trinityboringsolutions.com

Ranchitos Las Lomas Texas Directional Boring: Moglia Clay Loam, US 59 and Las Lomas

Quick Answer: Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), in Ranchitos Las Lomas, Texas, including routes beneath US 59. The place is 652 road miles from our Yukon, Oklahoma main office, so a route along Salsi Puedes Road affects mobilization planning. Moglia clay loam is mapped across 33 percent of the area, and the sticky clay calls for controlled fluid and staged reaming. A bore near Las Lomas can leave the road surface uncut while going beneath it.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Ranchitos Las Lomas bores at a glance

  • Unincorporated community in Webb County, Texas. Population 167 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 652 miles, about 12.7 hours of driving.
  • Ground: Moglia soil is mapped on 33 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 16 percent of the area.
  • Highways inside the boundary: US 59. State permit office: TxDOT Laredo District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring near US 59 in Ranchitos Las Lomas?

Trinity Boring Solutions takes directional boring work in Ranchitos Las Lomas, an unincorporated community in Webb County where streets are under county or state authority, not a city government. The Census Bureau counted 167 people here in the 2020 Census. We install water, sewer, gas, electric conduit and fiber lines, including routes along Las Lomas or service connections beneath US 59.

Our main office is in Yukon, Oklahoma, and Ranchitos Las Lomas work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore ran roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa. That reach is far beyond a typical service bore near Camino Las Lomas. The family business began in 1965 and has done directional boring since 1982.

Trinity Boring Solutions branded compact directional drilling unit positioned beside a tree on a red dirt jobsite
Our compact directional drill set up beside a tree on a tight site. Photos on this page are from our jobs in Oklahoma and Texas.

How does Moglia soil affect directional boring in Ranchitos Las Lomas?

Moglia soil is the leading mapped soil in Ranchitos Las Lomas, and its clay loam calls for managing sticky cuttings rather than assuming sand. The USDA soil survey maps Moglia clay loam, 1 to 5 percent slopes across 33 percent of the area. It maps clay at 40 inches across 67 percent and loam across 33 percent; average clay content at that depth is 40 percent. These are mapped soil patterns, not test borings. Clay can cling to the reamer and grip pipe, so the bore plan needs controlled fluid and staged hole opening.

USDA soil survey, inside the Ranchitos Las Lomas mapped community boundaryWhat is mapped
Soil series mappedMoglia 33 percent, Monwebb 19 percent, Catarina 19 percent, Maverick 16 percent and Montell 14 percent
Texture at the surfaceclay 67 percent and clay loam 33 percent
Texture about 40 inches downclay 67 percent and loam 33 percent
Engineering class about 40 inches downfat clay (CH) 67 percent and lean clay (CL) 33 percent
Average clay content about 40 inches down40 percent
Bedrock mapped within 60 inches16 percent of the area (0 percent hard rock, 16 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils19 percent of the area
High corrosion risk for uncoated steel100 percent of the area

The USDA soil survey maps bedrock within 60 inches across 16 percent of Ranchitos Las Lomas, with a typical depth of 25 inches where present; the mapped material is weathered, not hard bedrock. Seasonal water table is not mapped in the top 60 inches, while flood prone soils cover 19 percent, so drainage and pit placement still matter. High steel and concrete corrosion risk is mapped across the area, a concern for casing and tracer wire that the line owner should address. The Yegua Formation, of Bartonian age, includes sandstone and clay, so deeper conditions may differ from the surface map.

How is a bore run through clay in Ranchitos Las Lomas?

We bore through Ranchitos Las Lomas clay by controlling fluid, opening the hole in stages and keeping the pipe ready for the pull. The mapped Moglia clay loam and heavier clay areas make timing and returns important.

  1. Fluid and reaming: In the clay mapped across 67 percent of Ranchitos Las Lomas at 40 inches, we use a thinner fluid plan and staged reaming to manage sticky cuttings.
  2. Pull timing: Moglia clay loam can swell around pipe, so for a bore near Camino Las Lomas we plan to have the product ready when the hole is opened.
  3. Pressure checks: Heavy clay can hold fluid; on a route near US 59 we watch returns and pressure to avoid lifting pavement.
  4. Line exposure: Before the drill approaches a marked utility on Salsi Puedes Road, we hydrovac pothole it because surface marks show position, not depth.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

Where might a line need to pass under US 59 in Ranchitos Las Lomas?

US 59 has 0.2 mapped roadway miles inside the Ranchitos Las Lomas community boundary, so a bore crossing it needs a route and profile suited to the highway right of way. Las Lomas is the longest named street at 2.09 miles, followed by Salsi Puedes Road at 1.98 miles and Camino Las Lomas at 1.92 miles. A bore beneath one of these roads can avoid cutting its surface, subject to the applicable road approval and work plan.

CrossingTypeMapped extentWho has a say
US 59US highway0.2 roadway miles insideState highway office
Jave TankLake or pond12 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad or mapped street and rail crossing is recorded inside the Ranchitos Las Lomas community boundary, so there is no mapped track route to plan around. No named stream is mapped inside the area, and no street crossing of a named stream is mapped. The survey does map 2.97 miles of unnamed drainage and Jave Tank, a 12 acre pond just outside the boundary; a proposed water crossing needs site specific review.

Who approves boring work in Ranchitos Las Lomas and Webb County?

In Ranchitos Las Lomas, Webb County or the state handles approvals according to the road, and TxDOT reviews work affecting US 59 right of way. The utility owner, not the drilling contractor, files a highway utility permit through TxDOT RULIS; we prepare the bore plan and profile for that filing. The TxDOT Laredo District reviews it. Under US 59, required cover is at least 60 inches for electric and communication lines and water lines, and 60 inches for pressurized sewer; the district may set another depth. Existing highway pavement is bored or tunneled, and rural highway bores extend under all travel lanes.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns utility lines in Ranchitos Las Lomas and Webb County?

The water provider for a specific Ranchitos Las Lomas address must be confirmed with the county or local water district before a bore is planned; public records do not match a provider to this community. A water route along Camino Las Lomas needs that address level check. AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric Cooperative report electric service in Webb County, but the line owner for the bore location must be confirmed before conduit specifications are set.

Line ownerWhat it isSourceSize
AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric CooperativeElectric utilities reporting service in Webb CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put the median housing year in Ranchitos Las Lomas at 2004; 64 percent of units were built in 2000 or later and 36 percent from 1960 to 1999. That mix can mean either a new service or replacement of older buried lines along Salsi Puedes Road. Before drilling near any marked utility, we expose it with hydrovac because paint shows position, not depth. A proposed bore beneath Salsi Puedes Road must account for each marked line along its path.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

Do you cover Colorado Acres and Ranchitos Las Lomas?

We take directional boring work in Ranchitos Las Lomas and nearby Colorado Acres, with routes planned from the specific address and road. The unincorporated community is in Webb County, covers 3.64 square miles of land and sits at an elevation of 615 feet. Its ZIP code is 78044. Los Veteranos I is 1.1 miles east, and Colorado Acres is 1.5 miles northeast. Laredo, the county seat and nearest larger city, is 16.3 miles west. Our Yukon yard is 652 road miles away, a 12.7 hour drive.

Places near Ranchitos Las Lomas

What boring work comes up along Salsi Puedes Road in Ranchitos Las Lomas?

  • Highway crossing: A route beneath US 59 needs a bore plan and profile suited to the highway right of way and the line being installed.
  • Street bore: A water or sewer line beneath Camino Las Lomas can pass below the road surface without an open cut.
  • Utility replacement: A replacement line along Salsi Puedes Road needs marked utilities exposed before the drill approaches them.
  • Fiber conduit: A conduit route near Las Lomas can be planned around existing lines and the street access for the bore pits.
  • Drainage route: A bore near the mapped unnamed drainage in Ranchitos Las Lomas needs a path that accounts for the low area and pit placement.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a directional boring quote for Las Lomas in Ranchitos Las Lomas?

Start with a map pin on Las Lomas, because the exact route determines whether the bore approaches US 59, a driveway or another marked utility. Tell us what will go in the ground, its pipe or conduit size and the footage. A sketch or plans help us check the proposed path and the access for the entry and exit pits.

The job scope sets the price: length, pipe size, soil and rock, exposed utility crossings, pavement, drainage, pits and equipment time all matter. Moglia clay loam can change the reaming plan, while a route near US 59 may involve highway requirements and pavement. A drainage crossing or difficult pit location adds planning. Mobilization also reflects the 652 road miles from Yukon, and high profile or emergency work can change the work plan.

Questions people ask about boring in Ranchitos Las Lomas

Does Trinity take directional boring jobs in Ranchitos Las Lomas, Webb County, and who staffs them?

Yes. Trinity Boring Solutions takes work in Ranchitos Las Lomas, and the job is handled by our own crews or crews from satellite yards run by vetted partner drilling contractors. The main office is in Yukon, Oklahoma. We stay involved from the first call through the bore log, including work near US 59.

Who approves a bore under US 59 in Ranchitos Las Lomas?

TxDOT reviews work in the US 59 right of way through its Laredo District. The utility that owns the line files the permit in TxDOT RULIS, while we prepare the bore plan and profile. The crossing plan must meet the permit conditions and applicable cover requirements for the line being installed.

Which electric company serves a Ranchitos Las Lomas address in Webb County, and who confirms conduit details?

The provider for a particular address cannot be assumed from county wide service reporting. AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric Cooperative report electric service in Webb County. The line owner needs to be confirmed before a conduit bore is planned, so the route and conduit requirements can be checked for the actual location.

Does Webb County or a city control Camino Las Lomas in Ranchitos Las Lomas, and can we avoid cutting it?

Ranchitos Las Lomas is an unincorporated community with no city government, so street responsibility rests with the county or state according to the road. A bore beneath Camino Las Lomas can leave the roadway uncut, but the route still needs the applicable road approval and a plan for entry and exit pits.

How old are buried lines near Salsi Puedes Road in Ranchitos Las Lomas, and does that affect replacement bores?

The American Community Survey 2019 to 2023 estimates give Ranchitos Las Lomas a median housing year of 2004, with 36 percent of units built from 1960 to 1999. That does not establish the age of any buried line on Salsi Puedes Road. For replacement work, the existing line and marked utilities need to be located and exposed along the proposed route.

Do Moglia soil and flood prone ground affect bore pits in Ranchitos Las Lomas?

They can affect pit placement and drilling fluid management. The USDA soil survey maps Moglia clay loam across 33 percent of Ranchitos Las Lomas and flood prone soils across 19 percent. It does not map a seasonal water table in the top 60 inches, but the unnamed drainage still matters when choosing a route and setting pits.

Does Trinity cover Los Veteranos I and rural sites outside Ranchitos Las Lomas?

Yes. We take work across Texas, including neighboring Los Veteranos I, which is 1.1 miles east of Ranchitos Las Lomas, and rural sites outside the mapped community boundary. The route, access and ground conditions still need to be reviewed for each address, including locations near Salsi Puedes Road.

How much Texas811 notice is needed for a bore near Las Lomas in Ranchitos Las Lomas?

Paint near Las Lomas shows a marked utility’s position, not its depth. Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.

What affects the cost of a directional bore near US 59 in Ranchitos Las Lomas?

The job details set the price, including bore length, pipe or conduit size, soil and rock, utility crossings, pavement, drainage and pit work. A route under US 59 may need highway planning, and Moglia clay loam affects drilling methods. Mobilization also matters because Ranchitos Las Lomas is 652 road miles from our Yukon main office.

Where the Ranchitos Las Lomas facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Ranchitos Las Lomas

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Ranchitos Las Lomas, Texas

Type the address of your job in Ranchitos Las Lomas. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Ranchitos Las Lomas

Same county: Rio Bravo · El Cenizo · Ranchos Penitas West · Pueblo Nuevo · Bruni · Mirando City · Oilton · La Presa · San Carlos I · San Carlos II · Tanquecitos South Acres · Ranchitos East. All counties: Texas county list.