Niederwald · Bear Creek · Driftwood · Creedmoor · Belterra. All counties: Texas county list.