Hitchcock Texas Directional Boring: Maggies Soil, Basford Bayou and BNSF Railway
Quick Answer: Hitchcock is an incorporated city, so its streets belong to the city; we do directional boring, also called horizontal directional drilling (HDD), for routes near Basford Bayou. Hitchcock is 502 road miles from our Yukon, Oklahoma main office, with FM 2004 among the local routes a bore may cross. Maggies soil and clay loam are common in the mapped ground. Sticky clay can grip the pipe, so crews manage drilling fluid and ream in stages.
Hitchcock bores at a glance
- Incorporated city in Galveston County, Texas. Population 7,752 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 502 miles, about 10.2 hours of driving.
- Ground: Maggies soil is mapped on 17 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: FM 2004, Texas State Highway 6, FM 646 and FM 519. State permit office: TxDOT Houston District.
- Railroad track inside the boundary: BNSF Railway and Texas City Terminal Railway, with 14 mapped street and rail crossings.
- Named streams inside the boundary: Basford Bayou, Briscoe Canal, Willow Bayou and Highland Bayou.
- Public water: City of Hitchcock, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near FM 2004 in Hitchcock?
Hitchcock is an incorporated city in Galveston County, and the Census Bureau Vintage 2024 estimate puts its population at 7,752. We install water, sewer, gas, electric conduit and fiber lines, including service routes along streets such as Railroad Avenue or connections that need to cross FM 2004. The city street system is locally owned, while state highway work follows TxDOT requirements.
Our main office is in Yukon, Oklahoma, and Hitchcock work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For routes around FM 2004, we handle jobs from 3/4 inch service lines to 48 inch casing and lengths from 10 feet to 5,000 feet. Our family business began in 1965, and we have done directional boring since 1982 for projects serving Hitchcock.

What do Maggies and Hitchcock soil facts show about local ground?
The USDA soil survey maps Maggies as 17 percent of Hitchcock and Maggies very fine sandy loam, 1 to 2 meter water depth, across 16 percent. At about 40 inches below the surface, clay loam accounts for 36 percent of mapped area, clay 23 percent and sandy clay loam 20 percent. Average clay content at that depth is 34 percent, and surface clay is mapped across 17 percent. For Hitchcock planning, these mapped patterns guide review but are not test borings at a proposed crossing. Sticky clay can ball on a reamer, so the bore plan should account for staged enlargement and pipe pull timing.
| USDA soil survey, inside the Hitchcock city limits | What is mapped |
|---|---|
| Soil series mapped | Maggies 17 percent, Tracosa 12 percent, Narta 11 percent, Leton 8 percent and Mocarey 6 percent |
| Texture at the surface | loam 28 percent, very fine sandy loam 17 percent and clay 17 percent |
| Texture about 40 inches down | clay loam 36 percent, clay 23 percent and sandy clay loam 20 percent |
| Engineering class about 40 inches down | lean clay (CL) 32 percent, fat clay (CH) 30 percent and clayey sand (SC) 3 percent |
| Average clay content about 40 inches down | 34 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 94 percent of the area |
| Flood prone soils | 59 percent of the area |
| High corrosion risk for uncoated steel | 93 percent of the area |
In Hitchcock, bedrock is not mapped in the top five feet, though deeper rock can still affect bore planning. The USDA soil survey maps a seasonal water table within 60 inches across 94 percent of the area and flood prone soils across 59 percent, so pits near Basford Bayou need drainage planning. High steel corrosion risk is mapped across 93 percent, a concern for uncoated steel casing and tracer wire; the line owner selects materials. The geologic map shows Alluvium of Holocene age, with sand, silt, clay and gravel, so conditions can vary along a route.
How do crews handle clay loam in Hitchcock?
Clay loam is mapped under 36 percent of Hitchcock at about 40 inches. On routes near Basford Bayou, we plan for sticky cuttings and wet pits rather than assuming the ground stays uniform.
- Maggies soil and the mapped clay loam can cling to a reamer, so crews can use thinner drilling fluid, add polymer and enlarge the hole in stages.
- Where heavy clay occurs along a route near Basford Bayou, crews watch fluid returns and keep pressure controlled to avoid lifting nearby pavement.
- The mapped seasonal water table near Railroad Avenue makes pit drainage a planning point; crews can keep pits small and pump collected water.
- Before drilling near a marked line along Camp Wallace Road, crews use hydrovac potholing to expose it, then track the drill head and log depth and pitch.

What does a bore have to cross near Basford Bayou in Hitchcock?
FM 2004 has 19.8 mapped roadway miles in Hitchcock, while Texas State Highway 6 has 8.4. FM 646 and FM 519 also run inside the limits, and Interstate 45 and US 75 touch or run along the boundary. A state route crossing is planned differently from a city street bore. Railroad Avenue extends 4.52 miles in the city, Camp Wallace Road 4.37 miles and Martin Luther King Avenue 2.63 miles, giving route planners several long street corridors to check for existing utilities and access.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 2004 | State highway | 19.8 roadway miles inside | State highway office |
| Texas State Highway 6 | State highway | 8.4 roadway miles inside | State highway office |
| FM 646 | State highway | 2.6 roadway miles inside | State highway office |
| FM 519 | State highway | 1.1 roadway miles inside | State highway office |
| Interstate 45 | Highway nearby | Runs along or touches the city limits | State highway office |
| US 75 | Highway nearby | Runs along or touches the city limits | State highway office |
| Texas State Highway 146 | Highway nearby | 0.1 miles outside | State highway office |
| Texas State Highway 3 | Highway nearby | 0.7 miles outside | State highway office |
| BNSF Railway | Railroad | 11.83 track miles inside | The railroad |
| Texas City Terminal Railway | Railroad | 1.57 track miles inside | The railroad |
| Union Pacific | Railroad nearby | 0.1 miles outside | The railroad |
| Basford Bayou | Stream | 5.15 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Briscoe Canal | Stream | 4.55 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Willow Bayou | Stream | 2.96 channel miles inside | Checked for Corps of Engineers jurisdiction |
BNSF Railway has 11.83 track miles in Hitchcock and Texas City Terminal Railway has 1.57; the map counts 14 street and rail crossings. A route under either railroad needs an agreement from that track owner. Basford Bayou has 5.15 channel miles in the city, and 13 street crossings of named streams are mapped. Briscoe Canal has 4.55 channel miles, while West Bay and Jones Bay are among the mapped water features. Creek and bayou routes need review for federal jurisdiction during planning.
Who approves a Hitchcock bore near BNSF Railway or FM 2004?
Hitchcock city streets belong to the city, but work in the right of way of FM 2004, Texas State Highway 6, FM 646 or FM 519 needs a TxDOT utility permit. The line owner, not the driller, files through TxDOT’s online RULIS system in the Houston District; we prepare the bore plan and profile for that filing. TxDOT cover requirements depend on the line and crossing: electric and communication lines need 60 inches at a highway crossing and 48 inches along the right of way. BNSF Railway and Texas City Terminal Railway crossings require an agreement with the track owner. Basford Bayou and other water crossings are checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns lines near the Hitchcock water system in Galveston County?
The City of Hitchcock public water system uses purchased surface water and reports 2,782 service connections serving 8,346 people. For electric service in Galveston County, the reporting utilities are CenterPoint Energy, Entergy Texas and Texas-New Mexico Power. Those county listings do not identify the provider at every address, so we confirm the line owner before planning an electric conduit bore near Railroad Avenue or another local route.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Hitchcock | Public water system | Surface water bought from another system | 2,782 connections, 8,346 people served |
| CenterPoint Energy, Entergy Texas and Texas-New Mexico Power | Electric utilities reporting service in Galveston County | EIA Form 861 | Confirm the line owner by address |
Hitchcock’s American Community Survey 2019 to 2023 five year estimates place median housing year at 1983, useful context, not a subsurface condition for bore planning. The estimates show 17 percent of homes built before 1960, 48 percent from 1960 to 1999 and 35 percent in 2000 or later. A replacement bore along Camp Wallace Road may serve older infrastructure, while newer areas can call for service extensions. We hydrovac pothole marked lines on the bore path because locate marks show position, not depth, and buried services can vary from one property to the next.

Do you cover Hitchcock and nearby Tiki Island?
Hitchcock is in Galveston County, covers 60.43 square miles and sits at an elevation of -2 feet. For a Hitchcock location, we use ZIP codes 77563 and 77510 to help identify the requested bore site. Bayou Vista is 5.1 miles northeast, Tiki Island is 5.7 miles east and La Marque is 6.1 miles north. Galveston, the county seat, is 7.1 miles south; La Marque is the nearest larger city listed. Our Yukon, Oklahoma main office is 502 road miles away, a 10.2 hour drive, which is relevant to mobilization for a Hitchcock bore.
Places near Hitchcock
- Directional boring in Bayou Vista: 5.1 miles northeast
- Directional boring in Tiki Island: 5.7 miles east
- Directional boring in La Marque: 6.1 miles north
- Directional boring in Jamaica Beach: 6.6 miles south
- Directional boring in Galveston: 7.1 miles south
What kinds of bores come up near Martin Luther King Avenue in Hitchcock?
- Highway crossing: A bore beneath FM 2004 avoids cutting through the highway pavement and is planned around TxDOT requirements.
- Water service: A new connection near the City of Hitchcock water system can carry a service line beneath a street or driveway.
- Fiber route: Conduit along Railroad Avenue can link properties while leaving the paved street surface uncut.
- Creek crossing: A route near Basford Bayou needs depth planning below the channel and a check for Corps jurisdiction.
- Rail crossing: A utility route under BNSF Railway needs an agreement from the railroad that owns the track.
- Street replacement: A bore near Camp Wallace Road can carry replacement pipe past existing lines after marked utilities are exposed.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a bore near Redfish Drive in Hitchcock?
Before we plan a Hitchcock bore, send a map pin or street address so we can locate the proposed route. The exact spot matters near Redfish Drive because a route toward Basford Bayou or FM 2004 can change the crossings and access. To scope a Hitchcock bore, tell us what goes in the ground, the pipe or conduit size, and the footage. A sketch or plans help us lay out the route and identify the points that need review.
A short, accessible service bore away from marked lines can be simpler to plan than a route across FM 2004 or BNSF Railway. Length, pipe size, Maggies soil and clay loam, utilities to expose, pavement, creek crossings and pit work all affect the scope. Basford Bayou can add crossing planning, while the 502 road miles from Yukon affect mobilization. High profile or emergency work also changes what the job requires.
Questions people ask about boring in Hitchcock
Does Trinity take directional boring jobs in Hitchcock and Galveston County, and who does the work?
Yes. We take directional boring work for Hitchcock projects and across Texas, with routing planned for each site. Our main office is in Yukon, and jobs are staffed with our crews or partner contractor crews from satellite yards. We stay involved from the first call through the bore log, including work near FM 2004.
What does Hitchcock housing near Camp Wallace Road mean for replacement bores?
The American Community Survey 2019 to 2023 estimates put the median housing year at 1983, with 17 percent built before 1960. Older areas may have lines that need replacement, but the survey does not date buried utilities along Camp Wallace Road. We expose marked lines before drilling near them on a Hitchcock bore route, keeping the planned crossing clear.
Can groundwater or flood prone soil affect bore pits near Basford Bayou in Hitchcock?
Yes. The USDA soil survey maps a seasonal water table within 60 inches across 94 percent of Hitchcock and flood prone soils across 59 percent. Near Basford Bayou, pit placement and drainage need attention, and the crossing is checked for Corps jurisdiction during planning.
Does Maggies soil in Hitchcock create a steel corrosion concern, and what pipe can be used?
The mapped soil data show high steel corrosion risk across 93 percent of Hitchcock, which matters for uncoated casing and tracer wire. For Hitchcock installations, HDPE is not subject to that soil corrosion concern, which keeps that material issue out of pipe planning. The line owner chooses coatings or materials for a steel component near Maggies soil.
What ground does a bore pass through in Hitchcock near Maggies soil?
The USDA soil survey maps Maggies across 17 percent of Hitchcock. At about 40 inches, clay loam is mapped under 36 percent of the area, clay under 23 percent and sandy clay loam under 20 percent. Those mapped patterns help plan the bore, but they are not test borings.
Will Hitchcock ground make a directional bore hit rock?
In Hitchcock, bedrock is not mapped in the top five feet, though deeper rock can still affect bore planning. The geologic map shows Alluvium of Holocene age, including sand, silt, clay and gravel. A route near Basford Bayou still needs field conditions checked as the bore advances.
What bore sizes and lengths can you handle near Redfish Drive in Hitchcock?
We handle work from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. The route near Redfish Drive, the pipe size and local crossings determine how a particular job is planned.
How much notice does Texas811 need for a Hitchcock bore near Railroad Avenue?
Request a Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If a Railroad Avenue start slips more than 14 days past the original notice, make a new request. If marks wear off or move along a Hitchcock bore route, we refresh them through Texas811 before work continues.
What affects directional boring cost near FM 2004 in Hitchcock?
The job scope drives the price. Length, pipe or conduit size, Maggies soil, marked utilities, pavement, pits and creek crossings all matter. A bore under FM 2004 adds highway planning, and a route near Basford Bayou may need water crossing review. Mobilization for Hitchcock work also accounts for the 502 road miles from Yukon when we plan project logistics.
Where the Hitchcock facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Hitchcock
- U.S. Census Bureau, TIGER/Line 2024: Hitchcock boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Hitchcock
- U.S. Census Bureau, American Community Survey 2019 to 2023: Hitchcock housing units and year built
- Macrostrat geologic map compilation: map units under Hitchcock
- U.S. EPA Safe Drinking Water Information System: public water systems serving Hitchcock
- U.S. Department of Transportation, North American Rail Network: track owners in Galveston County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Galveston County
- U.S. Geological Survey, Elevation Point Query Service: Hitchcock elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Hitchcock
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Hitchcock
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Hitchcock, Texas
Type the address of your job in Hitchcock. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.