Ackerly Texas Directional Boring: Acuff Sandy Clay Loam, US 87 and Avenue A
Quick Answer: At Avenue A, the USDA soil survey maps sandy clay loam through the top five feet; we take directional boring, also called horizontal directional drilling (HDD), for Ackerly crossings. The Yukon yard is 411 road miles away, and US 87 is one of the local routes to plan around. Acuff soil covers 86 percent of the mapped area, so clay in the bore path calls for controlled fluid and staged reaming. Lamesa is 20.0 miles northwest.
Ackerly bores at a glance
- Incorporated city in Martin County and Dawson County, Texas. Population 261 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 411 miles, about 8.1 hours of driving.
- Ground: Acuff soil is mapped on 86 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 87, FM 2212 and FM 2002. State permit office: TxDOT Odessa District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Ackerly, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Avenue A in Ackerly?
We take Ackerly directional boring calls for routes such as Avenue A and FM 2212, where the USDA soil survey maps sandy clay loam in the top five feet. The Census Bureau Vintage 2024 estimate puts the city population at 261 across Martin and Dawson Counties. Our crews can place water, sewer, gas, electric conduit and fiber along Ackerly streets or beneath US 87.
Our main office is in Yukon, Oklahoma, and Ackerly work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore, roughly 4,100 feet of 48 inch casing beneath the Arkansas River in Tulsa, shows our reach; by comparison, an Avenue A service bore is a short local run. We are a family business started 1965, and we have done directional boring since 1982.

What kind of ground does Acuff soil mean for a bore in Ackerly?
The USDA soil survey maps Acuff sandy clay loam across 86 percent of Ackerly and Amarillo fine sandy loam across 14 percent. About 40 inches below the surface, the mapped texture is sandy clay loam throughout the city, with an average clay content of 27 percent. These are mapped soil patterns, not test borings along Avenue A or FM 2002. Clay can cling to a reamer and grip pipe, so the actual bore plan should account for soil conditions along the chosen route.
| USDA soil survey, inside the Ackerly city limits | What is mapped |
|---|---|
| Soil series mapped | Acuff 86 percent and Amarillo 14 percent |
| Texture at the surface | sandy clay loam 86 percent and fine sandy loam 14 percent |
| Texture about 40 inches down | sandy clay loam 100 percent |
| Engineering class about 40 inches down | lean clay (CL) 100 percent |
| Average clay content about 40 inches down | 27 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 0 percent of the area |
Bedrock is not mapped in the top five feet of Ackerly, and the survey maps no seasonal water table or flood prone soils in that depth range. It also maps no high steel corrosion risk. The geologic map shows the Cenozoic Blackwater Draw Formation, described as sand, silt and locally clayey material, and Paleocene Cenozoic sedimentary rocks. Those map units do not replace route specific checks; if clay sticks to the reamer, staged passes and a same day pull can help keep the bore moving.
What does it take to bore Ackerly sandy clay loam?
Avenue A and the Acuff soil map point to a clay bearing bore path, so we plan fluid, reaming and pipe handling around the ground at the actual crossing.
- Acuff soil carries clay, so we choose drilling fluid and reamer stages to limit sticky cuttings along a route such as Avenue A.
- We expose each marked utility with hydrovac potholing before the drill approaches it, especially where older services may run near 6th Street.
- A walkover locator follows the drill head while we record depth and pitch, keeping the bore path controlled beneath FM 2212.
- With pipe ready before the final ream, we can pull it through the opened hole without leaving the clayey ground near FM 2002 waiting.

Which roads, tracks or creeks might a bore cross near Avenue A in Ackerly?
Ackerly has US 87, FM 2212 and FM 2002 within its limits, so a route crossing one of those highways needs highway planning. Avenue A is the longest named street at 0.72 miles in the city; Avenue C and Avenue D each run 0.52 miles, while 6th Street runs 0.51 miles. These street lengths help identify a route, but a site plan must show the actual crossing and any pavement or driveway in its path.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 87 | US highway | 0.1 roadway miles inside | State highway office |
| FM 2212 | State highway | 0.7 roadway miles inside | State highway office |
| FM 2002 | State highway | 0.6 roadway miles inside | State highway office |
No railroad is mapped inside Ackerly or within one mile outside its limits, so the mapped local route has no track crossing to plan around. No named stream, drainage channel or lake or pond is mapped in or within one mile of the city, and no street crossing of a named stream is mapped. For a bore near Avenue A, that leaves the specific road, utilities and access as the main crossing details to verify.
Who has to sign off on a bore under US 87 in Ackerly?
For work on US 87, FM 2212 or FM 2002 right of way in Ackerly, the utility owner submits the permit application through TxDOT’s online RULIS system, not the drilling contractor. TxDOT’s Odessa District reviews it, and we prepare the bore plan and profile for the owner’s application. TxDOT rules call for boring or tunneling beneath existing highway pavement, with crossings encased and rural highway bores extending beneath all travel lanes. Required cover depends on the line: for example, electric and communication lines need 60 inches at crossings and 48 inches along the right of way.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried in Martin County and Ackerly?
In Martin County, we plan underground work around the City of Ackerly’s public water system, which uses groundwater wells and serves 245 people through 148 service connections. That system is one reason a proposed service near Avenue A should be checked against existing lines before drilling. Oncor Electric Delivery Company and Lyntegar Electric Cooperative report electric service in Martin County; the line owner at a particular Ackerly address must be confirmed before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Ackerly | Public water system | Groundwater wells | 148 connections, 245 people served |
| Oncor Electric Delivery Company and Lyntegar Electric Cooperative | Electric utilities reporting service in Martin County and Dawson County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Ackerly’s median housing year at 1983; 14 percent of homes were built before 1960, 53 percent from 1960 to 1999 and 33 percent in 2000 or later. A replacement route near Avenue C may need to work around older buried service, while a newer connection can have a different route. We use hydrovac potholing to expose marked utilities before the drill approaches; paint shows location, not depth.

Where is Ackerly in relation to Lamesa and our Yukon yard?
Ackerly spans Martin and Dawson Counties in West Texas, with 51 percent of its area in Martin County and 49 percent in Dawson County. The incorporated city covers 0.31 square miles, sits at 2,798 feet elevation and uses ZIP code 79713. Lamesa, the nearest larger city, is 20.0 miles northwest; Los Ybanez is 17.8 miles northwest. Stanton, the Martin County seat, is 27.5 miles south. The Yukon yard is 411 road miles away, an 8.1 hour drive, which affects mobilization for work near FM 2212.
Places near Ackerly
- Directional boring in Los Ybanez: 17.8 miles northwest
- Directional boring in Lamesa: 20 miles northwest
- Directional boring in Gail: 22.6 miles northeast
- Directional boring in Big Spring: 23.9 miles southeast
- Directional boring in Sand Springs: 27.4 miles southeast
What kinds of bores come up near Avenue D in Ackerly?
- Highway crossing: A bore beneath US 87 keeps the line below the roadway, with the permit plan covering the crossing and its pavement.
- Water service: A new connection near Avenue A can be planned around the City of Ackerly groundwater system and marked existing lines.
- Fiber route: Fiber conduit along Avenue C can pass below pavement and driveways rather than opening a trench across each surface.
- Electric conduit: For a route near FM 2212, we confirm the line owner before planning a conduit bore.
- Replacement line: A service replacement near 6th Street can use potholing to locate existing utilities before the bore advances.
- Farm and acreage service: A longer run outside Ackerly can be scoped from a map pin and tied to a route such as FM 2002.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a bore near 6th Street in Ackerly?
For a quote in Ackerly, send the street address or map pin, what will go in the ground, the pipe or conduit size and the footage; a sketch or plan helps. For a route near 6th Street, show pavement, driveways and nearby marked utilities so we can shape the bore plan to the actual path.
The main price driver near Avenue A is the ground: Acuff sandy clay loam can affect fluid use and reaming. The route length and pipe or conduit size matter too, along with how many utilities must be crossed and exposed. Pavement on US 87, pits, excavator time and sand backfill can add work. A creek or drainage crossing is not mapped in the city, but any specific route detail still needs review. With 411 road miles from Yukon, we plan mobilization timing for Ackerly boring work accordingly.
Questions people ask about boring in Ackerly
Does Trinity take directional boring work in Martin County near Ackerly, and how is it staffed?
Yes. We take directional boring work in Ackerly and across Texas, including routes in Martin County. Our own crews and partner contractor crews we have vetted can handle the work, while you deal with Trinity from the first call through the bore log. A proposed Avenue A crossing still needs its route and utilities checked.
What do Ackerly homes near Avenue C mean for replacement bores?
Ackerly’s housing age points to both replacement and new service work, not one uniform condition along Avenue C. The American Community Survey 2019 to 2023 estimates give a median build year of 1983, with homes spread across older, mid period and newer construction. We pothole marked lines before drilling near them because the marks show position, not depth.
What ground does an Ackerly bore cross in Acuff soil?
The USDA soil survey maps Acuff sandy clay loam across 86 percent of Ackerly, and sandy clay loam at about 40 inches below the surface. The mapped average clay content there is 27 percent. That clay can build up on a reamer, so we plan staged reaming and fluid for a route such as FM 2002.
Will an Ackerly bore hit rock?
Bedrock is not mapped in Ackerly’s top five feet, but that does not rule out rock deeper down. The geologic map shows the Cenozoic Blackwater Draw Formation and Paleocene Cenozoic sedimentary rocks. A proposed bore near Avenue D still needs its depth and ground conditions assessed along the actual route.
Who approves an Ackerly bore under US 87?
The utility owner applies for work in US 87 right of way through TxDOT’s RULIS system, and the TxDOT Odessa District reviews the application. For a filing with TxDOT Odessa District, we provide the bore plan and profile for the US 87 crossing. A crossing near FM 2212 also needs to account for the highway permit’s cover and pavement requirements.
Along US 87 in Martin County, who owns Ackerly’s public water system, and does it draw from groundwater wells?
Given the Acuff soil series listed for Ackerly, we plan underground work around its public water system, owned by the City and sourced from groundwater wells. For underground work on Avenue C, we account for Ackerly’s public records listing 148 service connections and 245 people served. That system is relevant to a proposed water service near Avenue A, where the exact line route should be checked before a bore.
Does Trinity cover Ackerly, Los Ybanez and rural sites outside city limits?
Yes. We take work across Texas, including Ackerly, nearby Los Ybanez and rural routes outside the city limits. A job near FM 2002 can be scoped from its location, line type, size and footage. For highway right of way, the line owner handles the permit application with TxDOT.
How much notice does Texas811 need for an Ackerly bore near Avenue A?
For a bore near Avenue A, submit the Texas811 locate request at least 48 hours before excavation, not counting Saturdays, Sundays or legal holidays, and no earlier than 14 days ahead. If work near FM 2002 starts more than 14 days after the original notice, we submit a new request. Worn or moved marks need refreshing through Texas811 before work continues.
What affects the cost of directional boring near US 87 in Ackerly?
The price depends on the route and scope near US 87, with Acuff clay, bore length and pipe size among the key factors. Utility crossings that need exposure, pavement, pits and equipment time also affect the work. The 411 road miles from Yukon affect mobilization, and a highway crossing needs its own permit planning.
Where the Ackerly facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Ackerly
- U.S. Census Bureau, TIGER/Line 2024: Ackerly boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Ackerly
- U.S. Census Bureau, American Community Survey 2019 to 2023: Ackerly housing units and year built
- Macrostrat geologic map compilation: map units under Ackerly
- U.S. EPA Safe Drinking Water Information System: public water systems serving Ackerly
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Martin County and Dawson County
- U.S. Geological Survey, Elevation Point Query Service: Ackerly elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Ackerly
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Ackerly
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Ackerly, Texas
Type the address of your job in Ackerly. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Ackerly
County: Dawson County directional boring. Same county: Welch · O'Donnell · Stanton. All counties: Texas county list.
