Cedar Point Texas Directional Boring: Choates Loamy Fine Sand, US 190 and Caney Creek
Quick Answer: The USDA soil survey maps Choates loamy fine sand near the surface in Cedar Point, with sandy clay loam common at about 40 inches. Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), for routes crossing US 190. Cedar Point is 423 road miles from the Yukon yard, which matters for mobilization to a job near Cedar Point Drive. Sandy clay loam can hold a bore differently than surface sand, so the route and depth shape the drilling plan.
Cedar Point bores at a glance
- Unincorporated community in Polk County, Texas. Population 851 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 423 miles, about 8.2 hours of driving.
- Ground: Choates soil is mapped on 15 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 190. State permit office: TxDOT Lufkin District.
- Railroad track inside the boundary: none mapped.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near US 190 in Cedar Point?
Trinity Boring Solutions takes directional boring work in Cedar Point, Polk County, including routes along US 190. The top five feet vary by mapped soil, with Choates loamy fine sand near the surface and sandy clay loam at about 40 inches. The 2020 Census counted 851 residents; the Census Bureau does not publish yearly estimates for unincorporated places. Water, sewer, gas, electric conduit and fiber lines can run beneath Cedar Point Drive or other local routes.
Our main office is in Yukon, Oklahoma, and Cedar Point work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, with directional boring work dating to 1982. Our size range covers 3/4 inch service lines through 48 inch casing, useful for different utility routes near US 190.

What kind of ground does the USDA survey map in Cedar Point near Choates soil?
Choates loamy fine sand is mapped across 15 percent of Cedar Point, while Pinetucky fine sandy loam covers 12 percent and Belrose loamy fine sand covers 11 percent. These are shares of the mapped area, not results from test borings. At about 40 inches, the USDA soil survey maps sandy clay loam across 30 percent of the area, with average clay content of 26 percent. Surface textures include loamy fine sand across 26 percent and fine sandy loam across 22 percent. Sand can loosen behind a bit, while clay in the deeper mix can affect reaming and pullback.
| USDA soil survey, inside the Cedar Point mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Choates 15 percent, Pinetucky 12 percent, Belrose 11 percent, Woodville 8 percent and Bernaldo 3 percent |
| Texture at the surface | loamy fine sand 26 percent and fine sandy loam 22 percent |
| Texture about 40 inches down | sandy clay loam 30 percent, loamy very fine sand 11 percent and clay 8 percent |
| Engineering class about 40 inches down | clayey sand (SC) 30 percent, silty sand (SM) 11 percent and fat clay (CH) 8 percent |
| Average clay content about 40 inches down | 26 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 26 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 23 percent of the area |
Bedrock is not mapped in the top five feet of Cedar Point, though deeper rock is not ruled out. Seasonal water table conditions are mapped within 60 inches across 26 percent of the area, so pits may need pumping. Flood prone soils are not mapped. High steel corrosion risk is mapped across 23 percent, which makes casing and tracer wire material a line owner decision; HDPE does not have the same soil corrosion concern. The geologic map identifies the Miocene Fleming Formation, described as clay and sandstone, so deeper conditions may change along a bore.
How do we bore Cedar Point ground with sandy clay loam below?
At Cedar Point, sandy clay loam mapped at about 40 inches calls for a route plan that accounts for both clay and the loamier surface soils. We track the drill head and adjust the fluid and reaming to the ground we encounter.
- Where Choates loamy fine sand is mapped, we stage the reaming and keep the pipe ready so the hole is not left open longer than needed.
- At about 40 inches, sandy clay loam is mapped across 30 percent of the area; we adjust the fluid and reamer to the clay in that mix.
- Seasonal water table conditions are mapped within 60 inches across 26 percent of Cedar Point, so we keep pits small and pump standing water as needed.
- Near Caney Creek, we track the drill head from the surface and log depth and pitch to keep the planned route on line.

Which roads or creeks could a Cedar Point bore cross near Caney Creek?
US 190 runs 1.6 roadway miles inside Cedar Point’s mapped community boundary, so a route that crosses it needs to account for the highway right of way. Cedar Point Drive and Cedar Point are each mapped for 1.01 miles, and Plum Tree runs 0.94 miles. Those streets give local reference points for planning a bore route and its pits. Existing highway pavement is bored or tunneled beneath rather than cut, and the route is set to avoid disrupting the surface.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 190 | US highway | 1.6 roadway miles inside | State highway office |
| Caney Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Sandy Creek | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
| Livingston Reservoir | Lake or pond | 31,533 acres, inside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Cedar Point or within one mile outside its mapped boundary, and no street and rail crossings are mapped. Caney Creek runs along or touches the boundary, while Sandy Creek is 0.8 miles away. One mapped street crossing of a named stream is inside the community. Livingston Reservoir, a 31,533 acre lake, is inside the boundary, so a creek or lake route is checked for federal water jurisdiction during planning.
Who approves a bore near US 190 in Polk County and Cedar Point?
Cedar Point is an unincorporated community, so it has no city government; county roads and state highway rights of way are handled by the relevant county or state authority. For work in the US 190 right of way, the utility owner, not Trinity, files the TxDOT utility permit application through RULIS. Trinity prepares the bore plan and profile for that filing, and the TxDOT Lufkin District reviews it. At highway crossings, electric and communication lines need 60 inches of cover below the lowest crossed grade; water lines need the same, and pressurized sewer lines also need 60 inches. A Caney Creek or Livingston Reservoir crossing is checked for U.S. Army Corps of Engineers jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the buried utility lines at a Cedar Point address in Polk County?
The water provider for a specific Cedar Point address has to be confirmed with the city, county or local water district before a bore is planned. For electric service in Polk County, Entergy Texas and Sam Houston Electric Cooperative report service, but the line owner must be identified for the particular conduit route. On Cedar Point Drive, hydrovac potholing exposes marked utilities before the drill approaches; locate paint shows position, not depth.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Entergy Texas and Sam Houston Electric Cooperative | Electric utilities reporting service in Polk County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Cedar Point’s median housing year at 2001; 53 percent of homes were built in 2000 or later, and 47 percent from 1960 to 1999. A replacement bore along Cedar Point may follow older buried lines, while newer homes can call for service extensions. Before crossing any marked line, we use hydrovac potholing to verify its depth and location.

What places are near Cedar Point and Onalaska?
Cedar Point is in Polk County, covers 0.9 square miles and sits at an elevation of 146 feet, with ZIP code 77351. Onalaska is 2.5 miles northwest; West Livingston is 7.7 miles southeast. Livingston, the county seat, is 10.5 miles southeast and is also farther away than West Livingston. From the Yukon, Oklahoma yard, the drive to Cedar Point is 423 road miles and 8.2 hours. That distance is part of planning crew mobilization for work along US 190 or a local street.
Places near Cedar Point
- Directional boring in Onalaska: 2.5 miles northwest
- Directional boring in West Livingston: 7.7 miles southeast
- Directional boring in Point Blank: 8.8 miles southwest
- Directional boring in Livingston: 10.5 miles southeast
- Directional boring in Cape Royale: 10.7 miles south
Which jobs call for a bore near Cedar Point Drive in Cedar Point?
- Highway crossing: A utility route beneath US 190 is bored or tunneled under existing pavement, with right of way depth planned for the line type.
- Street service: A water or sewer bore along Cedar Point Drive can avoid an open cut across pavement and keep pits in the dirt.
- Fiber conduit: A fiber route along Cedar Point can pass beneath local streets, with marked utilities exposed before drilling near them.
- Creek crossing: A route near Caney Creek needs depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
- Reservoir route: A bore near Livingston Reservoir accounts for the lake crossing and the space needed for entry and exit pits.
- Electric conduit: A conduit route near US 190 starts with confirming the owner, since Entergy Texas and Sam Houston Electric Cooperative report county service.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send to price directional boring in Cedar Point?
For a Cedar Point quote, give us the address or map pin, what goes in the ground, the pipe or conduit size and the footage; a sketch or plans help. A route near Cedar Point Drive can be priced more accurately when we can see the street crossing and nearby marked utilities.
The job details determine the price, not footage alone. Cedar Point’s 423 road miles from Yukon affect mobilization, while Choates loamy fine sand and deeper sandy clay loam shape the drilling plan. The count of utilities to expose, pavement or concrete, and any creek or reservoir crossing also matter. Pit conditions, excavator time, sand backfill and high profile or emergency requirements can change the work scope.
Questions people ask about boring in Cedar Point
Does Trinity Boring Solutions take jobs in Cedar Point, Polk County, and who staffs them?
Yes, we take directional boring work in Cedar Point, with the same company contact from the first call through the bore log. Our own crews and crews from vetted partner drilling contractors handle the work. That service model applies to routes along US 190 as well as local streets such as Cedar Point Drive.
What do Cedar Point Drive and the home ages suggest about replacement bores in Cedar Point?
Cedar Point’s housing data points to both replacement work and newer service connections, not one uniform age for buried lines. The American Community Survey 2019 to 2023 estimates put the median year built at 2001, with 47 percent of homes dating from 1960 to 1999. A bore along Cedar Point Drive can replace a line or extend service, depending on the address.
Could groundwater or Caney Creek affect bore pits in Cedar Point?
Yes, water can affect pit work in Cedar Point: seasonal water table conditions are mapped within 60 inches across 26 percent of the area. Caney Creek touches or follows the community boundary, so a nearby crossing needs careful depth and route planning. We can size pits and pump water when conditions at the site call for it.
What ground should I expect under Choates soil in Cedar Point?
The USDA soil survey maps Choates loamy fine sand across 15 percent of Cedar Point. At about 40 inches, sandy clay loam is mapped across 30 percent of the area, and average clay content is 26 percent. Those mapped patterns are not test borings; the mix means the drilling plan must account for both surface sand and deeper clay.
Is a Cedar Point bore likely to hit rock?
The USDA soil survey does not map bedrock in Cedar Point’s top five feet, but that does not rule out deeper rock. The geologic map shows the Miocene Fleming Formation, described as clay and sandstone. A longer or deeper bore may encounter different material than the shallow soil map suggests, so the route profile matters.
Who approves a Cedar Point bore under US 190, and which TxDOT office reviews it?
For a Cedar Point bore in the US 190 right of way, the utility owner files through TxDOT’s RULIS system, and the TxDOT Lufkin District reviews the application. We provide the bore plan and profile for the owner’s filing and work under its permit. The required cover depends on the kind of line being installed.
How early should I request a Cedar Point locate before work on Cedar Point Drive?
For a bore on Cedar Point Drive, Texas811 needs the locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start date slips beyond that notice window, submit a new request. Marks that wear off or move must be refreshed through Texas811 before work continues.
Does the distance from West Livingston to Cedar Point change how a bore is planned?
West Livingston is 7.7 miles southeast of Cedar Point, while the Yukon yard is 423 road miles away. The longer trip affects mobilization planning for a route near US 190 or a local street. The bore itself still depends on its length, line size, ground and crossings.
What affects the cost of a directional bore in Cedar Point under US 190?
The price depends on the route and scope, including bore length, pipe or conduit size, soil, utility crossings and pavement. At US 190, right of way work and required cover can shape the plan. Choates loamy fine sand, deeper sandy clay loam, creek or lake crossings, pit work and the trip from Yukon can also affect the job.
Where the Cedar Point facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Cedar Point
- U.S. Census Bureau, TIGER/Line 2024: Cedar Point boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Cedar Point population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Cedar Point housing units and year built
- Macrostrat geologic map compilation: map units under Cedar Point
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Polk County
- U.S. Geological Survey, Elevation Point Query Service: Cedar Point elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Cedar Point
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Cedar Point
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Cedar Point, Texas
Type the address of your job in Cedar Point. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Cedar Point
Same county: Corrigan · Indian Springs · Big Thicket Lake Estates · Pleasant Hill · Goodrich · Seven Oaks. All counties: Texas county list.