Dean Texas Directional Boring: dale Soil, Duck Creek and Texas State Highway 79
Quick Answer: Need a line beneath Duck Creek or Texas State Highway 79 without opening the surface? We handle directional boring, also called horizontal directional drilling (HDD), for Dean crossings in Texas. Dean is 150 road miles from our Yukon, Oklahoma main office, and Tammen Road is one local route to consider for access. Deandale soil has heavy clay about 40 inches down, which can cling to the reamer and grip pipe. We adjust the fluid and reaming plan to suit that ground.
Dean bores at a glance
- Incorporated city in Clay County, Texas. Population 521 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 150 miles, about 2.9 hours of driving.
- Ground: Deandale soil is mapped on 41 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 11 percent of the area.
- Highways inside the boundary: Texas State Highway 79, FM 2393 and FM 3393. State permit office: TxDOT Wichita Falls District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Duck Creek and Turkey Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring under Duck Creek in Dean?
Need a line beneath Duck Creek or Texas State Highway 79 without cutting the surface? We take directional boring work in Dean, Clay County, where the Census Bureau Vintage 2024 estimate puts the population at 521. A water service near Tammen Road, sewer along a Dean street, gas beneath a road, electric conduit or fiber can all be installed by bore. We size the approach to the route and the line going in.
Our main office is in Yukon, Oklahoma, and Dean work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A short 3/4 inch service line near Ray Road and a 48 inch casing under Texas State Highway 79 show the range of work we take. Our family business started in 1965, and we have done directional boring since 1982, with Dean routes shaping the job plan.

What ground does a directional bore meet in Dean’s Deandale soil?
The USDA soil survey maps Deandale soil across 41 percent of Dean and Renfrow soil across another 41 percent. At about 40 inches below the surface, clay is mapped across 84 percent of the area; the average clay content at that depth is 42 percent. The surface is loam across 52 percent and silt loam across 48 percent. We treat mapped Deandale patterns as planning references, not test borings, before selecting a bore approach in Dean. The heavy clay can stick to a reamer and swell around pipe, so the bore may need staged reaming and a same day pullback.
| USDA soil survey, inside the Dean city limits | What is mapped |
|---|---|
| Soil series mapped | Deandale 41 percent, Renfrow 41 percent, Bluegrove 8 percent, Port 5 percent and Stoneburg 3 percent |
| Texture at the surface | loam 52 percent and silt loam 48 percent |
| Texture about 40 inches down | clay 84 percent, bedrock 11 percent and silty clay loam 5 percent |
| Engineering class about 40 inches down | lean clay (CL) 48 percent and fat clay (CH) 41 percent |
| Average clay content about 40 inches down | 42 percent |
| Bedrock mapped within 60 inches | 11 percent of the area (0 percent hard rock, 11 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 5 percent of the area |
| High corrosion risk for uncoated steel | 92 percent of the area |
The USDA survey maps bedrock within 60 inches across 11 percent of Dean, and the mapped bedrock is weathered rather than hard. That can slow a bore where it is encountered, especially at a soil to rock change. Seasonal water table is not mapped within 60 inches, while flood prone soils cover 5 percent. High steel corrosion risk is mapped across 92 percent, so the line owner should consider steel casing and tracer wire coatings; HDPE avoids that soil corrosion concern. The mapped Petrolia Formation is Cisuralian and includes shale, sandstone and limestone, so a site check still matters.
What does it take to bore Dean’s clay ground?
Deandale soil and the mapped clay at about 40 inches call for a controlled drilling fluid plan. We adjust reaming and pullback to keep the hole workable along Dean streets.
- In Deandale clay, we use a thinner drilling fluid with polymer and ream in stages to limit sticky material building on the reamer.
- Because heavy clay covers much of Dean at about 40 inches, we watch fluid returns near pavement so pressure does not lift the surface.
- On a route near the mapped weathered bedrock, we slow down and check steering as the drill moves from soil into rock.
- Before drilling near any marked utility, we expose it with hydrovac potholing; on a Tammen Road route, paint alone does not show its depth.

Where might a Dean line go under Tammen Road?
Texas State Highway 79, FM 2393 and FM 3393 run through Dean, so a route beside or across one of them needs a plan for the state right of way. Tammen Road is the longest named street in the city at 2.53 miles. 77 Ranch Road runs 1.05 miles, and Ray Road runs 0.78 miles. A bore under a street or highway avoids cutting the surface, but the route, pits and depth still have to fit the crossing and its permit.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 79 | State highway | 5.1 roadway miles inside | State highway office |
| FM 2393 | State highway | 4.1 roadway miles inside | State highway office |
| FM 3393 | State highway | 3.6 roadway miles inside | State highway office |
| Duck Creek | Stream | 0.83 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Turkey Creek | Stream | 0.31 channel miles inside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Dean or within 1 mile outside its limits, so no local track crossing is identified. Duck Creek runs 0.83 channel miles through the city, and Turkey Creek runs 0.31 miles. Public mapping shows four street crossings of named streams. A crossing near Duck Creek needs depth planning beneath the channel and a check for U.S. Army Corps of Engineers jurisdiction. We check Duck Creek separately because no lakes or ponds are mapped within 1 mile of Dean.
Whose permission does a Dean bore in Clay County need?
Dean is incorporated, so its city streets belong to the city; we do not assume a city permit process beyond the details provided for the route. Work in the right of way of Texas State Highway 79, FM 2393 or FM 3393 needs a TxDOT utility permit reviewed by the Wichita Falls District. The utility that owns the line files through TxDOT’s RULIS system, and we prepare the bore plan and profile for work under that permit. At Duck Creek, planning includes checking whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. A Texas811 request for Tammen Road must be made at least 48 hours ahead, counted as two working days.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried in Dean, Clay County?
The water provider for a specific Dean address, including one near Tammen Road, has to be confirmed with the city, Clay County or the local water district before a bore is planned. Electric service reported in the county includes Oncor Electric Delivery Company, Texas New Mexico Power and Wise Electric Cooperative. Those reports do not establish which utility serves every address. Before an electric conduit bore on Ray Road, we confirm the line owner so the conduit route and permit match the responsible utility.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Oncor Electric Delivery Company, Texas-New Mexico Power and Wise Electric Cooperative | Electric utilities reporting service in Clay County | EIA Form 861 | Confirm the line owner by address |
Dean’s 1988 median housing year gives our underground planning context, but we still verify utility locations before boring. The survey estimates 21 percent of homes were built before 1960 and 39 percent in 2000 or later. That mix can mean a route serves a replacement line or a newer service connection. Along Tammen Road, we hydrovac pothole marked utilities before drilling near them; paint shows a line’s position, not its depth.

What does Jolly’s proximity to Dean mean for our directional boring project?
Dean is in Clay County, at an elevation of 991 feet, and covers 2.13 square miles. Its ZIP code is 76305. Jolly is 4.1 miles southeast, while Wichita Falls is 7.2 miles west and is the nearest larger city. Henrietta, the Clay County seat, is 13.9 miles southeast. Dean is 150 road miles and about 2.9 drive hours from our Yukon, Oklahoma yard, a distance that can affect equipment mobilization for a job on Ray Road or elsewhere in town.
Places near Dean
- Directional boring in Jolly: 4.1 miles southeast
- Directional boring in Wichita Falls: 7.2 miles west
- Directional boring in Lakeside City: 10 miles southwest
- Directional boring in Cashion Community: 10.3 miles northwest
- Directional boring in Pleasant Valley: 11.4 miles west
What kinds of bores come up near Dean’s Ray Road?
- Highway crossing: A bore beneath Texas State Highway 79 keeps the line below the road surface, with depth and right of way needs set in the permit.
- Water service: A service near Ray Road needs its address specific water provider confirmed before we plan the line and its connection.
- Fiber route: A fiber bore along Tammen Road can pass beneath driveways without cutting them, with marked utilities exposed before drilling nearby.
- Creek crossing: A Duck Creek crossing needs a route beneath the channel and planning for a jurisdiction check.
- Electric conduit: Before a conduit bore near FM 2393, we confirm which reported county electric utility owns the line at that address.
- Sewer line: A sewer route near Turkey Creek can use a bore to avoid an open cut across the mapped stream corridor.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Dean bore under Texas State Highway 79?
For a quote near Tammen Road, start with the address or a map pin so we can see the route. Tell us what is going underground, such as water, sewer, gas, electric conduit or fiber. Give us the pipe or conduit size and footage; a sketch or plans help show how the line approaches Texas State Highway 79 or Duck Creek.
Dean is 150 road miles from Yukon, so mobilization is part of the job scope. Deandale clay can affect drilling fluid, reaming and pullback. A crossing of Texas State Highway 79 brings right of way planning, while Duck Creek can add crossing review and depth planning. Price also reflects line size and length, utilities to expose, pavement or concrete, pits, excavator time and sand backfill. Emergency or high profile work can add demands to the plan.
Questions people ask about boring in Dean
Does Trinity Boring Solutions take directional boring jobs in Dean, Clay County, and who staffs them?
Yes. We take Dean work in Clay County and keep the job with Trinity from the first call through the bore log, whichever crew is on site. Our own crews and satellite yards operated by partner drilling contractors we have vetted support the work. A route beneath Tammen Road is planned around its actual line and access.
Does Deandale soil in Dean corrode steel, and what pipe should I use?
The USDA soil survey maps high steel corrosion risk across 92 percent of Dean, including areas mapped as Deandale soil. The line owner chooses coatings for steel casing or tracer wire after considering the site. We use Bluegrove, one of Dean’s listed soil series, as local context; HDPE is not affected by the stated soil corrosion concern. The material choice depends on the line and its design, not the soil map alone.
What ground does a bore pass through in Dean’s Deandale soil?
The USDA soil survey maps Deandale across 41 percent of Dean, and clay across 84 percent of the mapped area at about 40 inches below the surface. Dean’s soil series include Renfrow; we treat the stated 42 percent average clay content at that depth as a planning input. This can make cuttings sticky and cause clay to grip pipe, so reaming and pullback timing matter on a Dean bore.
Will a directional bore in Dean hit rock, and how much bedrock is mapped within five feet?
Bedrock is mapped within 60 inches across 11 percent of Dean, and the mapped material is weathered, not hard. A bore near that mapped area may slow at the soil to rock contact. The Petrolia Formation includes shale, sandstone and limestone, but the soil survey is not a site specific test for a route on Ray Road.
For a bore under Texas State Highway 79 in Dean, do we seek approval through TxDOT Wichita Falls District?
TxDOT’s Wichita Falls District reviews the utility permit for work in the right of way of Texas State Highway 79. The utility that owns the line files through the RULIS system. We provide the bore plan and profile and work under the permit issued to that utility owner. The depth required depends on the line type and permit.
Can you bore a line under Duck Creek in Dean?
A bore under Duck Creek can be planned, with its route and depth set to pass beneath the channel. Duck Creek runs 0.83 channel miles in Dean, and a crossing is checked during planning for U.S. Army Corps of Engineers jurisdiction. We also look at access for the entry and exit pits on the specific route.
Can I reach Trinity after hours for an urgent bore near Ray Road in Dean?
Yes. A person answers Trinity’s phone at (405) 409-7423 24 hours a day, including for an urgent job near Ray Road. Emergency work still needs a clear scope and site details so we can understand access, the line and any road or utility crossings in Dean.
How much Texas811 notice does a bore on Tammen Road in Dean need, and what if marks move?
For a Tammen Road bore, Texas811 requires a locate request at least 48 hours before excavation, counted as two working days, excluding Saturdays, Sundays and legal holidays. The request cannot be made more than 14 days before work. For a planned FM 2393 start, if the date slips more than 14 days past the original notice, we submit a new request. Near Ray Road, we refresh worn or moved marks through Texas811 before work continues.
What affects the cost of a directional bore under Texas State Highway 79 in Dean?
The scope sets the price for a Texas State Highway 79 bore. Length and pipe size matter, as do the Deandale clay, utilities to expose, pavement, pits and equipment time. A highway right of way crossing needs its own permit planning, and mobilization from Yukon matters because Dean is 150 road miles away. We need the route and line details to assess the work.
Where the Dean facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Dean
- U.S. Census Bureau, TIGER/Line 2024: Dean boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Dean
- U.S. Census Bureau, American Community Survey 2019 to 2023: Dean housing units and year built
- Macrostrat geologic map compilation: map units under Dean
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Clay County
- U.S. Geological Survey, Elevation Point Query Service: Dean elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Dean
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Dean
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Dean, Texas
Type the address of your job in Dean. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Dean
Same county: Henrietta · Petrolia · Byers · Bellevue. All counties: Texas county list.
