Mathis Texas Directional Boring: Victoria Clay, Interstate 37 and Sixmile Creek
Quick Answer: At 564 road miles from our Yukon yard, Mathis work is handled by our own crews and vetted partner contractor crews near San Patricio Avenue. We take directional boring, also called horizontal directional drilling (HDD), for routes crossing Interstate 37 or Union Pacific track in Mathis. Victoria clay covers much of the mapped area, so sticky cuttings call for controlled fluid and staged reaming. Beeville is 22.1 miles north if your project sits beyond Mathis.
Mathis bores at a glance
- Incorporated city in San Patricio County, Texas. Population 4,292 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 564 miles, about 11 hours of driving.
- Ground: Victoria soil is mapped on 46 percent of the area, with clay about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Interstate 37, Texas State Highway 359, FM 666, FM 1068 and FM 3024. State permit office: TxDOT Corpus Christi District.
- Railroad track inside the boundary: Union Pacific, with 9 mapped street and rail crossings.
- Public water: City of Mathis, surface water.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring in Mathis near Interstate 37?
At 564 road miles from our Yukon yard, Trinity Boring Solutions takes directional boring jobs in Mathis, staffed by our own crews and vetted partner contractor crews. The Census Bureau Vintage 2024 estimate puts Mathis at 4,292 residents. We install water, sewer, gas, electric conduit and fiber along routes such as San Patricio Avenue or Texas State Highway 359.
Our main office is in Yukon, Oklahoma, and Mathis work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business started in 1965, with directional boring work dating to 1982. For a Mathis route along San Patricio Avenue, our equipment range runs from 3/4 inch service lines to 48 inch casing, with bore lengths from 10 feet to 5,000 feet.

What is Victoria soil like to bore in Mathis?
Mathis has extensive Victoria soil, and the USDA soil survey maps Victoria clay at 43 percent of the area with 0 to 1 percent slopes. The survey maps clay across 53 percent of the surface, while about 40 inches down it maps clay across 72 percent of the area. Average clay content at that depth is 46 percent. These are mapped patterns, not test borings. For a bore near San Patricio Avenue, sticky clay can cling to the reamer and swell around pipe, so the fluid and reaming plan matter.
| USDA soil survey, inside the Mathis city limits | What is mapped |
|---|---|
| Soil series mapped | Victoria 46 percent, Raymondville 18 percent, Pettus 8 percent, Imogene 7 percent and Banquete 7 percent |
| Texture at the surface | clay 53 percent, clay loam 18 percent and fine sandy loam 16 percent |
| Texture about 40 inches down | clay 72 percent, sandy clay loam 20 percent and very gravelly loam 8 percent |
| Engineering class about 40 inches down | fat clay (CH) 53 percent, lean clay (CL) 34 percent and clayey gravel (GC) 8 percent |
| Average clay content about 40 inches down | 46 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 65 percent of the area |
Bedrock is not mapped in the top five feet of Mathis, but that does not rule out deeper rock. Seasonal water table and flood prone soils are not mapped in the survey area, which helps with pit planning but does not describe every excavation. The USDA soil survey maps high steel corrosion risk across 65 percent of Mathis, so the line owner should weigh casing and tracer wire materials; HDPE does not share that steel concern. The geologic map shows the Pleistocene Beaumont Formation, predominantly clay, and Late Pleistocene Delta Silt And Clay, both relevant to a clay focused bore plan.
How do crews handle Mathis clay?
For Mathis routes through Victoria clay, we control the drilling fluid and open the hole in stages. Along San Patricio Avenue, locating and exposing marked utilities comes before the drill approaches them.
- Victoria clay can stick to the reamer and grip pipe, so we use a thinner fluid with polymer, ream in stages and pull pipe the same day the hole opens.
- With heavy clay mapped across much of Mathis, we watch fluid returns near pavement on San Patricio Avenue so pressure does not lift the surface.
- Before drilling near marked lines on Aransas Street, we hydrovac pothole each utility on the path; locate paint gives position, not burial depth.
- We track the drill head from the surface and record depth and pitch as a Mathis bore advances beneath a street or toward Interstate 37.

Where might a Mathis line go under Sixmile Creek?
Mathis routes may need to cross Interstate 37, which has 4.8 mapped roadway miles inside the city, or Texas State Highway 359, with 5.8 mapped roadway miles. FM 666, FM 1068, FM 3024 and FM 3377 are also inside the limits, and Texas State Highway 188 is 0.6 miles beyond them. San Patricio Avenue is the longest named street at 1.99 miles, followed by Front Street at 1.52 miles and Rockport Street at 1.24 miles. A bore can keep those surfaces intact when the route and access allow.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 37 | Interstate | 4.8 roadway miles inside | State highway office |
| Texas State Highway 359 | State highway | 5.8 roadway miles inside | State highway office |
| FM 666 | State highway | 0.8 roadway miles inside | State highway office |
| FM 1068 | State highway | 0.6 roadway miles inside | State highway office |
| FM 3024 | State highway | 0.3 roadway miles inside | State highway office |
| FM 3377 | State highway | 0.2 roadway miles inside | State highway office |
| Texas State Highway 188 | Highway nearby | 0.6 miles outside | State highway office |
| Union Pacific | Railroad | 1.47 track miles inside | The railroad |
| Sixmile Creek | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
| Arroyo Nombre de Dios | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific has 1.47 track miles in Mathis, and public mapping shows 9 street and rail crossings inside the city. A route under that track needs a railroad crossing agreement. Sixmile Creek lies 0.5 miles from the city limits, and Arroyo Nombre de Dios lies 0.8 miles away; no named stream street crossings are mapped inside Mathis. The creek route still needs review for possible Corps jurisdiction during planning, while no lakes or ponds are mapped within one mile.
Do I need a permit for Mathis work near Union Pacific?
For a Mathis bore under Interstate 37 or Texas State Highway 359, TxDOT Utility Accommodation Rules set the cover depth and TxDOT’s Corpus Christi District reviews the utility permit. Electric and communication lines need 60 inches at a highway crossing and 48 inches along the right of way; water needs 60 inches at crossings and 36 inches along it, while pressurized sewer needs 60 inches at crossings. The utility owner files through RULIS, and we prepare the bore plan and profile for that application. Work under Mathis city streets is under city control. A Union Pacific track crossing needs an agreement with the railroad, and a Sixmile Creek route is checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Mathis system?
The City of Mathis public water system uses surface water and reports 1,667 service connections serving 5,001 people. That system is a key point to check when planning water work near San Patricio Avenue. AEP Texas Central and San Patricio Electric Cooperative report electric service in San Patricio County. We confirm the line owner for the specific Mathis address before planning an electric conduit bore, rather than assume one provider serves every route.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Mathis | Public water system | Surface water | 1,667 connections, 5,001 people served |
| AEP Texas Central and San Patricio Electric Cooperative | Electric utilities reporting service in San Patricio County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Mathis’s median housing year at 1971; 25 percent of homes were built before 1960, 62 percent from 1960 to 1999 and 13 percent in 2000 or later. A San Patricio Avenue project could involve replacing older service or extending a newer one, so the route needs checking either way. We hydrovac pothole marked utilities on the bore path before drilling near them because paint shows position, not depth.

What is near Mathis, including Beeville?
Mathis is in San Patricio County, covers 3.32 square miles and sits at an elevation of 148 feet. Its ZIP code is 78368. Paisano Park is 2.6 miles west, Lakeside is 2.8 miles west, and Lake City is 4.0 miles west. Sinton, the county seat, is 19.6 miles east; Beeville is 22.1 miles north. Our Yukon yard is 564 road miles away, an 11.0 hour drive, so that distance is part of planning mobilization for an Interstate 37 or San Patricio Avenue project.
Places near Mathis
- Directional boring in Paisano Park: 2.6 miles west
- Directional boring in Lakeside: 2.8 miles west
- Edgewater Estates: 3 miles west
- Directional boring in Lake City: 4 miles west
- Directional boring in Lakeshore Gardens-Hidden Acres: 4.1 miles northwest
- Directional boring in Beeville: 22.1 miles north
What kinds of bores could serve Mathis near San Patricio Avenue?
- Highway crossing: A route beneath Interstate 37 can keep the existing pavement uncut, with cover and bore limits planned under TxDOT requirements.
- Water service: A connection near the City of Mathis system may need a route that avoids surface disruption along San Patricio Avenue.
- Fiber route: A fiber conduit along Front Street can be planned around marked utilities, with each conflict exposed before drilling approaches.
- Rail crossing: A Mathis route beneath Union Pacific track needs a railroad agreement that sets crossing conditions for that location.
- Creek approach: A project near Sixmile Creek can be evaluated for a channel crossing and possible Corps jurisdiction during planning.
- Street service: A bore near Aransas Street can connect a service while leaving the street surface intact, subject to access and route design.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote directional boring in Mathis near Aransas Street?
For a Mathis quote, start with the address or map pin, such as a location on Aransas Street. Tell us what goes underground, whether it is water, sewer or fiber, then give the pipe or conduit size and footage. A sketch or plans showing the route toward Interstate 37 or a nearby street crossing help us understand the path.
The Mathis job scope drives the price: length, pipe or conduit size, Victoria clay, and the number of utilities to expose all affect the work. Concrete or pavement along Interstate 37, a Union Pacific crossing, or a creek route can change the setup. Pit work, excavator time and sand backfill matter too. With the Yukon yard 564 road miles away, mobilization is another part of a Mathis estimate, especially for high profile or emergency work.
Questions people ask about boring in Mathis
Does Trinity take directional boring work in Mathis and San Patricio County?
Yes. Trinity Boring Solutions takes directional boring work in Mathis, San Patricio County, using our own crews and satellite yards run by partner contractors we have vetted. You work with Trinity through the project, even when a partner crew is at the site. Routes along San Patricio Avenue can include water, sewer, gas, electric conduit or fiber.
What ground should I expect in Mathis around Victoria soil?
The USDA soil survey maps Victoria clay across 43 percent of Mathis, with clay mapped across 72 percent of the area at about 40 inches below the surface. Sticky clay can build on the reamer and grip pipe. Those survey patterns are not test borings, so a route near Texas State Highway 359 still needs job specific planning.
Will a Mathis directional bore hit rock?
Bedrock is not mapped in the top five feet of Mathis, which does not rule out rock at greater depth. The geologic map lists the Pleistocene Beaumont Formation, predominantly clay, and Late Pleistocene Delta Silt And Clay. A route near San Patricio Avenue should be planned for mapped ground conditions while allowing for what the survey cannot establish at the bore depth.
Who approves a bore under Interstate 37 in Mathis?
TxDOT reviews utility permits for Interstate 37 in the Corpus Christi District. The utility owner submits the application through RULIS, with the bore plan and profile supplied for that Mathis route. TxDOT’s cover requirements depend on the line type, and the permit can set a different depth for the specific crossing.
What does a Mathis bore under Union Pacific track need?
Union Pacific owns 1.47 track miles inside Mathis. A crossing beneath its track needs an agreement from the railroad, which establishes the crossing conditions such as casing, depth and flagging. The mapped 9 street and rail crossings show why the track location and proposed bore path must be reviewed together.
Can a line be bored under Sixmile Creek near Mathis?
A bore under or near Sixmile Creek can be considered after the route and channel conditions are reviewed. The creek is 0.5 miles from Mathis city limits, and planning checks whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. The route also needs a depth and entry plan suited to the creek approach.
How early should I call Texas811 for work by San Patricio Avenue in Mathis?
For a bore by San Patricio Avenue, request locates at least 48 hours before excavation, not counting Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start moves more than 14 days past the notice, make a new request. Have worn or moved marks refreshed through Texas811 before work continues.
How far is Mathis from Yukon, and does Beeville affect mobilization?
Mathis is 564 road miles from our Yukon yard, an 11.0 hour drive, so distance is part of mobilization planning. Beeville is 22.1 miles north of Mathis and can help describe the project area, but it does not change the route details. Address, access and the planned crossing still shape the job.
What affects the cost of a directional bore under Interstate 37 in Mathis?
The Mathis job scope determines the price, including bore length, pipe or conduit size, Victoria clay, utility conflicts and pavement. An Interstate 37 crossing can involve highway permit planning and cover requirements; a Union Pacific or creek crossing adds its own coordination. Pit work, excavator time, backfill, emergency timing and mobilization from Yukon also affect the estimate.
Where the Mathis facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Mathis
- U.S. Census Bureau, TIGER/Line 2024: Mathis boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Mathis
- U.S. Census Bureau, American Community Survey 2019 to 2023: Mathis housing units and year built
- Macrostrat geologic map compilation: map units under Mathis
- U.S. EPA Safe Drinking Water Information System: public water systems serving Mathis
- U.S. Department of Transportation, North American Rail Network: track owners in San Patricio County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving San Patricio County
- U.S. Geological Survey, Elevation Point Query Service: Mathis elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Mathis
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Mathis
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Mathis, Texas
Type the address of your job in Mathis. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Mathis
Same county: Portland · Ingleside · Aransas Pass · Sinton · Taft · Odem · Gregory · Taft Southwest · Ingleside on the Bay · St. Paul · Morgan Farm · San Patricio. All counties: Texas county list.
